Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
19th Avenue Street Light Improvement
25th Avenue - MCI Fiber Optic Cable Project
25th Avenue Utility Underground District 87-2
2700 Campus Drive Service Connection
3rd Avenue Beautification
Alameda De Las Pulgas Utility Locations
AT&T Fiber Optic Cable Locations
AT&T Fiber Optics Underground Cable Route
B Street Underground Assessment Undergrounding of Utilities
Between Hickory Lane and Briar Lane Electrical Plan
Brooks Fiber Communication Line
Cal Water - Water System Map
Cal Water - Water System Map (2)
Cal Water - Water System Map (3)
Cal Water - Water System Map (4)
Cal Water - Water System Map (5)
Citywide underground map of cable, audio, and television
Concrete Beam Repair - Second Avenue and El Camino Parking Garage
Coyote Point Drive Underground Utilities District
Crystal Springs Pipe Line No. 2
Delaware Street at 25th Avenue PG&E Pot Holes on Gas Main
Detail of Wall Connections of Polyethylene Pipe at Stand Pipe Structures
Detroit Drive Waterline Replacement
East 3rd Avenue - Utility Plan
East 3rd Avenue Water Main Extension Project
El Camino Real - 4th Avenue to Barneson Avenue Fire Alarm System
El Camino Real - 9th Avenue to 23rd Avenue
El Camino Real & Pacific Boulevard Utility Underground District 87-2
El Camino Real Amended Utility Underground District 87-1
El Camino Real From Borel Avenue to HWY 92 Proposed Underground District Overhead Electric and Telephone Lines
El Camino Real Proposed Underground Utility District - Phase II
El Camino Real Proposed Underground Utility Phase I
El Camino Real Underground Project Rule 20 A - Project #09-90-59.10
El Camino Real Underground Project Rule 20 A - Project #09-90-59.10 (2)
El Camino Real Utility Underground
El Camino Real Utility Underground District 86-2
El Camino Real Utility Underground District 87-1
El Camino Real Utility Underground Improvements
Existing Underground Utilities for a Portion of Sunnybrae Boulevard and College Park
Extension of Fire Alarm Conduit & Cable at El Camino Real & 4th Ave.
Fire Alarm System - El Camino Real, Downtown
J Hart Clinton Drive from Norfolk Street to Foster City Limit Utility Service Conversion
Laurie Meadows Grade Separation - 42nd Avenue
Los Prados Park Lighting
MFS Network Technologies, Inc. - Phase 1
MFS Network Technologies, Inc. - Phase 2 A & B
MFS Network Technologies, Inc. Phase 1 A
Network Summary for Parking garage for the City of San Mateo
Occidental Avenue Crystal Springs Pipe Line No. I
P.G.&.E. Enclosures For East 3rd Avenue Underground Utilities District, Project No. 90-0166
Pacific Gas & Electric (PG&E) Utility Map - Electric
Pacific Gas & Electric Company - El Camino Real to B Street
Pacific Gas and Electric (PG&E) - Abandoned Gas Lines
Pacific Gas and Electric (PG&E) Utility Map - Gas
Pacific Gas and Electric Transmission Lines, 3rd Avenue to Monte Diablo Avenue
Pacific Gas and Electric, San Mateo Creek to Poplar Avenue
Patricia Avenue, Howe Street, Norfolk Street, Ada Street, Rand Street, Fallon Avenue, Ocean View Avenue, Kathryne Avenue, Newbridge Avenue, Shoreview and J Hart Clinton Drive Cathodic Protection Plan
Peninsula Avenue From Jefferson Court to Delaware Street and San Mateo Drive at Peninsula Avenue Proposed Underground District Existing Electrical and Telephone Service
PG&E Enclosures and Undergrounding along E. 3rd Avenue
PG&E Transmission Line
Proposed Abandonment of Existing Public Utilities & Wire Clearance Easements
Proposed F.A.U System Outside and Within San Mateo City Limits
Proposed Parking Structure - 3rd Avenue
Proposed Underground Construction - PT&T
Proposed Underground District
Proposed Underground District - 5th Ave
Proposed Underground District No. 74-4
Proposed Underground District Street Widening - South Delaware Street from 2nd Avenue to 5th Avenue
Proposed Utility Conduits at 19th Avenue Freeway
Proposed Utility Underground Districts for El Camino Real, 25th Avenue, Pacific Boulevard
PUE Relocation at Parkside Lot 1, Block 5
PUE to be Abandoned at Baywood Knolls No. 3
Pumphouse Wet Well Pipe Installation
San Francisco Water Department - Alameda Line
San Mateo Drive Utility Underground District 89-1
San Mateo Drive Utility Underground District 89-1 (2)
San Mateo Park Map Showing Water Systems
Shoreview Park Lighting Improvements
South Delaware Street Proposed New Electrical and Telephone Service to Property Owners
Spring Valley Water Company Property Maps
State of California CCO NO.42
Street Light Improvements - 9th Ave. at El Camino Real to B St.
Street Light Improvements - Concar Dr. Extension
Street Light Installation at 10th Ave. and Palm Ave.
U.S. Maritime Academy Water Main
Vermont Road, Columbia Drive, Tulane Raod, Tulane Court, Parrott Drive, Montana Road, Iowa Drive, Colgate Way, Bucknell Drive, Park Boulevard, Virigina Avenue, Nevada Avenue, Georgetown Avenue Water Mains
W. Hillsdale Water Meter Installation
Water Consumption Chart 1960-1979
Water Meter Installations
Water System of San Mateo
Water System of San Mateo (2)