Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
15th Avenue Additional Electroliers Installation Plans
1985 Federal Aided Urban Map
19th Avenue and YMCA Driveway Traffic Signal Installation
19th Avenue at Delaware Street Traffic Signals
19th Avenue at Grant Street and Ginnever Street Traffic Signal Installation
1st and B Street - Traffic Controller Diagram
1st Avenue at Ellsworth Avenue Street and Signing, Striping Improvement Plan
2008 Citywide Striping Project, Project #467004
22nd Avenue Street Reconstruction, Project #467774-46000-7701
25th Avenue at El Camino Real
27th Avenue and El Camino Real - Traffic Controller
2nd Avenue and South B Street Fire Alarm and Traffic Signals
3rd Avenue at Claremont Street and 4th Avenue at Claremont Street Signal Installation
3rd Avenue at Delaware Street Traffic Signal Modification, Project No. 09-90-53.31
3rd Avenue at Humboldt Street, 4th Avenue at Humboldt Street, 3rd Avenue at Norfolk Street, 20th Avenue at Alameda De Las Pulgas Traffic Signal Modifications, Project No. T-3072(81)
3rd Avenue Traffic Improvments
3rd Street at Norfolk Street Opticom Installation
42nd Avenue at Olympic Avenue Traffic Signal and Electrolier Installation
4th Avenue at Delaware Street Relocation of Electroliers and Signals
4th Avenue at South B Street Fire Alarm and Traffic Signals
5th Avenue and Eldorado Street Traffic Circle Improvements, Project No. 466000
5th Avenue at San Mateo Drive Traffic Signal and Park Entry
5th Avenue at South B Street Fire Alarm Electroliers and Traffic Signals
9th Avenue & B Street Emergency Vehicle Preemption Plan; Project Number: 09-90-08.61-02
Accident Daigram Hillsdale
Alameda De Las Pulgas and Barneson Avenue - Traffic Signal Installation, Project #09-90-56.32
Alameda De Las Pulgas at HWY 92 Interchange Signalization and Channelization
Alameda De Las Pulgas at HWY 92 Right Turn Lane
Alameda De Las Pulgas at Kentucky Avenue Traffic Signal Installation
Alameda De Las Pulgas at Sonora Drive Traffic Signal and Electrolier Installation
Alameda De Las Pulgas Traffic Signal Installation
Average Daily Traffic Maps, Citywide ADT MAPS CITYWIDE 1955-57, 1966-67,68,69,72,74,76,77,78,79
B Street - Existing Signing and Striping
B Street at 9th Avenue, 3th Avenue at Delaware Street and San Mateo Drive at Baldwin Avenue Taffic Signal and Electrolier Improvement
Baldwin Avenue at Ellsworth Avenue Signalization
Baldwin Avenue at San Mateo Drive Traffic Signal Modification, Project No. 466000
Bay Meadows Development Signal Interconnect Plans
Block 21, Lot 1 Baywood Driveway Reconstruction
Bridgepointe Parkway Traffic Signal Installation 2006, Project No. 4466004
Building Setback at Roberta Drive & Klamath Ave.
Channelization El Camino Real And 31st Avenue
City of San Mateo City Street Traffic Index Map with R-Values at Various Locations
City of San Mateo FAU 3 Year Program and City Project Priorities Improvement 1974
City of San Mateo Smart Corridor Initial Implementation Project, Project No. 466605
City of San Mateo Stop Bars and School Crossings
City of San Mateo Truck Route
Citywide Existing Traffic Control Devices
Concar Drive and Delaware Street Island Relocation and Curb Realignment and Proposed Traffic Signals
Concar Drive Modification of Traffic Signal System, Project No. 09-90-5232
Congestion Management Plan Roadway Network For San Mateo County
Delaware Street and 1st Avenue Traffic Signal Installation, Project No. 09-90-58.36
Delaware Street at 25th Avenue Traffic and Signal Channelization
East 25th Avenue and South Delaware Street - Traffic Signal Installation
East 3rd Avenue at South Humboldt Street Change Order No. 8 Intersection Signalization, Project No. T 3072-81
East 4th Avenue at South Ellsworth Street Traffic Signals
East Hillsdale Boulevard at Norfolk Street Improvement
El Camino Real - Traffic Signal, Lighting, Signage, and Markings Construction Plans
El Camino Real at 20th Avenue Traffic Signal Relocation
El Camino Real at 25th Avenue Improvement Plan
El Camino Real at 27th Avenue Opticom Installation
El Camino Real at 5th Avenue Traffic Signal and Street Lighting Systems Modifications
El Camino Real at Aragon Boulevard Traffic Channelization Plan
El Camino Real at Barneson Avenue and El Camino Real at 27th Avenue Traffic Signals and Street Lighting, Project No. 46
El Camino Real at Barneson Avenue Opticom Installation
El Camino Real at Hillsdale Boulevard Left Turn Signal Installation
El Camino Real at Poplar Avenue Signal Modification
El Camino Real Opticom Installation
El Camino Real Traffic Signals
Emergency Vehicle Preemption Plan Signal Modification; Project Number: 09-90-08.61-02
Federal Aid Urban Boundary Map Of 1980
Fire Alarm and Traffic Signals Plans
Hillsdale and Saratoga - Redlight Photo Enforcement
Hillsdale Boulevard at El Camino Real and Alameda De Las Pulgas at HWY 92 Taffic Signal Modifications, Project No. T-3072(33)
Hillsdale Boulevard at El Camino Real Traffic Channelization Changes
Hillsdale Shopping Center - 31st Avenue
Howard Avenue at Idaho Street and Bayshore Boulevard Signing for Position
HWY 92 at Norfolk Street Opticom Installation
J Hartman Clinton Drive at U.S. 101 Interchange Improvements
J. Hart Clinton Drive Traffic Signal Installation, Project No. 09-90-22.41
J. Hart Clinton Drive Traffic Signal Installation, Project No. 09-90-54.34
Map of El Camino Real Curbs, Buildings and Electroliers
Map of Trafficways for San Mateo County
Master Count Stations -1973
Maywood Subdivision District Assessment Map for Electrolier System
Modification to Traffic Signal System
Norfolk Street at Hillsdale Boulevard Traffic Signal Modification
North Humboldt Street at East Santa Inez Avenue Stop Signs
North San Mateo Drive at Peninsular Avenue Traffic Signals and Electrolier Installation
Notre Dame Avenue Sign Installation
Occidental Avenue at Warren Road Street Improvement
Pacific Blvd. Improvements - Change Order 2
Peninsula Avenue Traffic Condition Diagram
Peninsular Avenue at North Delaware Street Traffic Signal and Electrolier Installation
Poplar Avenue at Delaware Street Signal Modification
Portola Drive at Isabelle Avenue at Del Mar Way Intersection Traffic Improvements
Proposed Acquisition - West Hillsdale Boulevard
Proposed Modification El Camino Real & West Hillsdale
Proposed Signalization - El Camino Real & Bellevue
Proposed Signalization - El Camino Real & Bellevue Avenue
Proposed Traffic and Signal Channelization
Redlight Photo Enforcement Hillsdale and Norfolk
Redlight Photo Enforcement Hillsdale and Saratoga San Mateo, California
San Mateo Drive at Second Avenue Traffic Signal Modifications
San Mateo Drive, B Street, 3rd Avenue and 4th Avenue New One Way Streets
Saratoga Drive and Hillsdale Boulevard Signal Modifications
Second Avenue and South Ellsworth Avenue Fire Alarm and Traffic Signals
Select System Street Mondification No.3 & No.4
Serra High School Layout
Sight Distance at 1734 Echo Ave.
Sight Distance at 3115 Hacienida St.
Sight Distance at Eaton road
Signal and Lighting Details at Poplar & El Camino Real
State Route 92 at Alameda De Las Pulgas Opticom Installation
Stop Sign Location Map
Tilton Avenue at El Camino Real Traffic Signal Relocation
Traffic Lane Diagram Intersection Improvment
Traffic Signal & Electrolier Change Order #2
Traffic Signal Installation at Alameda De Las Pulgas and Parrott
Traffic Signal Installation at El Camino Real & 25th Ave.
Traffic Signal Interconnect Existing and Proposed
Traffic signal Modifications at El Camino Real at Poplar Avenue, Project No. 97003x61
Traffic Signal Study
Traffic Signals & Lighting along El Camino Real - Peninsula Ave. to 19th Ave.
Traffic Signals Along El Camino Real
Traffic Signals at East Poplar Avenue and North San Mateo Drive, East Poplar Avenue and North Delaware Street, Tilton Avenue and North San Mateo Drive
Traffic Volume Flow Map 1966-1967
Truck Routes Map
Truck Routes Ord. 1969-25
West Hillsdale Boulevard at Edison Street Traffic Signal and Electrolier Installation
West Hillsdale Boulevard at West Sailer Drive Traffic Signal Modification