Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
Alternative Supplemental Environmental Project (SEP)
Approval CMOM Plan Modification - Line Cleaning Performance Standards and Acoustic Testing
First Material Amendment to Consent Decree (10/10/2013)
Revision of CSO Control Measure Design Criteria - Appendix D (Lemay CSO Outfall 063)
Revisions of CSO Control Measure Design Criteria - Appendix D, Appendix E (Lemay CSO Outfall 063 and River Des Peres Storage Tunnels)
Second Material Amendment to Consent Decree (06/22/2018)
Third Material Amendment to Consent Decree (01/17/2023)
Approval CMOM Plan Modification - Pump Station and Force Main Inspection and Testing Modification (12/10/2020)