Loading...
HomeSearchMy Public PortalAbout15101 Caulks Creek Forcemain Rehabilitation (11789)15103 Lemay Public II Reduction (2019) Contract D (12038)15104 FF-18 Villa Dorado - Lackland - Page Sanitary Relief (Adie Rd to Villa Dorado Dr) (10018)15105 Schaeffer Place 2000 Block Storm Sewer (11621)15106 Tina Terrace Drive Storm Sewer (11407)15108 Deer Creek Sanitary Tunnel (Clayton Rd to RDP) (Design Supplemental) (11731)15109 Defined Contribution Plan Update15110 Pension Plan Ordinance Update15111 Deferred Compensation Plan15115 82nd Street to I-170 Sanitary Relief (UR-08, UR-09) (11993)15116 Clara 523 Combined Sewer Improvement (12836)15117 Green Park and Lakeshire II Reduction (Tesson Ferry Rd and Green Park Rd) (12372)15118 Hermitage Sanitary Relief (SKME-615) (10863)15119 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13041)15120 Mackenzie Public II Reduction (Resurrection Cemetery, Wehner Park, Kenrick Seminary, and Nerinx Hall) (12511)15121 Olive Washington - Grand to Vandeventer Combined Sewer Relief (12702)15122 Winchester Drive 7120 Bank Stabilization (11026)15123 Snelson Drive Storm Sewer (10336)15126 Bissell Point WWTF Redundant Sludge Acceptance System (12828)15127 CSO Volume Reduction Green Infrastructure (11146)15128 Earth City Shoreline Pump Station (P-704) Replacement (12155)15131 Lackland Rd. ΓÇô Uceyle Ave. Storm Sewer (11304)15132 Queen Anne Place at Sappington Storm Improvements (12767)15133 Saxonhall Drive #10965 Storm Sewer (11420)15134 Bissell & Lemay WWTF Fluidized Bed Incinerators (12565)15135 Emergency Repair #061 (Caulks FM at 667 Water Works Road) (13323)15138 Bissell ΓÇô Coldwater ΓÇô Missouri ΓÇô Meramec Public II Reduction (2019) Contract A(12029)15139 Creve Coeur Creek Sanitary Trunk Sewer Relief Phase VI (SKME-021) (11729)15140 Ashland & Semple Bioretention (CB 4364) CSO VR GI (12890)15141 Era Ave. 5800 Block Sewer Separation (10856)15142 Gravois Trunk (Whitecliff to RDP) Sanitary Relocation Phase VI (Buckley Rd to Union Rd)15143 Infrastructure Repairs (Rehabilitation) (2019) Contract B (12018)15144 Jennings Station Road North Baden Basin (11142)15145 University City II Reduction ΓÇô East (UR-08 and UR-09) (11984)15147 City Lakes Storage Modifications for CSO Control (12794)15149 Stone Hill Dr 4701 Storm Sewer (11033)15150 Marmont Court #339 Storm Sewer (11489)15152 Workforce Development Grant Program Ordinance15153 Cardinal Point Partners - Federal Legislative Services15155 Glen Eagles Pump Station P-189 Improvements 1291415156 Riverside and Yarnell Sanitary Relief Replacement 1284015157 Forder Sanitary Interconnection Forder Rd to Ringer Rd 1218015158 Deer Creek Watershed Initiative 1106515159 Harvest Hill Ct. Bank Stabilization 1156915160 Infrastructure Repairs Rehabilitation Stormwater 2019 1304315161 Liberty Ave. 10000 Block Storm Sewer 1130615162 Meaux Mart Gray Storm Channel 1117115163 Glenn Drive 128 Storm Sewer 1142615165 Lemay No. 3 Pump Station and Force Main 1181715166 OMCI Stormwater Design Contract D 1114915168 Employee Benefits Consulting Services Ordinance15170 FY2020 Budget Appropriation Ord15171 Underground Storage Tank Insurance Ordinance15172 Public Official Excess Liability Insurance Ordinance15173 Combined Liability Insurance Program15174 Auto Liablity Insurance Program15175 Commercial Crime Insurance Coverage15176 Contractors Equipment Inland Marine Insurance Program15177 Cyber Liability Insurance Program15178 Excess Umbrella Liability Program First Layer Ordinance15179 Excess Umbrella Liability Program Second Layer Ordinance15180 Excess Flood Earth Movement Insurance Coverage15181 Excess Workers' Compensation Insurance Coverage15182 Fiduciary Liability Insurance Coverage15183 Major Facility Pollution Liability Insurance Coverage Ordinance15184 National Flood Insurance Program NFIP15184 National Flood Insurance Program NFIP_015185 Owners Pollutions Protective Insurance Program15186 Property and Bolier Machinery Coverage15187 Blocked Main and Overcharged Line Back-Up Insurance Program15188 GC- Armstrong Teasdale - General Legal Services15189 GC Hale Law Firm - General Legal Services15190 GC Rynearson Suess - General Legal Services15191 GC Thompson Coburn - General Legal Services15192 CSO Volume Reduction Green Infrastructure ΓÇô Catholic Charities of St. Louis Cathedral Tower15195 Tesson Creek II Reduction (Tesson Ferry Rd and Tiffany Square Pky) (12228)15197 DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase III and Phase IV (12472)15198 Easement Acquisition for Wastewater Projects (2020) (12516)15199 Beldon Drive Storm Sewer (11501)15200 Craig Road #1485 Storm Sewer Improvements (11587)15201 Easement Acquisition for Stormwater Projects (2020) (12683)15202 HunterΓÇÖs Glen Ct. #305 Storm Sewer (11608)15203 Stormwater Infrastructure Repair Replacement ΓÇô Districtwide (2020) (12675)15204 DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase III and Phase IV (12472)(Design Supplemental)15205 Emergency Repair #062 (Coldwater Creek FM at 13077 Fox Haven Ct) (13360)_015206 Force Main Evaluation Program Support (Condition Assessment) Professional Services15207 HR Classification Plan 201915208 HR Compensation Plan 201915209 Oakley Lease15210 CSO Volume Reduction Green Infrastructure ΓÇô River Des Peres (13078)15211 Infrastructure Repairs (Wastewater) (2020) (12010)15212 Lemay No. 3 Pump Station and Force Main (11817) (Substation Upgrade)15213 Rainridge Ct. Property Buyout (13302)15214 Brookvale Terrace Parkfield Terrace Storm Improvements (11600)15215 Brookshire Sanitary Relief (Brookshire Dr to Cougar Dr) (12104)15215 Brookshire Sanitary Relief (Brookshire Dr to Cougar Dr) (12104)_015216 Conway Village Sanitary Relief15216 Conway Village Sanitary Relief_015217 Bissell Coldwater Missouri Meramec Sanitary System Improvements (11144)15218 Bissell Coldwater Missouri Meramec Public II Reduction (2021) Contract A (12508)15219 Bissell Coldwater Missouri Meramec Public II Reduction (2021) Contract B (12509)15220 Fenton Creek Pump Station (P-425) Improvements (12166)15221 Fishpot Trunk West and Ed Lou Lane I-I Reduction15222 Grand Glaize Trunk Sanitary Relief (Ballwin Golf Club to Claymont Cove Ct) (12272)15223 Lower Meramec Tunnel II Source Reduction (13164)15224 Oakwood Farms Pump Station (P-470) Elimination (12364)15225 Saylesville Sanitary Relief (Saylesville Dr to S Greentrails Dr) (12200)15226 Schuetz Road Sanitary Relief (Forest Brook Ln to Sunny Wood Ct) (10161)15227 St. Jacques Sanitary Relief (St. Jacques St to N Lafayette St) (12213)15228 Valley Public II Reduction (Clarkson Rd and Kehrs Mill Rd) (12507)15229 Lemay Sanitary System Improvements (11145)15230 Lemay Public II Reduction (2021) Contract A (12059)15231 Price to Pioneer Sanitary Relief (12368)15232 St. George Creek Sanitary Relief (Daisy Ln to Gravois Rd to New Hampshire Ave) (12212)15233 WW-2 and WW-3 Warson Woods Sanitary Relief (12302)15234 Lower & Middle RDP CSO Controls System Improvements (11109)15235 Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711)15236 Jefferson Barracks Tunnel Consolidation Sewers (11957)15237 Lemay No. 3 Pump Station and Force Main (11817)15238 LMRDP CSO Storage Tunnel (Broadway to RDP Tubes) (11820)15239 Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656)15240 RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153)15241 Lower Meramec River System Improvements ΓÇô Baumgartner to Fenton WWTF Tunnel (11746)15242 RDP Tributaries (Deer Creek) CSO Tunnel (12441)15243 Upper RDP (University City) CSO Storage Tunnel (12440)15244 CSO Volume Reduction Green Infrastructure ΓÇô Opus ΓÇô Soulard (13333)15245 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13041)15246 Lower Meramec WWTF Corrosion and Humidity Control Improvements (12499)15247 CSO Volume Reduction Green Infrastructure ΓÇô 4008 Chippewa St. Burger King (13316)15248 CSO Volume Reduction Green Infrastructure ΓÇô Hawthorne School (13376)15249 CSO Volume Reduction Green Infrastructure ΓÇô Mixed Use Redevelopment ΓÇô Gateway Lofts15250 Infrastructure Repairs (Facilities) (2020) (12897)15251 Langley and Philo Sanitary Storage (13336)15252 Hickory Tree Ln. Storm Sewer (11589)15253 Capilia Sanitary Relief (Grant Rd to Capilia Dr) 1211115254 Lindley Drive Sanitary Relief (I-I70 to Ashmont Dr) (UR-07) 1232915255 Critical Infrastructure Assessment and Asset Investigation (2020) (12907)15265 MSD Subordinate Wastewater System Revenue Bonds - CW Ordinance (2019A)115267 CSO Volume Reduction Green Infrastructure ΓÇô Bauer Equity Partners W. Florissant Warehouse15268 Bissell ΓÇô Coldwater ΓÇô Missouri ΓÇô Meramec Public II Reduction (2020) Contract C (12027)15269 Creve Coeur Creek Public II Reduction South (12432)15269 Creve Coeur Creek Public II Reduction South (12432)_015271 Lemay Public II Reduction (2020) Contract A (12057)15272 Mackenzie II Reduction (Resurrection Cemetery, Wehner Park, Kenrick Seminary, and Nerinx15274 Guenevere Dr ΓÇô Barham Down Storm Improvements (11030)15275 Lalite 6145 ΓÇô 6151 Storm Improvements (11419)15277 Bissell Point WWTF Trickling Filter Media Replacement (12566)15278 General Services Agreement ΓÇô Facility & Sewer Design (2020) Contract A (12397)15279 General Services Agreement ΓÇô Facility & Sewer Design (2020) Contract B (13059)15280 Louisa and Arsenal Pump Stations (P-112 and P-113) Upgrades (12489)15281 Lower Meramec WWTF Expansion Phase II (Construction Management) (12255)15282 GC - Conflict of Interest Policy 2019 Ordinance15283 HR - LONG-TERM DISABILITY (LIBMUT) Ordinance Doc15284 2019 Bond Financing Team Ordinance15285 2019 Tax Ordinance Levy15286 CSO Volume Reduction Green Infrastructure ΓÇô Parkview Place Parking (13392)15287 CSO Volume Reduction Green Infrastructure ΓÇô SLU Interdisciplinary Science and Engineering15288 CSO Volume Reduction Green Infrastructure ΓÇô West Pine Townhomes (13230)15289 CSO Volume Reduction Green Infrastructure ΓÇô 6317 Clayton Parking Lot (13365)15290 CSO Volume Reduction Green Infrastructure ΓÇô Lyon School (13390)15291 Gravois Trunk (Whitecliff to RDP) Sanitary Rehabilitation (Fannie Ave to Pardee Lane) (10496)15292 Bissell ΓÇô Coldwater ΓÇô Missouri ΓÇô Meramec Public II Reduction (2020) Contract B (12030)15293 Infrastructure Repairs (Rehabilitation) (2020) Contract A (12020)15294 Shiva Court Channel Improvements (CAU3-A) (10262)15295 Linden #1064 Storm Sewer (10289)15296 Steeplechase Storm Sewer Improvements (Frontenac 3-3) (11239)15297 MoDOT I-270 betterments ordinance15298 Bissell & Lemay WWTF Fluidized Bed Incinerators (12565)15299 General Services Agreement ΓÇô Geotechnical (2020) Contract A (12391)15299 General Services Agreement ΓÇô Geotechnical (2020) Contract A (12391)_015300 General Services Agreement ΓÇô Geotechnical (2020) Contract B (12392)15301 General Services Agreement ΓÇô Geotechnical (2020) Contract C (12393)15301 General Services Agreement ΓÇô Geotechnical (2020) Contract C (12393)_015302 General Services Agreement ΓÇô Survey Services (2020) Contract A (12413)15303 General Services Agreement ΓÇô Survey Services (2020) Contract B (12416)15304 General Services Agreement ΓÇô Survey Services (2020) Contract C (12417)15305 General Services Agreement ΓÇô Survey Services (2020) Contract D (12418)15306 General Services Agreement ΓÇô Survey Services (2020) Contract E (12419)15309 Stream Flow Water Quality Sampling (2020) (12004)15310 REVISED Purchasing Ordinance 9-23-1915311 Ordinance(Series 2019B)(Parameters)15312 Ordinance(Series 2019C)(Parameters)15313 Clara 523 Combined Sewer Improvement (12836)15313 Clara 523 Combined Sewer Improvement (12836)_015314 CSO Volume Reduction Green Infrastructure ΓÇô Delmar Parking Facility (13419)15315 CSO Volume Reduction Green Infrastructure ΓÇô Olive West Redevelopment (13317)15316 CSO Volume Reduction Green Infrastructure ΓÇô Steelcote Brewery (13381)15317 CSO Volume Reduction Green Infrastructure ΓÇô Porsche Display Campus (13380)15318 CSO Volume Reduction Green Infrastructure (11146)15320 Infrastructure Repairs (Wastewater) (2020) (12010)15322 Upper Maline Trunk Sanitary Relief Phase IV Section C Public II Reduction (12247)15323 White Birch Pump Station (P-725) Elimination 1258315324 MC-02 Watson to Edgar Rd Sanitary Relief (SKME-580A) (10024)15326 GC ORD State Legislative Lobbying Services15327 FINAL Classification Plan Ordinance15328 FINAL Compensation Plan Ordinance15329 2020 Bond Authorization Ordinance15330 CSO Volume Reduction Green Infrastructure ΓÇô Central Baptist Church (13155)15331 CSO Volume Reduction Green Infrastructure ΓÇô 30 Brentmoor Park (13379)15332 CSO Volume Reduction Green Infrastructure ΓÇô Mercedes Benz of St. Louis (13448)15333 CSO Volume Reduction Green Infrastructure ΓÇô The Network Building (13391)15346 Forder Sanitary Interconnection (Forder Rd to Ringer Rd) (12180)15351 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13041)15351 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13042)15351 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13043)15351 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13044)15356 Harlem – Baden Detention Basin Bioretention CSO VR GI (12916)15356 Harlem – Baden Detention Basin Bioretention CSO VR GI (12917)15356 Harlem – Baden Detention Basin Bioretention CSO VR GI (12918)15356 Harlem – Baden Detention Basin Bioretention CSO VR GI (12919)15357 CSO Volume Reduction Green Infrastructure – Morning Star Missionary Baptist Church Parking15357 CSO Volume Reduction Green Infrastructure – Morning Star Missionary Baptist Church Parking (2)15357 CSO Volume Reduction Green Infrastructure – Morning Star Missionary Baptist Church Parking (3)15357 CSO Volume Reduction Green Infrastructure – Morning Star Missionary Baptist Church Parking (4)15358 CSO Volume Reduction Green – Red Sea Eritrean Community Center (13451)15358 CSO Volume Reduction Green – Red Sea Eritrean Community Center 1345115360 Beldon Drive Storm Sewer (11501)15368 Glenn Drive No 128 Storm Sewer (11426)15368 Glenn Drive No 128 Storm Sewer (11427)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13449)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13449) (1)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13449) (2)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13450)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13451)15381 Bond Election 202015383 CSO Volume Reduction Green – Ranken – 4300 Evans Ave (13496)15384 CSO Volume Reduction Green Infrastructure – SSM St. Mary's Hospital – South Parking Lot