Loading...
HomeMy Public PortalAbout030_010_Eng Opinion of Constr Cost-LS#6 FM City of Tybee Island Engineer's Opinion of Probable Construction Cost - LS#6 Force Main SANITARY SEWER SYSTEM Item Description Quantity Units Unit Price Total 1 12"0 C-900 PVC Force Main 5,280 LF $ 40.00 $ 21 1,200.00 2 12" Fusible PVC Directional Drill 250 LF $ 180.00 $ 45,000.00 3 Fittings 2,800 lbs $ 8.00 $ 22,400.00 Connect New 12"0 Force Main to Existing 12 4 0 Force Main 2 LS $ 2,000.00 $ 4,000.00 5 Remove/Replace Asphalt Pavement 80 SY $ 70.00 $ 5,600.00 6 Remove/Replace Gravel 4,500 SY $ 25.00 $ 112,500.00 7 Erosion &Sedimentation Control 1 EA $ 25,000.00 $ 25,000.00 8 Grassing 0.5 Ac $ 3,000.00 $ 1,500.00 9 Air Release Valve in Manhale 4 EA $ 4,500.00 $ 18,000.00 Sub-Total, SANITARY SEWER SYSTEM $ 445,200.00 Surveying, Engineering, DOT Permit & Constr. Admin. $ 46,746.00 Contingencies $ 66,780.00 TOTAL PROJECT ESTIMATE $ 558,726.00 Since the Engineer has no control over the cost of labor, materials, equipment, the Contractor's methods of determining prices, or over competitive bidding or market conditions, the Opinions of Probable Construction Costs provided for herein are made on the basis of the Engineer's experience and qualifications. These opinions represent the Engineer's best judgment as a design professional familiar with the construction industry. However, the Engineer cannot and does not guarantee that proposals, bids, or the construction cost will not vary from Opinions of Probable Construction Costs prepared by him/her. C:\Users\aciitdments\tybee\Eng Opinion of Constr Cost-LS#6 FM.xls