HomeMy Public PortalAboutDRIFTWOOD & SANDLEWOOD CROSSOVERSDATE ISSUED: 03 -12 -2013
WORK DESCRIPTION
WORK LOCATION Dr
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
(39
an
CITY OF TYBEE ISLAND
BUILDING PERMIT
DISCOVERY / TEAROUT ONLY
SANDLEWOOD CROSSOVERS
SEASHORE COLONY HOMEOWNER'S
7 PALMWOOD CT
TYBEE ISLAND GA 31328
CATSKILL BUILDERS, INC.
210 CATALINA DR.
TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$15,000.00
PERMIT #: 130161
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Property Address:
Sh cs-e--- < o 'c"
t v�
City of Tybee Island, G orgia
912 - 472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
\e a 49r s,
❑ Single Family
❑ Duplex
❑ Mufti-Family units
❑ Commercial units
Details of Project: 2civ.0ve-
4 1 ,, e
(Check all that apply)
Discovery/Tearout
❑ Footprint Changes —
new square feet
heated /cooled
De 06%73 4- --- r-c \ s t, '
cryP w v f ? Gv.y t�l�o -e�-. \�� S� 1� S
IS,
C-2GL?
,.►,.h d-
e moli ' n of Structure
Other
Co-o 1- s
00
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
* Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through P ,—,• . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility f y correst+vaction that
may be necessary to restore drainage impaired by this permitted construction. O vv.
Date: 3 ) l 13 Signature of Applicant:
Printed Name A'S
Note: A permit normally takes 7 to 10 days to process
Approvals: Signatur• ate
Planning & Zoning Manager ,& j v
Building Official
Water /Sewer
Storm /Drainage
City Manager
\0fl -1— fg �-�i o �� + g3 per (,Oo3
FEES
Permit
Inspections
Cap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
; Ma "ling Address
Telephone
Owner
1
5e0y.4-•�„e���
' ri.r.,) C-c-
Home: $ L . Lt-i0 1
Cell:
Architect or
Engineer
,---- ,----
Contractor
C,�50'\-Ls\
Office: g i:7
Cell: ate ec),-)
❑ Single Family
❑ Duplex
❑ Mufti-Family units
❑ Commercial units
Details of Project: 2civ.0ve-
4 1 ,, e
(Check all that apply)
Discovery/Tearout
❑ Footprint Changes —
new square feet
heated /cooled
De 06%73 4- --- r-c \ s t, '
cryP w v f ? Gv.y t�l�o -e�-. \�� S� 1� S
IS,
C-2GL?
,.►,.h d-
e moli ' n of Structure
Other
Co-o 1- s
00
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
* Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through P ,—,• . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility f y correst+vaction that
may be necessary to restore drainage impaired by this permitted construction. O vv.
Date: 3 ) l 13 Signature of Applicant:
Printed Name A'S
Note: A permit normally takes 7 to 10 days to process
Approvals: Signatur• ate
Planning & Zoning Manager ,& j v
Building Official
Water /Sewer
Storm /Drainage
City Manager
\0fl -1— fg �-�i o �� + g3 per (,Oo3
FEES
Permit
Inspections
Cap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http:// www. gaswcc .org /docs /field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date
Printed Name
`<< �GE�oRGI
COASTAL RESOURCES DIVISION
MARK WILLIAMS
COMMISSIONER
FEB--82013
Seashore Colony Homeowner's Association
c/o Kevin Sofa
P.O. Box 1961
Tybee Island, GA 31328
RECEIVED
A.G.'SPl1D' WOODWARD
DIRECTOR
RE: Letter of Permission (LOP), Maintenance of two (2) existing dune crossovers,
Tybee Island, Chatham County, Georgia
Dear Mr. Sofa:
This letter is in response to your recent request received January 29, 2013 to perform
maintenance on two existing dune crossovers that provide access to the beach on Tybee Island.
One of the existing dune crossovers commences from the Driftwood Court. The second
crossover provides the beach access at the seaward terminus of Sandlewood Court. Each
proposed project includes the replacement of the existing structure as needed.
The existing dune crossovers were permitted under SPC Permit #148. The proposed work on
both crossovers on Driftwood and Sandlewood Court will include routine maintenance generally
within the original footprint with an extension seaward in order to provide access across the
existing dunes. As proposed, the extensions will protect the dynamic dune field by preventing
unnecessary foot traffic in the existing dune field.
The Department authorizes the proposed maintenance and extension of the existing dune
crossovers as identified in the attached aerial. As proposed, all work will be done using hand
tools only. No vegetation is to be disturbed beyond the limits of the project during construction.
Any incidental impacts to the dunes or vegetation must be restored to pre - project vegetated and
topographic condition; any backfilling must use beach quality sand obtained from an upland
source. No storage of construction materials is permitted within the dunes. This LOP is valid for
the above referenced projects only. Any change in the use, location, dimensions, or configuration
of the approved project, without prior notification and approval from this office could result on
the revocation of this permission and in the required removal of the materials and related
structures. This project must comply with all other Federal, State, and local statutes, ordinances
and regulations.
If the project occurs between May 1st and October 31st, turtle nesting season, an individual with a
DNR Sea Turtle Cooperators Permit must survey the area of the pilings and concrete and the
access to be used by the equipment prior to the work beginning. All sea turtle nests must be
avoided and no heavy equipment may be used within 20' of a nest area.
ONE CONSERVATION WAY BRUNSWICK, GEORGIA 31520-8686
912.264.7218 I FAX 912.262.3143 WWW.COASTALGADNR.ORG
Seashore Colony Homeowners r iciation Crossover LOP
Page 2 of 2
FEB - 8 2013
If you have any questions or concerns about this project feel free to contact Deb Barreiro at
912.266.3695 or deb.barreiro @gadnr.org.
Sincerely,
Brad Gane
Chief '
Ecological Services Section
enclosures: aerial of the proposed project area;
cc: City of Tybee Island Planning and Zoning
file: Chatham 1241986 120200AM SPA148