Loading...
HomeMy Public PortalAbout10-0389 PulferCity of Tyii'ee Island • Community Developbnent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. /`2 -L7 is y Owner's Nacre / .,"} Z. Gen. Contractor ,/G /S Date Requested Date Needed Subcontractor 7/ antenk INTERNATIONAL CODE COLNCIC MEMBER Contact Information / f Project Address 1... Scope of Work 1 ;200 /= Inspector -70 Date of Inspection Inspection ? f C;1 / -7'JI4 /- Pass Fail ® Fee Inspection Pass Fail ® Fee inspection Pass LJ Fail El Fee Inspection Pass r--y F,. Fee DATE ISSUED: 07 -28 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPLACE ROOF/RESHINGLE 134 LEWIS AVE ERIC D. & SHEIL PULFER PO BOX 1082 TYBEE ISLAND GA 31328 -1082 RPI RESIDENTIAL INC PO BOX 995 RICHMOND HILL GA 31324 P $ 117.00 $8,950.00 PERMIT #: 100389 TOTAL BALANCE DUE: $ 117.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Owner - 8�Ndyv ,STc )314 L e „A 3 A v Architect or Engineer Building Contractor P P .-f- LI J 9 L or) q L cJ .d e-: CI 0-7S6- E- 7g C3 Location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT NAME ADDRESS PIN # TELEPHONE (Check all that apply) ❑ Repair X Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: cs cis' Residential Single Family ❑ Duplex ❑ Multi- Family n Commercial ❑ Footprint Changes ❑ Discovery © Demolition (,x, 5•j: s1: «% , 'O{ f Estimated Cost of Construction: $ q5-0 ons ction Type (1) Wo d Frame (2) Woo' & Maso (3) Brick eneer Proposed us Remarks: (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH A COY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following info a'',on based on the construction drawings and site plan: # Units Lot Area # Off - street p rking spaces Trees located & listed on site p Access: Driveway (ft.) Setbacks: 'ront # Bedrooms # Bathrooms Living space (total sq. ft.) Wi culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade oft e building to the extreme high point of the building, exclusive of chimneys, heating units, yen ilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by r p 1-ru� by means of ebn -"mac:" I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 7 - a 7- /r- Signature of Applicant: 7. Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signature Date FEES O 27 Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL / '� DEFT. Ce RATVIAL RESOURCES GEORGIA Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned (?oJe r- -t 80`Sk7 Printed Name Date Office Use Only: Project Address: Permit Number: