HomeMy Public PortalAboutNINTH TE_17 & 19.pdfCITY OF TYBEE ISLAND
403 Butler Ave
PO Box 2749
Tybee Island, GA 31328 -2749
Ph (912) 786 -4573 FAX (912) 786 -5832
Vendor # :
Issued to:
01- 002055
DAVIS ENGINEERING, INC
P 0 BOX 1663
TYBEE ISLAND, GA 31328
F.O.B. Point - Tybee Island, GA
PUk;HASE ORDER
PO Number: 14 -26810
This number must appear on a re ated
correspondence, shipping papers and invoices.
Date:
Ship to:
05/29/ 2014 Requisition # : 14 26810
CITY HALL
403 BUTLER AVENUE
T Y B E E I S L A N D , GA 3 1 3 2 8
Terms - Net 30 days
UNE UNITS
DESCRIPTION
PRICE AMOUNT
1
0.00 Eng - 9th Ter - Stoeffle 100 - 7220 -52 -1203
Davis Engineering, Inc. invoice #21304301 dated
05/29/2014 for engineering at Lots 16 and 17 on
Ninth Terrace - Stoeffler
Purchase Order void after 90 days.
0.00 35.0.00
Special Instructions:
I agree to provide the items /services listed on this
purchase order and accept the Purchase Order
Terms and Conditions that accompany this form.
Supplier Acknowledgement Date
TOTAL
350.00
Authorized by
For the City of Tybee Island
Date
DATE ISSUED: 06 -04 -2014
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
ENGINEERING FEES
ABANDONED PROJECT
17 & 19 NINTH TER
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
912 - 786 -4542
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
P
$ 850.00
PROJECT VALUATION $ 1.00
Engineering fees through end of fiscal year — due by
June 19, 2014 TOTAL BALANCE DUE:
PERMIT #: 130477
$ 350.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Aer,t-
DAVIS ENGINEERING, INC.
PO Box 1663 Tybee Island, Georgia 31328
Tel. (912) 695 -7262 dkdbus @gmail.com
May 29, 2014
Diane Otto
City of Tybee Island
P.O. Box 2749
Tybee Island, GA 31328
RE: Lots 16 &17 9th Terrace
08 -16 -13
08 -28 -13
08 -30 -13
Invoice # 21304301
Phone (912) 786 -4573 Fax: (912) 786 -9539
1.0 9th Terrace Plan /Design review
0.5 Design review response to Mark
0.5 Site meeting w /Joe Wilson & Mark Boswell
2 hours @ $175 /hr. = $350
DATE ISSUED: 07 -30 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
BUILDING PERMIT
ABANDONED PROJECT
17 & 19 NINTH TER
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
912 - 786 -4542
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
P
$ 500.00
PROJECT VALUATION $ 1.00
;
`or.{ ; '� T ,fir
�q. ii it tI' SEE
MI
PERMIT #: 130477
TOTAL BALANCE DUE: $ 500.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
DATE ISSUED: 07 -30 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ABANDONED PROJECT
17 & 19 NINTH TER
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
912 - 786 -4542
DESOTO BEACH PROPERTIES LLC
PO BOX 1398
TYBEE ISLAND GA 31328
P
$ 500.00
$ 1.00
PERMIT #: 130477
TOTAL BALANCE DUE: $ 500.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
/5-r.„;e-
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
J3 -o4177
CITY OF TYBEE ISLAND
Application for a New Construction Permit
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone 912.472.5030 • Fax 912.786.9539
f EC
07
IVED
SAO
pages 1 — 7 of permit application
Required submittals: ,/ 2 sets building plans
1 copy REScheck or COMcheck
1 copy certified survey showing existing ground elevations, flood zone(s), and trees
3 sets certified hydrology, drainage and erosion control plans
$250 plan deposit (will be forfeited if project is abandoned) check # / 1
11
Street address tJ of 1.) Ninth Terrace, Tybee Island, GA 31328 PIN # 4- 0006- 05 -006C
NAME MAILING ADDRESS PHO
Owner
n rrc +
Jim toeffler
po / 3`'6 T y (tv 5gy.-
¢ r ? f 3 7-
Home: 9/ 2 ?'Y9
Cell: 9 j z_ s'4,'.2 _ ;706
Architect
or Engineer
Sanders Trowell & Associates
22 West Bryan Street
#155
Savannah GA 114001
Office:
Cell: 912-323-1220
Contractor
W. H. Strong Company
22 E. Liberty Street, Savannah,GA 31401
Office912- 233 -7690
Cell: 912- 272 -0201
Check all that apply:
New Construction
❑ Other
❑ Commercial
Residential
Single Family
❑ Duplex
Multi- Family units
Details of project: Single family, new construction (RX)1/ vY14 q
Estimated cost of construction: $ 300,000 A copy of the contract maybe requested.
Construction type: 1 (select appropriate number below)
1. wood frame 3. brick veneer 5. steel & masonry
2. wood & masonry 4. masonry 6. other:
Lot area 4,192.8 sq. ft. # buildings 1 # units 1
# floors 2 # bedrooms 2 # bathrooms 3
# of egresses 1., An elevator is not an accepted means of egress.
Height 35' Vertical distance is measured from the average adjacent grade of the lot to the extreme high point of
the building (roof ridge, handrail, etc.), exclusive of chimneys, HVAC units, elevators, and similar appurtenances.
Total heated /cooled square footage 1,853
Flood Zone AE (AE or VE)
Base Flood Elevation 12 Design Flood Elevation (BFE + 1 -foot)
As -built setbacks: Front 12' 1 3/16"
Total driveway(s) width
Rear 10' 0 3/8 " Sides (L) 10' 1 3/4"
(R) 10'49/16"
feet # of openings Culvert? Swale?
Number of off - street parking spaces
Number of trees to be removed Approx. 14
A separate tree removal permit is required.
1
2/28/2013
During construction on -site restrooms will be provided by A -OK
Construction debris will be disposed by Atlantic Waste by means of 30 YD Container
Section 22 -169 — When active work ceases on the project for the day a SECURE COVER shall be placed over
the dumpster or container so as to prevent trash or construction debris from being blown out.
I understand that I must comply with zoning, erosion control, building, fire, shore protection, and wetland
ordinances, FEMA regulations, and all other applicable codes and regulations. I understand a foundation
survey and certification letter are required as soon as the foundation is in place to ensure that the setback
requirements will be met. I understand an Elevation Certificate — Building Under Construction is required
immediately after lowest floor or flood proofing is completed. I realize that an as -built survey, Elevation
Certificate — Finished Construction, Breakaway Wall Certification, Recorded Nonconversion Agreement,
Energy Code Compliance Certificate, tree mitigation, height certification, drainage certification, and site
acceptance by the City will be required. I accept financial responsibility for any expenses the city incurs for
third -party engineering services related to this project.
I agree to construct/place all equipment such as air conditioning compressors, ducts, water heaters, furnaces,
electrical outlets, etc., at or above the required Design Flood Elevation (Base Flood Elevation + 1- foot).
Projects must demonstrate they are in compliance with the City of Tybee Island Stormwater Management
requirements as outlined in Article 16 of the Land Development Code. As part of the approval process,
applicants must illustrate how these requirements will be met, including how stormwater naturally flowed on the
property prior to any development activity, and what changes in stormwater flow will occur.
A permit normally requires 7 to 10 business days to process.
Signature of applica
Printed name: Walter Strong
Date: 7/
The following will be completed by City of Tybee Island personnel.
Zoning District Flood Zone BFE DFE
Approved zoning action?
Verified street address
If new, has it been reported to MPC, CRC, etc.?
New Existing
Number of egresses?
Average adjacent grade feet
Drainage and Erosion Control plans approved?
Approval Signature Date
Building Official
Water /Sewer
Public Works
Fire Chief
Planning & Zoning
S4rong 3 j plate
FEES
Permit
Inspections
Water Tap
CC Recovery
Sewer Stub
Aid to Construction
Engineering
Ala qrAo r 9,1P4,
Plan deposit refund
TOTAL Z SD
LJ begun
J
ve- ct;a 2,5-b Qi e os;
f)Na`'
The following deficiencies are the most common on the projects in the City of Tybee Island. While the
deficiencies are not necessarily the fault of the owner or his agent, they are their responsibilities. The two most
common areas of deficiencies are for the two most basic BMPs on projects:
Co — Construction Exit
Sd1 — Sediment Barrier
Correct installation information can be found in the Green Book and in the Field Manual for Erosion and
Sediment Control in Georgia, which is available at: http://www.qaswcc.orq/docs/field manual 4ed.pdf. The
Georgia Soil and Water Conservation Commission is located at 4310 Lexington Road, P.O. Box 8024, Athens,
Georgia, 30603. The telephone number is 706.542.3065. Their website is: http: / /gaswcc.georgia.qov /. Also
see pages 9 through 12 of this packet.
Attention to the Construction Exit is not limited to the installation, but must also include the material.
Specifically, job site personnel are not checking to ensure the stone delivered is the 1.5 -inch to 3.5 -inch stone
they requested. Gradations that are obviously smaller will not be tolerated. The smaller stone allows for a
smoother surface with smaller voids, thereby reducing the function of the Construction Exit.
Type A sediment barriers are not allowed where Type C is required as shown on the approved permit
drawings. Where two rows are called for they will be installed with a separation that allows for the first one to
fail (fall over) without impacting the second one. The complete assembly and installation must be compliant:
steel or wood posts, post spacing, Type C or A, etc.
Past violations have resulted in:
1) Sediment discharge from the site which causes unsightliness, inconvenience to others, unnecessary
cleanup, and Violation Notices.
2) Increased maintenance efforts by the Department of Public Works on downstream lines.
3) Due to item 2, higher costs to island taxpayers.
While these deficiencies are not the only ones, they are the most common. Heeding the above cautions
should result in fewer infractions.
Downer Davis
City of Tybee Island Consulting Engineer
SIGNATURE OF ACKNOWLEDGEMENT
Signature of contractor:
Printed name: Walter Strong
3
February 2013
Date: 7 /,j
CITY OF TYBEE ISLAND
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone 912.472.5030 • Fax 912.786.9539
Water Tap and Sewer Stub Application
Street address of project Lot 16, Ninth Terrace, Tybee Island, GA 31328
Plumbing company Jenkins Plumbing Company
Plumbing contact person & phone numbers Joe 912- 330 -0761 912 - 210 -7750
office cell
Name of property owner(s) Jim Stoeffler
Phone numbers of property owner(s)
office cell
Details of project Single family, new construction
Residential X Commercial
Enter the required number of water taps /meters and sewer stubs:
WATER TAP /METER SEWER STUB
Number Meter Number Stub
of Taps Size of Stubs Size
1 3/4" 1 4"
1" 6"
1 -1/2" 8"
2"
Unauthorized use of water prior to installation of a water meter is prohibited.
Installation of lines and meters are the responsibility of the owner /contractor. Contact the Water /Sewer Department at
912.472.5051 for line and tie -in locations and for inspections.
Contact the Planning & Zoning Department at 912.472.5030 to arrange for water meter pick up.
It is the responsibility of the owner to establish a water /sewer account with the City. An application and deposit are
required. Contact 912.472.5025.
Signature of own//e //
Printed name: Ctile' f%c
Signature of contractor:
Printed name: Walter Strong
4
Date: —.7/12-'(//3
Date: 7/
A SEPARATE PERMIT IS REQUIRED FOR INFRASTRUCTURE ALTERATIONS
Any alteration to City owned streets, curbs, sidewalks, waterlines, sewer lines, drainage pipes, catch basins, or
other elements of the City's infrastructure, requires a separate permit from the City, and an acknowledgement
by the individual seeking to accomplish the alteration, that:
a. The City's infrastructure will not be degraded in any way.
b. All necessary safety precautions will be undertaken.
c. The City will inspect the work in process and upon completion.
d. The work will be accomplished to the City's satisfaction.
e. The City shall be held harmless of any liability or damages of any variety.
f. The individual has read applicable portion of the City's Code of Ordinance dealing with the alteration,
and agrees to fully comply with such provisions.
Will the proposed project at Lot 16, Ninth Terrace, Tybee Island GA 1328 require an infrastructure alteration permit?
street address of project
[1] Yes No
Description of alteration:
A site plan must be provided illustrating the planned alteration.
City Design Standards and Specifications: Any alteration to the City's infrastructure shall be accomplished
in such a fashion so as to restore the infrastructure to essentially the same condition that existed prior to the
alteration, or to an improved condition, as determined by the City.
Certification: I hereby acknowledge the above requirements, and certify that I will obtain a separate permit
prior to performing any alteration in accordanc ith these provisions.
Signature of contractor: ..e�"""` Date: y/1
Printed name: Walter Strong
5
CITY OF TYBEE ISLAND
Temporary Electrical Service Affidavit
Street address of project: Lot 16, Ninth Terrace, Tybee Island, GA 31328
This notice is to confirm the understanding of the owner and contractor of the compliance requirement of the Georgia
State Minimum Construction Codes.
It is understood and agreed by the undersigned that the requested temporary electrical power is intended for the
completion of the construction process and the testing of equipment installed within the structure.
It is understood and agreed by the undersigned that the issuance of temporary power DOES NOT constitute the approval
to occupy the structures. A Certificate of Occupancy must be issued by the City of Tybee Island prior to the structure
being furnished and /or occupied.
The owner and contractor are hereby held responsible for any violations to this policy. A violation of this policy may result
in discontinuance of the electrical service.
Temporary electrical service will be granted as an aid to complete construction only. It may be revoked as
circumstances dictate.
ALL electrical wiring, service included,
must be COPPER. NO aluminum allowed.
Section 9- 050(B)
Means shall be provided to disconnect all
conductors from the service- entrance conductors.
NEC 230.70
State Energy Code Affidavit
I hereby declare that the design and construction of the above referenced project is in compliance with the Georgia State
Energy Code for Buildings, 2009 Edition, with Georgia Amendments.
A Georgia Energy Code Compliance Certificate will be required at project completion.
It is understood and agreed by the undersigned owner and contractor (if applicable) that the approval of the permit does
not constitute a privilege to violate the Code and that any omission of or misrepresentation of fact, with or without
intention, of the permit issued which was based on the approval of this application. The owner will be held responsible for
insuring that all permits have been obtained and that all required inspections have been made. The owner will be held
legally liable for any violations which may occur with or without his knowledge. The owner shall be allowed to request a
Certificate of Occupancy when all inspections (building and site) have been approved.
SIGNATURES for Temporary Electrical Service and State Energy Code AFFIDAVITS
Signature of owner: l /
Printed name: if
Signature of contractor:
Printed name: Walter strong
6
Date:
-7 Z2 /4
Date: 74.3
Subcontractor List
Street address of project: Lot 16, Ninth Tcrracc, Tybce Island, GA 31328
Provide the company name, business type, address, contact person, and phone numbers of all
subcontractors. The City of Tybee Island requires annual Contractor Registration for all contractors.
1. Company Jenkins Plumbing Company
Address 86 Columbia Drive, Pooler GA 31322
Contact person Joe
2. Company M.L. Sloan Electric Company, Inc.
Business type Plumber
Cell number 912- 210 -7750
Office number 912- 330 -0761
Business type Electric
Address 2900 D. Captain Street, Savannah, GA 31404 Cell number 912 - 313 -5485
Contact person Mike Sloan
3. Company Gerralds Heating and Air
Address P.O. Box 459, Richmond Hill, GA 31324
Office number 912- 352 -0110
Business type Mechinacal
Cell number 912- 756 -3422
Contact person Office number 912- 313 -9348
4. Company Business type
Address Cell number
Contact person Office number
5. Company Business type
Address Cell number
Contact person Office number
6. Company Business type
Address CeII number
Contact person Office number
Attach additional sheets if needed.
RESchec r Software Version 4.4.1
Compliance Certificate
Project Title: New Beach Cottage 1
Energy Code:
Location:
Construction Type:
Glazing Area Percentage:
Heating Degree Days:
Climate Zone:
Construction Site:
Lot 16, Ninth Terrace
Tybee Island, GA 31328
2009 IECC
Tybee Island, Georgia
Single Family
16%
1851
2
Owner /Agent:
Greg Stoeffler
Tybee Island, GA 31328
Designer /Contractor:
Walter Strong
Contractor
Compliance: Passes usin • UA trade -off
Compliance: 18.4% Better Than Code Maximum UA: 773 Your UA: 631
The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade -off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Maximum SHGC: 0.30 Your SHGC: 0.30
Assembly
Gross Cavity
Area or R -Value
Perimeter
Cont. Glazing UA
R -Value or Door
U- Factor
Floor 1: Slab -On- Grade:Heated
Insulation depth: 0.0'
Floor 2: All -Wood Joist/Truss:Over Outside Air
Front: Wood Frame, 16" o.c.
Window 1: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Door 1: Glass
SHGC: 0.27
Right Side: Wood Frame, 16" o.c.
Window 2: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Rear: Wood Frame, 16" o.c.
Window 3: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Door 2: Glass
SHGC: 0.27
Left Side: Wood Frame, 16" o.c.
Window 4: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Ceiling 1: Cathedral Ceiling (no attic)
229
0.0
239
1309 19.0 0.0 62
630 13.0 0.0 39
60 0.400 24
100 0.350 35
528 13.0 0.0 38
60 0.400 24
630 13.0 0.0 40
86 0.400 34
60 0.350 21
528 13.0 0.0 42
10 0.400 4
1309 49.0 0.0 29
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name - Title
Signature
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 16 -9th Terrace.rck
Date
Report date: 07/23/13
Page 1 of 4
REScheck So-ware''erseon 4.4.1
Inspection Checklist
Ceilings:
❑ Ceiling 1: Cathedral Ceiling (no attic), R -49.0 cavity insulation
Comments.
Above -Grade Walls:
❑ Front: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
❑ Right Side: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
❑ Rear: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
❑ Left Side: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
Windows:
❑ Window 1: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 2: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 3: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 4: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
Doors:
❑ Door 1: Glass, U- factor: 0.350
Comments.
❑ Door 2: Glass, U- factor: 0.350
Comments.
Floors:
❑ Floor 1: Slab -On- Grade:Heated, R -0 (uninsulated)
Comments.
❑ Floor 2: All -Wood Joist/Truss:Over Outside Air, R -19.0 cavity insulation
Comments -
Floor insulation is installed in permanent contact with the underside of the subfloor decking.
Solar Heat Gain Coefficient:
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 16 -9th Terrace.rck
Report date: 07/23/13
Page 2 of 4
CI
The area - weighted average Solar Gain Coefficient (SHGC) of all glazing cannot excee
accordance with the NFRC test procedure or taken from the default table.
SHGC values are determined in
Air Leakage:
❑ Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are
sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or
solid material.
❑ Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between
window /doorjambs and framing.
❑ Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk
between the housing and the interior wall or ceiling covering.
❑ Access doors separating conditioned from unconditioned space are weather- stripped and insulated (without insulation compression or
damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed
to maintain insulation application.
❑ Wood- burning fireplaces have gasketed doors and outdoor combustion air.
Air Sealing and Insulation:
❑ Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7
ACH at 33.5 psf OR 2) the following items have been satisfied:
(a) Air barriers and thermal barrier: Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or
repaired.
(b) Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed.
(c) Above -grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier,
(d) Floors: Air barrier is installed at any exposed edge of insulation.
(e) Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or
sprayed /blown insulation extends behind piping and wiring.
(f) Corners, headers, narrow framing cavities, and rim joists are insulated.
(9) Shower /tub on exterior wall: Insulation exists between showers /tubs and exterior wall.
Materials Identification and Installation:
❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions.
❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R- value.
❑ Materials and equipment are identified so that compliance can be determined.
❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
❑ Insulation R- values and glazing U- factors are clearly marked on the building plans or specifications.
Duct Insulation:
❑ Supply ducts in attics are insulated to a minimum of R -8. All other ducts in unconditioned spaces or outside the building envelope are
insulated to at least R -6.
Duct Construction and Testing:
❑ Building framing cavities are not used as supply ducts.
❑ All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means
of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or
UL 181B and are labeled according to the duct construction. Metal duct connections with equipment and /or fittings are mechanically
fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three
equally spaced sheet -metal screws.
Exceptions:
Joint and seams covered with spray polyurethane foam.
Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the
joint so as to prevent a hinge effect.
Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa).
❑ Duct tightness test has been performed and meets one of the following test criteria:
(1) Postconstruction leakage to outdoors test: Less than or equal to 148.2 cfm (8 cfm per 100 ft2 of conditioned floor area).
(2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 222.4 cfm (12 cfm per 100 ft2 of
conditioned floor area) pressure differential of 0.1 inches w.g.
(3) Rough -in total leakage test with air handler installed: Less than or equal to 111.2 cfm (6 cfm per 100 ft2 of conditioned floor area)
when tested at a pressure differential of 0.1 inches w.g.
(4) Rough -in total leakage test without air handler installed: Less than or equal to 74.1 cfm (4 cfm per 100 ft2 of conditioned floor area).
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 16 -9th Terrace.rck
Report date: 07/23/13
Page 3 of 4
Heating and Cooling Equipmer zing:
❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code.
❑ For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial
Building Mechanical and /or Service Water Heating (Sections 503 and 504).
Circulating Service Hot Water Systems:
❑ Circulating service hot water pipes are insulated to R -2.
❑ Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the
system is not in use.
Heating and Cooling Piping Insulation:
HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R -3.
Swimming Pools:
❑ Heated swimming pools have an on /off heater switch.
❑ Pool heaters operating on natural gas or LPG have an electronic pilot light.
❑ Timer switches on pool heaters and pumps are present.
Exceptions:
Where public health standards require continuous pump operation.
Where pumps operate within solar- and /or waste - heat - recovery systems.
❑ Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a
minimum insulation value of R -12.
Exceptions:
Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source.
Lighting Requirements:
❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following:
(a) Compact fluorescent
(b) T -8 or smaller diameter linear fluorescent
(c) 40 lumens per watt for lamp wattage <= 15
(d) 50 lumens per watt for lamp wattage > 15 and <= 40
(e) 60 lumens per watt for lamp wattage > 40
Other Requirements:
❑ Snow- and ice - melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting
off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is
above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'c').
Certificate:
❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window
U- factors; type and efficiency of space- conditioning and water heating equipment. The certificate does not cover or obstruct the visibility
of the circuit directory label, service disconnect label or other required labels.
NOTES TO FIELD: (Building Department Use Only)
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 16 -9th Terrace.rck
Report date: 07/23/13
Page 4 of 4
le 2009 IECC ..nergy
Efficiency Certificate
Insulation Rating
R -Value
Ceiling / Roof
Wall
Floor / Foundation
Ductwork (unconditioned spaces):
49.00
13.00
19.00
Glass & Door Rating
U- Factor SHGC
Window
Door
0.40
0.35
0.32
0.27
Heating & Cooling Equipment
Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date.
Comments:
RECEIVED
CITY OF TYBEE ISLAND
Application for a New Construction Permit
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone 912.472.5030 • Fax 912.786.9539
pages 1 — 7 of permit application
Required submittals: ✓2 sets building plans
f./ 1 copy REScheck or COMcheck
1 copy certified survey showing existing ground elevations, flood zone(s), and trees
3 sets certified hydrology, drainage and erosion control plans
N7 $250 plan deposit (will be forfeited if project is abandoned) check # Y //
q
Street address(Lot 1 )Ni � Terrace, Tybee Island, GA, 31328
NAME
MAILING ADDRESS
PIN # 4- 006- 05 -006B
P
Owner
6(e ..
Jim gtoeffler
PO'0> l358 ! � 'c , S L.
Home: ci /2 "--)96 061t1 7
ell: q 7 5-4) ,c700
Architect
or Engineer
Sanders, Trowell & Associates
22 West Bryan Street 3 I.1 2e
#155
Savannah. GA 31401
Office:
Cell: 323 -1220
Contractor
W. H. Strong Company
22 W. Liberty Street, Savannah GA 31401
Office:912- 233 -7690
Cell: 912 - 272 -0201
Check all that apply: ® New Construction
❑ Other
Details of project:
❑ Commercial
Single Family, New Construction
® Residential
® Single Family
• Duplex
❑ Multi - Family units
69—Piat)- 77g
i
Estimated cost of construction: $ 300,000 A copy of the contract maybe requested.
Construction type: 1 (select appropriate number below)
1. wood frame 3. brick veneer 5. steel & masonry
2. wood & masonry 4. masonry 6. other:
Lot area 4,192.8 sq. ft. # buildings 1 # units 1
# floors 2 # bedrooms 2 # bathrooms 3
# of egresses 1, An elevator is not an accepted means of egress.
Height 35' Vertical distance is measured from the average adjacent grade of the lot to the extreme high point of
the building (roof ridge, handrail, etc.), exclusive of chimneys, HVAC units, elevators, and similar appurtenances.
Total heated /cooled square footage 1,853 Flood Zone AE (AE or VE)
Base Flood Elevation 12 Design Flood Elevation (BFE + 1 -foot)
As -built setbacks: Front 12' 1 9/16"
Total driveway(s) width
Rear 10'
Sides (L) 10' 2 7/8" (R) 10' 4 9/16 /"
feet # of openings Culvert? Swale?
Number of off - street parking spaces
Number of trees to be removed Approximately 14
A separate tree removal permit is required.
1
2/28/2013
During construction on -site restrooms will be provided by A -OK
Construction debris will be disposed by Atlantic Waste by means of 30 yd container
Section 22 -169 — When active work ceases on the project for the day a SECURE COVER shall be placed over
the dumpster or container so as to prevent trash or construction debris from being blown out.
I understand that I must comply with zoning, erosion control, building, fire, shore protection, and wetland
ordinances, FEMA regulations, and all other applicable codes and regulations. I understand a foundation
survey and certification letter are required as soon as the foundation is in place to ensure that the setback
requirements will be met. I understand an Elevation Certificate — Building Under Construction is required
immediately after lowest floor or flood proofing is completed. I realize that an as -built survey, Elevation
Certificate — Finished Construction, Breakaway Wall Certification, Recorded Nonconversion Agreement,
Energy Code Compliance Certificate, tree mitigation, height certification, drainage certification, and site
acceptance by the City will be required. I accept financial responsibility for any expenses the city incurs for
third -party engineering services related to this project.
I agree to construct/place all equipment such as air conditioning compressors, ducts, water heaters, furnaces,
electrical outlets, etc., at or above the required Design Flood Elevation (Base Flood Elevation + 1- foot).
Projects must demonstrate they are in compliance with the City of Tybee Island Stormwater Management
requirements as outlined in Article 16 of the Land Development Code. As part of the approval process,
applicants must illustrate how these requirements will be met, including how stormwater naturally flowed on the
property prior to any development activity, and what changes in stormwater flow will occur.
A .ermit normall re.uires 7 to 10 busin: s days to process.
Signature of applicant:
Printed name: Walter Strong
Date:
7,T
The following will be completed by City of Tybee Island personnel.
Zoning District Flood Zone BFE DFE
Approved zoning action?
Verified street address
If new, has it been reported to MPC, CRC, etc.?
New Existing
Number of egresses?
Average adjacent grade feet
Drainage and Erosion Control plans approved?
Approval Signature Date
Building Official
Water /Sewer
Public Works
Fire Chief
Planning & Zoning
3`o 3 aba�d4 000, rev; <<.� Iua 2 begs �r-‘ `
�a y j! ro ,,,\
FEES
Permit
Inspections
Water Tap
CC Recovery
Sewer Stub "
Aid to Construction
En ineering
abard ) rood- Zso
Plan deposit refund
TOTAL Z SD
r 250 defgs; -1'.
The following deficiencies are the most common on the projects in the City of Tybee Island. While the
deficiencies are not necessarily the fault of the owner or his agent, they are their responsibilities. The two most
common areas of deficiencies are for the two most basic BMPs on projects:
Co — Construction Exit
Sd1 — Sediment Barrier
Correct installation information can be found in the Green Book and in the Field Manual for Erosion and
Sediment Control in Georgia, which is available at: http: / /www.gaswcc.orq /docs /field manual 4ed.pdf. The
Georgia Soil and Water Conservation Commission is located at 4310 Lexington Road, P.O. Box 8024, Athens,
Georgia, 30603. The telephone number is 706.542.3065. Their website is: http://qaswcc.qeorqia.qov/. Also
see pages 9 through 12 of this packet.
Attention to the Construction Exit is not limited to the installation, but must also include the material.
Specifically, job site personnel are not checking to ensure the stone delivered is the 1.5 -inch to 3.5 -inch stone
they requested. Gradations that are obviously smaller will not be tolerated. The smaller stone allows for a
smoother surface with smaller voids, thereby reducing the function of the Construction Exit.
Type A sediment barriers are not allowed where Type C is required as shown on the approved permit
drawings. Where two rows are called for they will be installed with a separation that allows for the first one to
fail (fall over) without impacting the second one. The complete assembly and installation must be compliant:
steel or wood posts, post spacing, Type C or A, etc.
Past violations have resulted in:
1) Sediment discharge from the site which causes unsightliness, inconvenience to others, unnecessary
cleanup, and Violation Notices.
2) Increased maintenance efforts by the Department of Public Works on downstream lines.
3) Due to item 2, higher costs to island taxpayers.
While these deficiencies are not the only ones, they are the most common. Heeding the above cautions
should result in fewer infractions.
Downer Davis
City of Tybee Island Consulting Engineer
SIGNATURE OF ACKNOWLEDGEMENT
Signature of contractor:
Printed name: Walter Strong
3
February 2013
Date: 74:4
CITY OF TYBEE ISLAND
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone 912.472.5030 • Fax 912.786.9539
Water Tap and Sewer Stub Application
Street address of project Lot 17 Ninth Terrace, Tybee Island, GA, 31328
Plumbing company Jenkins Plumbing Company
Plumbing contact person & phone numbers
office cell
Name of property owner(s) Jim Stoeffler
Phone numbers of property owner(s)
office cell
Details of project Single family, new construction
Residential X Commercial
Enter the required number of water taps /meters and sewer stubs:
WATER TAP /METER SEWER STUB
Number Meter Number Stub
of Taps Size of Stubs Size
1
3/4" 1 4"
1" 6"
1 -1/2" 8"
2"
Unauthorized use of water prior to installation of a water meter is prohibited.
Installation of lines and meters are the responsibility of the owner /contractor. Contact the Water /Sewer Department at
912.472.5051 for line and tie -in locations and for inspections.
Contact the Planning & Zoning Department at 912.472.5030 to arrange for water meter pick up.
It is the responsibility of the owner to establish a water /sewer account with the City. An application and deposit are
required. Contact 912.472.5025.
Signature of owner:
Printed name: s� 5 -e
Signature of contractor:
Printed name: Walter Strong
4
Date: T7l2 /
Date:
A SEPARATE PERMIT IS REQUIRED FOR INFRASTRUCTURE ALTERATIONS
Any alteration to City owned streets, curbs, sidewalks, waterlines, sewer lines, drainage pipes, catch basins, or
other elements of the City's infrastructure, requires a separate permit from the City, and an acknowledgement
by the individual seeking to accomplish the alteration, that:
a. The City's infrastructure will not be degraded in any way.
b. All necessary safety precautions will be undertaken.
c. The City will inspect the work in process and upon completion.
d. The work will be accomplished to the City's satisfaction.
e. The City shall be held harmless of any liability or damages of any variety.
f. The individual has read applicable portion of the City's Code of Ordinance dealing with the alteration,
and agrees to fully comply with such provisions.
Will the proposed project at Lot 17 Ninth Terrace, Tybee Island, GA, 31328 require an infrastructure alteration permit?
street address of project
fI Yes No
Description of alteration:
A site plan must be provided illustrating the planned alteration.
City Design Standards and Specifications: Any alteration to the City's infrastructure shall be accomplished
in such a fashion so as to restore the infrastructure to essentially the same condition that existed prior to the
alteration, or to an improved condition, as determined by the City.
Certification: I hereby acknowledge the above requirements, and certify that I will obtain a separate permit
prior to performing any alteration in accord with these provisions.
Signature of contractor:
Printed name: Walter Strong
Date: Z
5
CITY OF TYBEE ISLAND
Temporary Electrical Service Affidavit
Street address of project: Lot 17 Ninth Terrace, Tybee Island, GA, 31328
This notice is to confirm the understanding of the owner and contractor of the compliance requirement of the Georgia
State Minimum Construction Codes.
It is understood and agreed by the undersigned that the requested temporary electrical power is intended for the
completion of the construction process and the testing of equipment installed within the structure.
It is understood and agreed by the undersigned that the issuance of temporary power DOES NOT constitute the approval
to occupy the structures. A Certificate of Occupancy must be issued by the City of Tybee Island prior to the structure
being furnished and /or occupied.
The owner and contractor are hereby held responsible for any violations to this policy. A violation of this policy may result
in discontinuance of the electrical service.
Temporary electrical service will be granted as an aid to complete construction only. It may be revoked as
circumstances dictate.
ALL electrical wiring, service included,
must be COPPER. NO aluminum allowed.
Section 9- 050(B)
Means shall be provided to disconnect all
conductors from the service - entrance conductors.
NEC 230.70
State Enerqy Code Affidavit
I hereby declare that the design and construction of the above referenced project is in compliance with the Georgia State
Energy Code for Buildings, 2009 Edition, with Georgia Amendments.
A Georgia Energy Code Compliance Certificate will be required at project completion.
It is understood and agreed by the undersigned owner and contractor (if applicable) that the approval of the permit does
not constitute a privilege to violate the Code and that any omission of or misrepresentation of fact, with or without
intention, of the permit issued which was based on the approval of this application. The owner will be held responsible for
insuring that all permits have been obtained and that all required inspections have been made. The owner will be held
legally liable for any violations which may occur with or without his knowledge. The owner shall be allowed to request a
Certificate of Occupancy when all inspections (building and site) have been approved.
SIGNATURES for Temporary Electrical Service and State Enerqy Code AFFIDAVITS
Date: -7/z //
Date: —71
Signature of owner: 6 SA,
Printed name: r
Signature of contractor:
Printed name: Walter Strong
6
Subcontractor List
Street address of project: Lot 17 Ninth Terrace, Tybee Island, GA, 31328
Provide the company name, business type, address, contact person, and phone numbers of all
subcontractors. The City of Tybee Island requires annual Contractor Registration for all contractors.
1. Company Jenkins Plumbing Company
Address 86 Columbia Drive, Pooler, GA 31322
Contact person
2. Company M.L. Sloan Electric Company, Inc.
Address 2900 D. Captain Street, Savannah GA 31404
Contact person Mike Sloan
3. Company Gerralds Heating and Air
Address P.O. Box 459, Richmond Hill, GA 31324
Contact person
4. Company
Address
Contact person
5. Company
Address
Contact person
6. Company
Address
Contact person
Business type Plumbing
Cell number
Office number 912 - 330 -0761
Business type Electrical
Cell number
Office number 912 - 352 -0110
Business type Mechanical
Cell number 912 - 313 -9348
Office number
Business type
Cell number
Office number
Business type
Cell number
Office number
Business type
Cell number
Office number
Attach additional sheets if needed.
7
,s(?`Scheca: Software Version 4.4,1
Compliance Certificate
Project Title: New Beach Cottage 1
Energy Code:
Location:
Construction Type:
Glazing Area Percentage:
Heating Degree Days:
Climate Zone:
Construction Site:
Lot 17, Ninth Terrace
Tybee Island, GA 31328
2009 IECC
Tybee Island, Georgia
Single Family
16%
1851
2
Owner /Agent:
Greg Stoeffler
Tybee Island, GA 31328
Designer /Contractor:
Walter Strong
Contractor
Compliance: Passes us n. UA trade-off
Compliance: 18.4% Better Than Code Maximum UA: 773 Your UA: 631 Maximum SHGC: 0.30 Your SHGC: 0.30
The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade -off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Assembly
Gross Cavity
Area or R -Value
Perimeter
Cont.
R- Value
Glazing UA
or Door
U- Factor
Floor 1: Slab -On- Grade:Heated
Insulation depth: 0.0'
Floor 2: All -Wood Joist/Truss:Over Outside Air
Front: Wood Frame, 16" o.c.
Window 1: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Door 1: Glass
SHGC: 0.27
Right Side: Wood Frame, 16" o.c.
Window 2: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Rear: Wood Frame, 16" o.c.
Window 3: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Door 2: Glass
SHGC: 0.27
Left Side: Wood Frame, 16" o.c.
Window 4: Vinyl Frame:Double Pane with Low -E
SHGC: 0.32
Ceiling 1: Cathedral Ceiling (no attic)
229
1309 19.0
630 13.0
60
100
528 13.0
60
630 13.0
86
60
528 13.0
10
1309 49.0
0.0 239
0.0 62
0.0 39
0.400 24
0.350 35
0.0 38
0.400 24
0.0 40
0.400 34
0.350 21
0.0 42
0.400 4
0.0 29
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name - Title
Signature
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 17 -9th Terrace.rck
Date
Report date: 07/23/13
Page 1 of 4
REScheck Software Version 4.4,1
Inspection Checklist
Ceilings:
❑ Ceiling 1: Cathedral Ceiling (no attic), R -49.0 cavity insulation
Comments.
Above -Grade Walls:
❑ Front: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
❑ Right Side: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
❑ Rear: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments-
CI Left Side: Wood Frame, 16" o.c., R -13.0 cavity insulation
Comments.
Windows:
❑ Window 1: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 2: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 3: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
❑ Window 4: Vinyl Frame:Double Pane with Low -E, U- factor: 0.400
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments.
Doors:
❑ Door 1: Glass, U- factor: 0.350
Comments:
❑ Door 2: Glass, U- factor: 0.350
Comments.
Floors:
❑ Floor 1: Slab -On- Grade:Heated, R -0 (uninsulated)
Comments:
❑ Floor 2: All -Wood Joist/Truss:Over Outside Air, R -19.0 cavity insulation
Comments.
Floor insulation is installed in permanent contact with the underside of the subfloor decking.
Solar Heat Gain Coefficient:
Project Title: New Beach Cottage 1
Data filename: Z: \Documents \S &T Arch \Drawings \2013 \1310 \Lot 17 -9th Terrace.rck
Report date: 07/23/13
Page 2 of 4
" T h e a r e a - w e i g h t e d a v e r a g e S o l a r i G a i n C o e f f i c i e n t ( S H G C ) o f a l l g l a z i n g c a n n o t e x c e e S H G C v a l u e s a r e d e t e r m i n e d i n
a c c o r d a n c e w i t h t h e N F R C t e s t p r o c e d u r e o r t a k e n f r o m t h e d e f a u l t t a b l e .
A i r L e a k a g e :
Q' J o i n t s ( i n c l u d i n g r i m j o i s t j u n c t i o n s ) , a t t i c a c c e s s o p e n i n g s , p e n e t r a t i o n s , a n d a l l o t h e r s u c h o p e n i n g s i n t h e b u i l d i n g e n v e l o p e t h a t a r e
s o u r c e s o f a i r l e a k a g e a r e s e a l e d w i t h c a u l k , g a s k e t e d , w e a t h e r s t r i p p e d o r o t h e r w i s e s e a l e d w i t h a n a i r b a r r i e r m a t e r i a l , s u i t a b l e f i l m o r
s o l i d m a t e r i a l .
" A i r b a r r i e r a n d s e a l i n g e x i s t s o n c o m m o n w a l l s b e t w e e n d w e l l i n g u n i t s , o n e x t e r i o r w a l l s b e h i n d t u b s / s h o w e r s , a n d i n o p e n i n g s b e t w e e n
w i n d o w / d o o r j a m b s a n d f r a m i n g .
�% R e c e s s e d l i g h t s i n t h e b u i l d i n g t h e r m a l e n v e l o p e a r e 1 ) t y p e I C r a t e d a n d A S T M E 2 8 3 l a b e l e d a n d 2 ) s e a l e d w i t h a g a s k e t o r c a u l k
b e t w e e n t h e h o u s i n g a n d t h e i n t e r i o r w a l l o r c e i l i n g c o v e r i n g .
" A c c e s s d o o r s s e p a r a t i n g c o n d i t i o n e d f r o m u n c o n d i t i o n e d s p a c e a r e w e a t h e r - s t r i p p e d a n d i n s u l a t e d ( w i t h o u t i n s u l a t i o n c o m p r e s s i o n o r
d a m a g e ) t o a t l e a s t t h e l e v e l o f i n s u l a t i o n o n t h e s u r r o u n d i n g s u r f a c e s . W h e r e l o o s e f i l l i n s u l a t i o n e x i s t s , a b a f f l e o r r e t a i n e r i s i n s t a l l e d
t o m a i n t a i n i n s u l a t i o n a p p l i c a t i o n .
L I W o o d - b u r n i n g f i r e p l a c e s h a v e g a s k e t e d d o o r s a n d o u t d o o r c o m b u s t i o n a i r .
A i r S e a l i n g a n d I n s u l a t i o n :
L i B u i l d i n g e n v e l o p e a i r t i g h t n e s s a n d i n s u l a t i o n i n s t a l l a t i o n c o m p l i e s b y e i t h e r 1 ) a p o s t r o u g h - i n b l o w e r d o o r t e s t r e s u l t o f l e s s t h a n 7
A C H a t 3 3 . 5 p s f O R 2 ) t h e f o l l o w i n g i t e m s h a v e b e e n s a t i s f i e d :
( a ) A i r b a r r i e r s a n d t h e r m a l b a r r i e r : I n s t a l l e d o n o u t s i d e o f a i r - p e r m e a b l e i n s u l a t i o n a n d b r e a k s o r j o i n t s i n t h e a i r b a r r i e r a r e f i l l e d o r
r e p a i r e d .
( b ) C e i l i n g / a t t i c : A i r b a r r i e r i n a n y d r o p p e d c e i l i n g / s o f f i t i s s u b s t a n t i a l l y a l i g n e d w i t h i n s u l a t i o n a n d a n y g a p s a r e s e a l e d .
( c ) A b o v e - g r a d e w a l l s : I n s u l a t i o n i s i n s t a l l e d i n s u b s t a n t i a l c o n t a c t a n d c o n t i n u o u s a l i g n m e n t w i t h t h e b u i l d i n g e n v e l o p e a i r b a r r i e r .
( d ) F l o o r s : A i r b a r r i e r i s i n s t a l l e d a t a n y e x p o s e d e d g e o f i n s u l a t i o n .
( e ) P l u m b i n g a n d w i r i n g : I n s u l a t i o n i s p l a c e d b e t w e e n o u t s i d e a n d p i p e s . B a t t i n s u l a t i o n i s c u t t o f i t a r o u n d w i r i n g a n d p l u m b i n g , o r
s p r a y e d / b l o w n i n s u l a t i o n e x t e n d s b e h i n d p i p i n g a n d w i r i n g .
( f ) C o r n e r s , h e a d e r s , n a r r o w f r a m i n g c a v i t i e s , a n d r i m j o i s t s a r e i n s u l a t e d .
( g ) S h o w e r / t u b o n e x t e r i o r w a l l : I n s u l a t i o n e x i s t s b e t w e e n s h o w e r s / t u b s a n d e x t e r i o r w a l l .
M a t e r i a l s I d e n t i f i c a t i o n a n d I n s t a l l a t i o n :
" M a t e r i a l s a n d e q u i p m e n t a r e i n s t a l l e d i n a c c o r d a n c e w i t h t h e m a n u f a c t u r e r '