Loading...
HomeMy Public PortalAbout10-0396 Jaydeep, LLCCity of bee Island • Community Develc lent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Wok slawk alma INTERNATIONAL CODE COUNCIE MEMBER f Permit No. Date Requested Owner's Name J-)-- LLL, Date Needed Gen. Contractor Subcontractor Miqr-LiDA)rEs h7.) Contact Information 01117zc ‘ .),,N ).,7-7.-.. -756 - 3.534 Jo l'.-..,3 .:•/;22 -2.'.- ;161, Project Address i -31 Scope of Work . PI 11 ,.-3 Ls ----, -7, --_, ,, n, ,- , " 1 <=--iZ::O / 77:.' ' ' ' - - i / Inspector '1)9 Date of Inspection Inspection hJ ji F.:7> I- ) f\),Q ( - Pass ii E] Fee A751 fx,)20 a16, ( Inspection Pass Fail El Fee Inspection Pass El Fail Fee Inspection Pass Fail 0 Fee DATE ISSUED: 07 -30 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT MISC PLUMBING WORK 1315 BUTLER JAYDEEP LLC PO BOX 1439 TYBEE ISLAND GA 31328 912 - 786 -0006 MARK JONES PLUMBING SERVICE PO BOX 1809 RICHMOND HILL GA 31324 P $ 70.00 $5,000.00 PERMIT #: 100396 TOTAL BALANCE DUE: $ 70.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 666 From:CITY OF TYBEE ISLAN0 912 786 9539 071.,.f2010 08:02 #739 P.003(003 CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786 -4573 Fax (912) 786 -9539 PLUMBING PERMIT APPLICATION Date CEZ-? $" -riot) I�d�raT Location of work (street address) v3. t F�UT Contractor Address of Contractor - �,,ti, &c., _ 3 t 3z Telephone number of Contractor p1 l 1 - Cam- 3%'53`V Name of Property Owner i ,, s r eNdlce, / Mailing address of Property Owner 2t 1t Q t�.A.�iS:. "J 1C' 1,47 t-2 135- Telephone number of Property Owner ,D.3 -1 2-3. lF Date work will be ready for inspection, if known V[ ;AI ! ,PrLt_. t tee co W Estimated cost of construction 5 ©per New Work. Replaceanent Oil Gas Electric seuor>peN dZZ: LO 01. OE Inf £. d 899Z-992.-Z1.6 Backflow Preventor Disposal Unit Domestic Water Connection to Main Drain Roof or Area Drainage or Vent Piping Fire Protection Sprinkler System; Number of Heads/Nozzles Grease /Oil Trap / Hose Bib 1 Hot Water Heater lcemaker Lawn Sprinkler System r Plumbing Fixture Residential House Sewer Connection to Main Sewer Cleanout Sewer Stub Vacuum Breaker Water Meter -", ' Water Service Line - New Residence i Water Service Line- Replacement Water Softener Other Cpun1.4..i.,, 4:4-T.s1,,._ d''oc..e> we.. .5 .flly .1 seuor>peN dZZ: LO 01. OE Inf £. d 899Z-992.-Z1.6