HomeMy Public PortalAbout10-0402 WilsonPermit No.
City of bee Island • Community Develc 'ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
:o r
INTERNATIONAL
CODE COUNCIL"
MEMBER
t -„ Date Requested �.- ' 0
Owner's Name (A )E ).)k.) Date Needed �/ Z-- / _,)
Gen. Contractor Vii , A ---"rzI Subcontractor
Hg Contact Information \ is 0 i Git.)i LS() /3 L%r` C ') 7 I
Project Address I , —RA-544
Scope of Work . 1- r 67,--;,:.,
Inspector r1 i 61 Date of Inspection 1 1 / -
e Fk ,s
Inspection t2b �---/ i Pass F . '1 Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 08 -4 -2010
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL FENCE
18 PULASKI A & B
OWNER NAME JAMES WILSON
ADDRESS 18 PULASKI ST # B # A
CITY, ST, ZIP TYBEE ISLAND GA 31328 -9720
PHONE NUMBER
CONTRACTOR NAME TYBEE GIRL HELPERS
ADDRESS 1303 JONES AVE
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 55.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,000.00
PERMIT #: 100402
TOTAL BALANCE DUE: $ 55.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
I QODZ
Location: 1W-41/45KI
NAME
ADDRESS
+ —Ma t —0b3
PIN #
TELEPHONE
Owner
�Pt €� W 1
t,(i3 itL-(
`7
3t Z , 6 _15
Architect
or Engineer
/%
Building
Contractor
A l'lj ee
' vi
O
\ u
c� 5
l‘
i� tC
(p•�41 -o 7 i
-7 re j„ 4) Q
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
Substan ' .1 Addition
Other
• Details of Project:
i� `I
Z
Residential
Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
❑ Footprint Changes
❑ Discovery
❑ Demolition
kOtk
R,ijy -
v ,�
cirry oF�t&I�v
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
Estimated Cost of Construction:
on ruction Type
(1) sod Frame
(2) Wo d & Masonry
(3) Bric' Veneer
Proposed e:
Remarks:
ATTACH A
following i
# Units
Lot Ar ' a
# Off street parking s aces
Tre: located & listed • site plan
A ess:
L
1
seer
PY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
ation based on the construction drawings and site plan:
fo
D veway
etbacks: Front
(ft.)
# Bedrooms # Bathrooms
Living space (total sq. ft.)
With culvert? With swale?
Rear Sides (L) (R)
Stories Height Vertical distance measured from the average adjacent
grade of the building to the extre • e high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditi• ing units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through //1)21K-
On-site waste and debris containers will be rovided byc
Construction debris will be disposed KIM T 1. by me.ns of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
!_ 04
suRO-
CHATHAM SURVEYING SERVICES, INC,
P,❑, BOX 61649
SAVANNAH, GEORGIA 31420
912-303-0302
AS-BUILT SURVEY OF
THE EASTERN PORTIO\ OF
LOT 2, BLOCK 34
SCREVE\ WARD TYBEE ISLAND
5th GEORGIA MILITIA DISTRICT
KNOW\ AS 18 A AND 18 13 PULASKI ROAD
TYBEE ISLAND, CHATHAM COUNTY, GEORGIA
FOR
KIM13ERLEE WILSO\
10 05 0
SCALE 1" 5 10 FT
UPDATED JULY 24, 2007
10 20 TO SHOW NEW IMPROVEMENTS
DATE OF SURVEY
APRIL 21, 2005
DATE OF PLAT
MAY 20, 2005
34,92'
IPF
WHITE ROCK
S 78o46,41,DRIVEWAY
3' CONCRETE- -
RAIL FENCE
NORTHWESTERN PORTION
LOT 2
NOW OR FORMERLY
PAUL J. WEBER, III
9,80'
x
Y
0
r-
111iiiiiiii iENITI I1MIET 47!'!T_lIlffii01r,
liiiiiiiir11L S►2:si/XEMIMECILLOWINI ii�l�i�►
1 1 I 1 1 1 1( I I f
1 1 1 1 11111I11111[1i1l1t
11 1 1 1 1 1 1 1
1 11111If
f I 1 I { F_ 1 1 I I I I
1 I I 1 I I 1 I 4 1 1
IIIIIII I1{II 1
Air—NEW
PARTY
WALL
35,16'
v
5)
WESTERN PORTION
LOT 2
ONE STORY
BLOCK APARTMENTS
ELECTRIC METERS
POWER GOES
UNDERGROUND
10,15'
SOUTHWESTERN PORTION
LOT 2
NOW OR FORMERLY
PAUL J. WEBER, III
OHP
OHP
OFIP
OVERHEAD
POWER TEED
A/C
A/C
11 Il
OHP
W
OD
25,02'
SCREENED
PORCH
C- N
Z Z
Z
-i
H
IIn --I-I
< 0
MEW
AMU
I
MB
Cl MOW
WNW
III
MEMS
Man
r=
rim
III
Iii
MEM
lis
EMS
MEM
Z
I
i=�
fr
Lid
tit
OHP
OHP
RR XTIE
BORDER
14,80
IIII1I1 1 1 IIII
III �IIIIIIIIIII
I I I 1 1 1
OHP