Loading...
HomeMy Public PortalAboutFPL - Applicant Installed Fac. Agmt 08-16APPLICANT -INSTALLED FACILITIES AGREEMENT FOR UNDERGROUND CONVERSIONS (WR # 4618489) This Agreement, made and entered into this day of A Oq 20 1 6 by and between the TOWN OF GULF STREAM (the "Applicant"), a Florida municipal corporation with an address of 100 Sea Rd, Gulf Stream, FL 33483 and FLORIDA POWER & LIGHT COMPANY ("FPL"), a Florida corporation organized under the laws of the State of Florida, with an address of P.O. Box 14000, 700 Universe Boulevard, Juno Beach, FL 33408-0429. WITNESSETH: WHEREAS, the Applicant has executed the appropriate underground facilities conversion agreement ("Conversion Agreement") with FPL to convert certain overhead electric distribution facilities (collectively the "Existing Overhead Facilities") to underground distribution facilities (collectively the "Underground Facilities"), as described in the aforementioned Conversion Agreement (hereinafter the "Conversion"); WHEREAS, the Applicant desires to perform itself, or through its Contractors, certain Work as such term is described in Exhibit A associated with the Conversion; WHEREAS, FPL is willing, subject to all the terms and conditions set forth below in this Agreement, to allow the Applicant to perform the Work based on Applicant's assurance that such Work will be in accordance with FPL's designs, instructions, standards and specifications, and such Work will not adversely impact FPL or its electric- customers; NOW, THEREFORE, in recognition of the foregoing premises, and in consideration of the covenants and promises set forth herein below, FPL and Applicant do hereby agree as follows: 1. Compliance with Tariff. Applicant shall comply with and abide by the requirements, terms, and conditions of this Agreement, the Conversion Agreement, and FPL's electric tariff (the "Tariff,) 2. Conditions for Work to be Performed. Applicant shall, at its own cost and expense, perform or cause to be performed, all Work, as described in Exhibit A, in accordance with the terms and conditions of this Agreement and the standards and specifications shown in Exhibit B. The Applicant shall provide all survey and staking to ensure that all Underground Facilities are installed as shown in the Conversion Agreement and provide As -Built prints to FPL within two (2) weeks of installation, signed and certified by a Florida registered surveyor along with a FPL "Redline" document. 3. Commencement of Work Applicant shall perform the Work, or any portion of the Work, only upon receipt of a notice to proceed containing the approved drawings, specifications and instructions from FPL ("Notice to Proceed"). After receipt of the Notice to Proceed, Applicant shall provide written notice of intent to commence work to FPL at least five (5) Page 1 of 7 (Rev. 10!13/06) days prior to commencement of such Work. Applicant shall not perform any.excavation work without first notifying Sunshine State One Call for identification and marking of existing underground utilities and complying with the excavation requirements set forth in Florida Statute Chapter 556. 4. Materials. All Materials are to be supplied by FPL and shall be picked up by Applicant at the following address at a mutually agreed upon time, typically with 5 business days minimum notice, but no more than 15 business days notice, unless mutually agreed upon. Alternatively, FPL will, at Applicant's expense, have the material delivered to a mutually agreed upon location. Applicant assumes liability for any materials lost, stolen or damaged once these materials are picked up by, or delivered to, the Applicant. 5. Contractors. Applicant may enter into a contract with a contractor for the performance of the Work, or any portion thereof, provided that the contractor has been approved by FPL in writing prior to execution of such contract. Applicant shall not make any substitution of any contractor for the performance of Work unless the substitution is approved by FPL in writing. The Applicant's contractor(s) shall perform ALL work as outlined within Exhibit A & Exhibit B. No contract or purchase order between Applicant and its contractor(s) shall bind or purport to bind FPL, but each contractor entering into a contract with Applicant with respect to the Work shall name FPL as an intended third -party beneficiary and include a provision permitting its assignment to FPL upon FPL's written request, following default by Applicant or termination or expiration of this Agreement. Applicant shall provide FPL with written certification from each of its contractors performing Work that all warranties, guarantees and obligations of such contractors are equivalent or better than those granted by such contractor to FPL for similar work and shall require that each such contractor name FPL as an intended third party beneficiary of such warranties, guarantees and obligations with the same rights of enforcement as Applicant. Applicant shall assign all representations, warranties, guaranties, and obligations of all contractors at the request and direction of FPL, and without recourse to Applicant, to FPL upon default by Applicant or termination or expiration of this Agreement; provided, however, that, notwithstanding such assignment, Applicant shall be entitled to enforce each such representation, warranty, guaranty, and obligation so long as Applicant has any liability under this Agreement. Applicant hereby assigns to FPL, effective as of the termination or expiration of this Agreement, all representations, warranties, guaranties and obligations of all Contractors. 6. Right of Entry. FPL reserves the right, together with its agents or designees to enter the Jobsite as it may elect for the purpose of inspecting the Work, or constructing or installing such collateral work as it may desire, or testing, boring or surveying, or any other purpose. 7. Inspection and Correction of Deficiencies. 7.1. All Work shall be properly inspected and tested, if appropriate, by Applicant and shall at all times be subject to additional inspection by FPL and its designee(s). Page 2 of 7 (Rev. 10/23/06) L-17.0.7 SHEAR BOLT SECONDARY CONNECTORS IN L_ 17, 0.7 HANDHOLE FOR CONNECTING 2 TO 4 SERVICES NEUTRAL NEUTRAL 00 6� /gJ Sf'no 0/��5,°° 4 PORT SHEAR BOLT CONNECTOR (PIRANHA) CONNECTION DIAGRAM f FOR 1 — 2 SERVICE M&S III 549-378-009 M&S #163-066-008 NOTES: 1. FOR ONE SERVICE, SEE UC -5.0.0, UC -6.0.0 AND UC -6.02. 2 ONLY INSULATED CONDUCTORS MAY OE CONNECTED TO SHEAR BOLT CONNECTORS. 3. INSTALL TAG WrS #549-376-009 EVERYRME A CONNECTOR IS INSTALLED OR REPLACED. 4. FOR ADORIONAL INFORMATION REFER TO L-17.0.9, L-17.0.10 AND L-17.0.11. 5. FOR 24' AND 30' WINDHOLES INSTALL ALL CONDUITS AT ONE END OF THE HARDHOLE, BOM THE 24' AND 30' HMIDHOLES COME WITH A SPECIAL STENCIL "TO PLACE ALL CONDUITS AT THE END OF THE HANDHOLFS'. THIS ALLOWS THE CONDUCTOR TO BE UFTED OUT OF THE HANDHOLE AND WORK THE CONNECTORS ABOVE GROUND. B. WHEN FIELD CONDITIONS DICTATE THE USE OF FIVE OR MORE CONDUCTORS, R MAY BE BEST TO CONSIDER THE USE OF THE 3U' HANDHOLE, AS THIS WILL ALLOW ADDMoNAL ROOM TO WORK THE CONNECTIONS. 17 .1111111A . 5 PORT SHEAR BOLT CONNECTOR (PIRANHA) CONNECTION DIAGRAM FOR 3 — 4 SERVICE M&S #163-066-009 CE p PLUG G <Gc v Q�J 2"-45'(24" R) - 2" PVC PVC BEND SERVICE UG. SECONDARY 2"-45'( 2' PVC DUCT PVC 1 7AMI r HANDHOLE ELEVATION 2"-45'(24• R) PVC BEND 2" PVC SERVICE CAKES ` HANONOLE I/O SECONDARY, 1/0 SERVICE AND 12CU FOR STREET UGNT 4/0 SECONDARY, AND 1 OR 2 SERVICE 4/e SEWNDAIIY, AND 3 OR 4 SERVICE SEE NOTE 3 162-30hWi (154'X103•X18' DEW) 162-120-005 (24-XI3•%18' DEW) 162 -120 -DOB (24'%IS"X1B' DEEP) T50 MCM 1D 350 MCM U SEE NOTE 3 350 MCM M 500 YCY (NO MORE THAN 4 SETS) IM -066-011 (5 PORT) 162-100-007 (30'X17'XlB- DEW) 400 MCM 70 500 MCU (NO MORE THAN 4 SETS) 163-017-502 (6 PORE) 182-100-007 (30'%17'X18' DEEP) FUSE HOLDER, FUSE 163-017-502 IS POR() 162-121-004 (48•X30'X36' DEEP) 600 YCY lIl 750 YCY @ SEAL FOR STREET 1/4" HOLES S o 0 °.� ARR ELS o UG14T CKT. IF REO'D. �, 12 11/7/08 UPDATE DECAL (SEE H-3.0.0 ELS AEI. 11 AND H-7.0.1) UPDATE GRAINING & NOTE RJO ELS JJM 10 9 24 08 ADD NOTE 3 AR EIS UJM 9 9 6 07 w>trnBVE 2-1/2" + ELS JJM 4 PORT SHEAR BOLT CONNECTOR (PIRANHA) CONNECTION DIAGRAM f FOR 1 — 2 SERVICE M&S III 549-378-009 M&S #163-066-008 NOTES: 1. FOR ONE SERVICE, SEE UC -5.0.0, UC -6.0.0 AND UC -6.02. 2 ONLY INSULATED CONDUCTORS MAY OE CONNECTED TO SHEAR BOLT CONNECTORS. 3. INSTALL TAG WrS #549-376-009 EVERYRME A CONNECTOR IS INSTALLED OR REPLACED. 4. FOR ADORIONAL INFORMATION REFER TO L-17.0.9, L-17.0.10 AND L-17.0.11. 5. FOR 24' AND 30' WINDHOLES INSTALL ALL CONDUITS AT ONE END OF THE HARDHOLE, BOM THE 24' AND 30' HMIDHOLES COME WITH A SPECIAL STENCIL "TO PLACE ALL CONDUITS AT THE END OF THE HANDHOLFS'. THIS ALLOWS THE CONDUCTOR TO BE UFTED OUT OF THE HANDHOLE AND WORK THE CONNECTORS ABOVE GROUND. B. WHEN FIELD CONDITIONS DICTATE THE USE OF FIVE OR MORE CONDUCTORS, R MAY BE BEST TO CONSIDER THE USE OF THE 3U' HANDHOLE, AS THIS WILL ALLOW ADDMoNAL ROOM TO WORK THE CONNECTIONS. 17 .1111111A . 5 PORT SHEAR BOLT CONNECTOR (PIRANHA) CONNECTION DIAGRAM FOR 3 — 4 SERVICE M&S #163-066-009 CE p PLUG G <Gc v Q�J 2"-45'(24" R) - 2" PVC PVC BEND SERVICE UG. SECONDARY 2"-45'( 2' PVC DUCT PVC 1 7AMI r HANDHOLE ELEVATION 2"-45'(24• R) PVC BEND 2" PVC SERVICE CAKES ICONNECIDR5 HANONOLE I/O SECONDARY, 1/0 SERVICE AND 12CU FOR STREET UGNT 4/0 SECONDARY, AND 1 OR 2 SERVICE 4/e SEWNDAIIY, AND 3 OR 4 SERVICE 163 -066 -OW (4 PORT) 163-066-008 (4 PORI) 163-086-009 (5 PORT) 162-30hWi (154'X103•X18' DEW) 162-120-005 (24-XI3•%18' DEW) 162 -120 -DOB (24'%IS"X1B' DEEP) T50 MCM 1D 350 MCM 163-086-010 (5 PORT) 162-100- (30•X17•XIB• DEW) 350 MCM M 500 YCY (NO MORE THAN 4 SETS) IM -066-011 (5 PORT) 162-100-007 (30'X17'XlB- DEW) 400 MCM 70 500 MCU (NO MORE THAN 4 SETS) 163-017-502 (6 PORE) 182-100-007 (30'%17'X18' DEEP) 400 MCM TO SW MCM (NO YORE THAN 5 SM) 163-017-502 IS POR() 162-121-004 (48•X30'X36' DEEP) 600 YCY lIl 750 YCY 163-0f7-502 U5 PWTD 182-121-004 (48')(30•KTB• DEW) FOR DRIVEWAY LOADING USE HANDHOLE 162-122-1392 (50"X32"X36" DEEP) 6 423 14UPDATE DRAWING ANnunRDH 1 28 10 ppA DRAWIN AND ARR X 14 11/3/09 ADDED NEW 5 PORT PIRANHA FOR ARR ELS JRD 13 6/15/09 UPDATE DRAWING AND NOTES ARR ELS AEL 12 11/7/08 UPDATE DECAL GAP ELS AEI. 11 10 5 D6 UPDATE GRAINING & NOTE RJO ELS JJM 10 9 24 08 ADD NOTE 3 AR EIS UJM 9 9 6 07 UPDATE NOTE 1 AR ELS JJM 8 8/27/07 REMOVE EXAMPLE OF CUTTING FLOOD SEAL RJO ELS JJM 7 8/16/05 UPDATE NOTES SMS ELS JJM 6 2/24/05 UPDATE DRAWING AND NOTES REO ELS JJM 5 11/18/03 UPDATE NOTES RJO EIS JJM 4 6 18 03 UPDATE DRAWING NOTES & TaM SMS ELS JJM 3 8/06/01 UPDATE DRAWING NOTES & TDM SMS JES JJM 2 9/07/99 UPDATE DRAWING HARTS & SMS JES JJM 1 8/09/96 ADDED MULTTTAP CONNECTOR NUMBER. ADDED DRIVEWAY LOADING M&S NUMBER. CHANGED NULTITAP AND ADDED NOTE BB AWB JJM 0 630 93 ORIGINAL DRAWING I SMS I RAS JJM �1^ ^"Tc RPNcION I ORIG InRAWN APPR OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: SMS DRAWN BY: RAS )ATE: 8/09/913 APPROVED: J.R. 'PEPE'OIAZ NO SCALE RELIABILITY ENGINEERING MANAGER I UN -18.0.0 I FEEDER SPLICE BOX I UN -18.0.0 FO EEE NATURAL ALTERNATE METHOD v OF CONSTRUCTIOON , 3 STEP RACK IV1FH 8" AND 2-4" INSULATORS FOR ALTERNATE 6" ID PVC END BELLS PULL—IN—IRONS 4 PER BOX STEP TYPE I GROUNDING INSTALL COPPERWELO GROUND ROD SEE G-17.0.0 FOR GROUNDING SPLICES, TYPICAL WALL SECTION F ----------I --- ----------J o o l r B, I I END VIEW SIDE VIEW TOP VIEW TYPICAL FEEDER SPLICE BOX M&S NUMBER DESCRIPTION 162-240-003 CONCRETE FEEDER SPLICE BOX do UDS. 162-241-000 CONCRETE FEEDER SPLICE BOX & LIDS COMES WITH SPECIAL BRUSHED SIDEWALK FINISH LIDS AND FLUSH INSERTS SUITABLE FOR PEDESTRIAN TRAFFIC. 162-242-203 POLYMER CONCRETE FEEDER SPLICE BOX. TO BE INSTALLED ONLY IN NON ACCESSIBLE AREAS, NOT TO BE SUBJECTED TO ANY VEHICULAR TRAFFIC SUCH AS STREETS, PARKING. LOTS OR DRIVEWAYS. NOTES 1. LEAVE SUFFICIENT EXPOSED GROUND ROD TO INSTALL 6 EACH t4/0 -j2 CONNECTORS MAS 1120-118-005. 2. GROUND ALL SPLICES PER DISTRIBUDON STANDARD G-17.0.0. 3. GROUND CABLE PACKS. 4. EACH SPLICE BOX IS SUPPLIED WITH 2-1" OR HOLE FOR ALTERNATE GROUND ROD LOCATION. 14WE ALL GROUNDING CONNECTIONS M51DE THE 00X. RUN SUFFICIENT AMOUNT OF 4/0 TO ME CONNECTION TO ALT. GROUND ROD LOCATION. RESEAL 1" OA HOLE MOTH AOUASEAL 5. OISMDUDON SPUCE BOX AND UDS ARE DESIGNED FOR H-20 VEHICLE LOADING. (FULL TRAFFIC LOADING) G. WEIGHT OF SPLICE BOX (W/0 LIDS) -6700 LBS. DIMENSIONS ARE IV X S' X 41' DEEP 7. WOW OF EACH UD=11GO LBS. TWO UOS REQUIRED. N & S A FDR ND ONLY 162-240-011. e. ORO FEEDER CABLE SPLICES DUST BE BUNGED TO DAN GROUNDS. 9. REFFR TO UE -16.1.1 & UE -18.1.2 FOR SPLICE ASSEMBLY. A WATER TIGHT SEAL MUST BE NAGE WHERE INSULATED 10. CONDUCTORS CONNECT TO SYSTEM NEUTRAL SEE 0-17.0.0 ll. THE MAXIMUM PERMISSIBLE IOPEDENCE TO SYSTEM NEUTRAL FOR A DRIVER GROUND IS 25 ONUS. 12. AS SHOWN ABOVE, THE PVC MAY ENTER UNDERNEATH THE SPLICE BOX BY USING A 45 DEGREE SWEEP. SEAL CONDUIT WITH DUCT SEAL 13, NI AREAS SUBIECT TO WATER INTRUSION. INSTALL A SUFFICIENT AUDUNT OF PJJMCK'1/4"-3/4" SNE ROCK TO ALLOW FOR THE PERCOLATION OF THE WATER 14. IF REOER SPLICE BOX IS TO BE INSTALLED M A SIDEWALX. A SEPERATION WILL BE NEEDED BETWEEN THE CONCRETE AND THE UDS. 2� 15. RUM TO UX -233.0.1 OH & UG DISTRIBUTION SYSTEM STANDARDS DATE CRIG04ATOR: RAP _ DRAWN BY: J. SHOUP 7/99 APPROVED: J. McEVOY NO SCALE SUPERVISOR, OH/UC PRODUCT SUPPORT SERVICES J-4.0.0 PAD -MOUNTED CAPACITOR BANK INSTALLATIONS J-4.0.0 WE HAVE TWO STANDARD 1200 KVAR PAD—MOUNTED, CAPACITOR BANKS. THEY ARE PRESENTLY OPERATED AS FIXED BANKS, BUT MAY BE REMOTELY SWITCHED IN THE FUTURE. 223-388-508 13KV PAD—MOUNTED, DEADFRONT, STAINLESS STEEL ENCLOSURE, 3 PHASE, 1200 KVAR CAPACITOR BANK TO INCLUDE: A POTENTIAL TRANSFORMER, VACCUMM SWITCHES, DOUBLE BUSHING CAPACITOR CANS, (7.62KV, 400 KVAR), X—LIMITER FUSES (BOA), BUSHING WELLS (200A), PARKING STANDS, METER SOCKET AND CONTROL WIRING FOR RADIO RECEIVER. 223-388-001 23KV. PAD—MOUNTED, DEADFRONT, STAINLESS STEEL ENCLOSURE, 3 PHASE, 1200 KVAR CAPACITOR BANK TO INCLUDE: A POTENTIAL TRANSFORMER, VACUUM SWITCHES, DOUBLE BUSHING CAPACITOR CANS, (13.2 KVAR), 400 KVAR), X—LIMITER FUSES (50A), BUSHING WELLS (200A), PARKING STANDS, METER SOCKET AND CONTROL WIRING FOR RADIO RECEIVER, EITHER UNIT CAN MOUNT ON FOUNDATION UX -108 (M&S 162-251-005). THE FOUNDATION, ARRESTERS, AND ROTATABLE BUSHINGS ARE INCLUDED IN THE FOLLOWING MECA UNIT. EITHER UNIT CAN BE USED IN SALT—SPRAY AREAS. A B C D E F G H c 1200 T E 1. THE UNITS ARE TO BE INSTALLED NO MORE THAN 10OFT FROM A DEAD—FRONT, PADMOUNTED SWITCH CABINET, ONLY. LIVE FRONT CABINETS SHOULD BE CHANGED OUT FOR THIS APPLICATION. 2. THE UNIT WILL BE SERVED WITH 1/0, 25KV CABLE FROM THE BACK (200—AMP INTERFACE) OF THE ARRESTERS PRESENTLY FOUND IN THE CABINET, BUT THESE ARRESTERS MAY BE RE—USED IN THE CAP BANK UNIT. 3. INSTALL ROTATABLE, FEED—THRU BUSHINGS ON THE 23KV URD CAPACITOR BANK (ONE SIDE FOR THE ARRESTER ELBOW AND ONE SIDE FOR THE PRIMARY ELBOW COMING FROM THE PADMOUNTED SWITCH CABINET). NOTE: THIS ONLY APPLIES TO 23KV UNITS, SINCE IT IS TYPICALLY, NOT NECESSARY, TO PROTECT 15KV URD SYSTEMS, WITH ELBOW ARRESTERS. 4. THE PAD—MOUNTED BANK SITS ON A PRE—CAST CONCRETE PAD. REFER TO UX -108. 5. THE BANK IS PROTECTED, BY CURRENT—LIMITING FUSES, AND HAS A POTENTIAL TRANSFORMER (INTERNALLY PROTECTED AND HOOKED UP TO THE LINE SIDE OF FUSES), WHICH POWERS THE VACUUM SWITCHES. 6. FAULT INDICATORS SHOULD BE INSTALLED AT BOTH THE PADMOUNTED SWITCH CABINET AND THE CAPACITOR CABINET TO DISTINGUISH BETWEEN CAN OR CABLE FAILURE. 7. INSTALL SIGNS SHOWING "INSTRUCTIONS FOR SWITCHING" (M&S 548-223-000) AND "REPLACEMENT COMPONENTS" (M&S 548-223-100) ON INSIDE OF CABINET DOOR. NOTES - 1. PADMOUNTED CAPACITOR BANKS REQUIRE 8' MINIMUM CLEARANCE IN FRONT AND REAR DOORS. COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP DATE: 07/25/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOR, OH/UG PRODUCT enoonor eranrre J 4 9/17/13 UPDATE DRAWING (TEXT) JJR ELS WM 3 4/5/13 UPDATE DRAWING (TEXT) JJR ELS WM 2 5/21/12 UPDATE DRAWING (TEXT) LFV ELS WM 1 3/24/04 UPDATE DRAWING (TEXT) LFV ELS JJM COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP DATE: 07/25/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOR, OH/UG PRODUCT enoonor eranrre J J-4.0.1 CAPACITOR BANK SWITCHING INSTRUCTIONS J-4.0.1 THE FOLLOWING INSTRUCTIONS ARE TO BE PLACED INSIDE ALL PAD -MOUNTED CAPACITOR BANKS: INSTRUCTIONS FRO SWITCHING PADMOUNTED CAPACITOR BANKS: TO ENERGIZE THE BANK FOLLOW THESE STEPS: 1. TURN RC OFF AT FEEDER BREAKER. 2. VERIFY THAT ELBOWS ARE PARKED AT BOTH FEEDER PAD -MOUNTED SWITCH CABINET AND CAPACITOR BANK CABINET. 3. VERIFY ALL GROUNDS/SHORTING STRAPS HAVE BEEN REMOVED FROM THE CAPACITOR CANS. 4. VERIFY THAT SEMAPHORES IN VACUUM SWITCHES ARE IN THE "OPEN" POSITION. 5. VERIFY THAT CURRENT LIMITING FUSES ARE INSTALLED, WITH THE BLOWN INDICATOR FACING DOWN. 6. PLACE REMS CONTROLLER SWITCH IN THE LOCAL POSITION. 7. CLOSE IN ELBOWS AT CAPACITOR CABINET. B. CLOSE IN ELBOWS AT SWITCH CABINET. 9. PRESS THE RED (CLOSE) BUTTON ON THE REMS OR USE THE REMOTE HAND OPERATOR TO CLOSE VACUUM SWITCHES, 10. TURN RC ON AT FEEDER BREAKER. TO SWITCH OUT AND ISOLATE THE BANK FOL OW THESE STEPS: 1. VERIFY THAT REMS CONTROLLER'S TOGGLE SWITCH IS PLACED IN THE POSITION. 2. PRESS GREEN TRIP BUTTON ON REMS RECEIVER BOX. 3. VERIFY THAT SEMAPHORES IN VACUUM SWITCHES SHOW OPEN. 4. ALLOW AT LEAST FIVE MINUTES THEN TEST FOR VOLTAGE OR CURRENT AT THE CAPACITOR CELLS. 5. OPEN, PARK, AND CAP ELBOWS AT FEEDER PAD -MOUNTED SWITCH CABINET. 6. OPEN, PARK, AND CAP ELBOWS AT CAPACITOR CABINET. 7. ATTACH ALL NECESSARY GROUNDS. NOTE: THE CAPACITOR CANS ARE TO BE ENERGIZED OR DE -ENERGIZED WITH THE VACUUM SWITCHES, ONLY. DO NOT USE THE LOAD -BREAK ELBOWS OR THE CURRENT -LIMITING FUSES FOR THE ACTIVITY. PAD -MOUNTED CAPACITOR BANK -REPLACEMENT COMPONENTS: CURRENT LIMITING FUSES: 13KV, 80A, X -LIMITER M&S 531-454-802 23KV, 50A, X -LIMITER M&S 531-455-001 POTENTIAL TRANSFORMERS: UPDATE DRAWING (M&S NUMBERS) LFV ELS JJM 3/24/04 13KV, INTERNALLY FUSED M&S 461-088-059 23KV, INTERNALLY FUSED M&S 461-088-105 CAPACITOR CANS: 762OV, 400KVAR, TWO -BUSHING M&S 225-402-130 13,20OV, 400KVAR, TWO -BUSHING M&S 225-402-23D VACUUM SWITCHES: 13KV, 200A M&S 275-108-120 23KV, 200A M&S 275-108-130 COF P L OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP DATE: 04/14/OD APPROVED: J.J. MCEVOY NO SCALE SUPERV150R, OH UG PRODUCT c„oonv cr lm 5/21/12 ADDED "PAD -MOUNTED" JGV ELS WM 9 19 05 UPDATE DRAWING M&S NUMBERS LTV ELS JJM 3/25/05 UPDATE DRAWING (M&S NUMBERS) LFV ELS JJM 3/24/04 UPDATE DRAWING (TEXT) LFV ELS JJM COF P L OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP DATE: 04/14/OD APPROVED: J.J. MCEVOY NO SCALE SUPERV150R, OH UG PRODUCT c„oonv cr lm J-4.0.2 TYPICAL INSTALLATION OF 25 KV J-4.0.2 S & C DEAD FRONT SWITCHGEAR AND THREE PHASE PAD -MOUNTED CAPACITOR BANK NOTES: 1. INSTALL 92" X 92" PRECAST PAD (M&S 162-251-005) 2. DRIVE GROUND RODS & ATTACH #2 CU GROUND TO GROUNDING LUGS. 3. INSTALL URO CAPACITOR BANK (M&S 223-388-001) ON PAD. 4. INSTALL ROTATABLE FEED-THRU BUSHING 25KV (M&S 163-250-002) ON EACH BUSHING. 5. INSTALL 200 AMP ELBOWS ON ROTATABLE FEED-THRU BUSHINGS. 6. INSTALL 18KV ELBOW ARRESTERS (M&S 334-015-005) ON ROTATABLE FEED-THRU BUSHINGS. CAPACITOR CABINET PAD -MOUNTED SWITCH CABINET 1N 1-4' CONDUIT MAXIMUM OF 100 FEET F P L OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR LFV DRAWN E1Y: J. SHOUP 1 GATE: 07/26/01 APPROVED: J.J. MCEVOY 5 21 12 ADDED "PAD—MOUNTED" JGV ELS WM NO SCALE SUPETMSOR, OH UG PROOUCi ^^'^ ci ioonvr ecmnrcc J J-4.0.3 MALTON 25KV, 200A, 125KV BIL, 1200KVAR J-4.0.3 PAD—MOUNTED CAPACITOR BANK o� 15.75-- 67.00 _ FRONT VIEW 5.5. UFT -OFF TYPE HINGE 67.00 REAR VIEW f 55.00 62.00 1 1.75 55.00 62.00 1.75 tjtid» tjtitlti TAKER RESISTANT LOUVERED AREA (TVP. ) 6 66.00 RIGHT SIDE VIEW DOOR STAY (SELF CATCH/ MANUAL RELEASE) NOTES: I. MATERIAL IS 12 GA. OR 11 GA. (.105) STEEL - AS SPECIFIED 2. STEL IS PHOSPATE TREATED FOR PANT ADHESION 3. ENCLOSURE IS PAINTED WITH MALTON 'POLYMAX PLUS' FINISHING PROCESS TO MEET ANSI/EEI PERF MANCE GUIDLINES PAINT COLOR: MUNSETL 7GY3.29/1.5 GREEN. 4. ENCLOSURE CONSTRUCT10N TO MEET TFE LATEST ANSI STANDARD C57.1228 D Ana n A1®1tl, 4-POINT TERMINAL BLOCK MERERANC 13 �LIDM ai .Ing.,- me,m mn os,,mm Ing., CAPACITORS, 400 KVAR, 132DOV, I5OXY BB. 1 -BUSHING COOPER 101331122 OR EQUAL 23 sso, v.-n,u awn t.02 FUSE MORNING COOPER TYPE NX - CODE 6 W/50A X-IIYBER FUSE M FDl REV DAIS e o Fnm INNER DOOR BARRIER - CLEAR LEXAN 12 F ENBLE COPPER WIRE INSULATOR 25KV, 125KV BIL MANUFACTURERS NAMEPLATE 9 2 GROUNDING MAPS 5 1 METER SOCKET 100 AMP, 4 -TERMINAL, RNG TYPE 7 3 PAFWNG STAND 5 3 BUSHING WELL 20OAMP, 25KV, 125KV OIL -2-1- IN GEAR 0AN WINDOW (REMOVABLE TO ACCESS FUSES) 4 1 POTEXIIAL TRANSFORMER, SINGLE BUSHNG, 120:1 1KVA - INERNALLY FUSED 23 3 VACCUUM SWEICH, 200A, 25KV, 5 -PIN CONIRO, MANUAL TRIP JOSLYN VERSAVAC 23 [ITEM 4 5/11-11 UNC 111 READED INSERTS WIN REMOVABLE LIFTING TARS 2 HANDLE ASSY. W/ S.S. HEX BOLT, 3 -PT. LATCHING CITY DESCRIPTION DOOR STAY (SELF CATCH/ MANUAL RELEASE) NOTES: I. MATERIAL IS 12 GA. OR 11 GA. (.105) STEEL - AS SPECIFIED 2. STEL IS PHOSPATE TREATED FOR PANT ADHESION 3. ENCLOSURE IS PAINTED WITH MALTON 'POLYMAX PLUS' FINISHING PROCESS TO MEET ANSI/EEI PERF MANCE GUIDLINES PAINT COLOR: MUNSETL 7GY3.29/1.5 GREEN. 4. ENCLOSURE CONSTRUCT10N TO MEET TFE LATEST ANSI STANDARD C57.1228 D Ana n A1®1tl, C nVw n � MERERANC 13 �LIDM ai .Ing.,- me,m mn os,,mm Ing., Illt5 wm sso, v.-n,u awn t.02 A I'm/" re+ �x��..E3,rmNn,,.,,�,. .XX REV DAIS e o Fnm .XXX 1.010 OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP OATS: 07/26/01 APPROVED: J.J. MCEVOY NO SCALE — -----• __...., ,__.. SUPERNSOR, OH UG PRODUCT IJ J-4.0.4 59.00 15.00 8.50 MALTON 25KV 200A, 125KV BIL, 1200KVAR PAD -MOUNTED CAPACITOR BANK —60.00— SECTION 60.00— SECTION VIEW C -C —31.00 8.00 1 I I ml ®91 A >---rV 24.00 6.50 13.00 9.00 67.00 GROUND NUT SECTION VIEW A -A HOLD DOWN BRACKET SEE DETAIL 'A' STEEL FLOOR IN C@PONENT CORPARTHENT C� PARTITION BETWEEN CONTROL RTHENT AND CABLE COMPARTMENT ANCHOR BOLT HOLE (40 DIA COPPER GROUND BAR 48.00 I 17.50 112' HOLE FOR GROUND CONDUCTOR i. PARKING STAND x 2' SLOT J-4.0.4 LINE DIAGRAM CAPACITOR TILTS OUT FOR HAINTANANC ANTI-CONDENSATr MAr _ nu ,.I^ l — ^^^. BARRIER: W CVAR b RVM W KVA9 I 1 EMM y 66.00 �►i SECTION VIEW B -B V OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS DETAIL 'A' ORIGINATOR: LFV DRAWN BY: J. SHOUP 7 DATE 07/26/01 APPROVED: J.J. MCEVOY NO SCALE ^'+� ocvicinu nRlr.. nRAWN APER. SUPERVISOORT R. OH UG PRODUCT SUPPSERVICES A >---rV 5m C� PARTITION BETWEEN CONTROL RTHENT AND CABLE COMPARTMENT ANCHOR BOLT HOLE (40 DIA COPPER GROUND BAR 48.00 I 17.50 112' HOLE FOR GROUND CONDUCTOR i. PARKING STAND x 2' SLOT J-4.0.4 LINE DIAGRAM CAPACITOR TILTS OUT FOR HAINTANANC ANTI-CONDENSATr MAr _ nu ,.I^ l — ^^^. BARRIER: W CVAR b RVM W KVA9 I 1 EMM y 66.00 �►i SECTION VIEW B -B V OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS DETAIL 'A' ORIGINATOR: LFV DRAWN BY: J. SHOUP 7 DATE 07/26/01 APPROVED: J.J. MCEVOY NO SCALE ^'+� ocvicinu nRlr.. nRAWN APER. SUPERVISOORT R. OH UG PRODUCT SUPPSERVICES J-4.0.5 MILTON 15KV, 200A, 95KV BIL, 1200KVAR PAD -MOUNTED CAPACITOR BANK i FRONT VIEW `3/8' SS. LIFT-OFF TYPE WNGE 1 j}gJjtj 55,00 62.00 5.00 15.75 --►I --►I 67.00 1.75 FRONT VIEW `3/8' SS. LIFT-OFF TYPE WNGE 66.00 �1 RIGHT SIDE VIEW 'ER RESISTANT ILNEFSD A",I 16 1 4-PDINT TERMINAL O11CK 15 ® 55.00 62.00 g1=3 t}g # 5.00 66.00 �1 RIGHT SIDE VIEW 'ER RESISTANT ILNEFSD A",I 16 1 4-PDINT TERMINAL O11CK 15 3 CAPACITIRS, 400 KVAR, 7620V, 95KV BIL, 1 -BUSKING CHER XCEPI70117FA OR EQUAL 15 14 3 FUSE HUM IUM TYPE MIX - CODE 6 WBIN X -LOM RISE ISKV 13 1 INNER DOW BARRIER - CLEAR UM 12 LLT 12 FLEKIELE COPPER WERE 11 11 INSULATOR 25KV, 125KV BIL 10 1 WWLFACOIRERS NAMEPLATE 9 2 GROUNDING SIMS 8 1 PETER SOCKET 100 ANP, 4-TRDOIAL, RNG TYPE 7 3 PARKING STAND 6 3 BUSKING VEIL 200A'P, 25KV, 125KV BIL 5 1 1/4' OM LEKAN VINDOV (RETOVAB-E TO ACCESS FUSES) 4 1 POTEMIAL WANSFERKER, SINGLE BUM, 6551 OVA - INTERNALLY RISER 15 3 3 VACCINX SVDCH, 2009, I5KV, 5 -PD1 CWW, KKK TRIP JOSLYN VERSAVAC 15 2 4 5/B-11 UNC TWEABEB INSERTS VIIH REMOVABLE LIFTING TABS 1 2 HANDLE ASSY. V/ S.S. NIX BOLT, 3 -PT. LATCHING ITEM QTY I DESCRIPTION 1.75 67.00 REAR VIEW DOOR STAY (SELF CATCH/ MANUAL RELEASE) NOTES - L MATERIAL IS 12 GA. OR it GA. CJO57 STEEL - AS SPECIFIED 2. STEEL IS PFLSPATE TREATED FOR PANT ADHESION 3. ENCLOSURE IS PAINTED VITH HALTOI 'POLYHAX PLUS' FDISIUNG PROCESS TD MEET ANSVEEE I PUSEIRMR4CE GUIDLINES PAINT COLOR. NUNSELL 70329/1,5 GREEN. 4. ENCLOSURE COSTRUCTFOI TD MEET TIE LATEST ANSI STANDARD C57122B -_ ----- . I nwr - IwFRFRANCf oast ,otm ®N t 3 1 XX +_.02 fi w,mrm TG A �V uta sr �Ml .XXX +_.030 COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP 26/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOR, C OH G PRODUCT SUPPORT S CES J J-4.0.6 I MALTON 15KV, 200A, 95KV BIL, 1200KVAR J-4.0.6 -! PAD -MOUNTED CAPACITOR BANK 59.00 15.00 8.50 8.00 GROUND NUT 60.00 SECTION VIEIW C -C —31.00 -►I 67.00 SECTION VIEW A -A A� DOWN BRACKET DETAIL 'A' B� STEEL FLOOR IN COMPONENT COMPARTMENT C cp PARTITION BETWEEN CONTROL DRTMENT MBI CABLE COMPARTMENT ANCHOR BOLT HOLE (40 DIA. COPPER GROUND BAR 48.00 17.50 2' E FOR GROUND NDUCTOR PARKING STAND x 2' SLOT LINE DIAGRAM CAPACITOR TILTS DUT FOR MAINTANANCE ANTI-C@1DENSATE BARRIERS T , 1 j� 66.00 no SECTION VIEW B -B COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS DETAIL 'A' ORIGINATOR: LFV DRAWN DY: J. SHOUP DATE 07/26/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOR. OH UG PRODUCT IJ J-4.0.7 SHALLBETTER 25KV, 125KV BIL, 1200KVAR, J-4.0.7 DEAD -FRONT, PAD -MOUNTED, CAPACITOR BANK 10.00 :1 :6.000 SECTION A --A SEE NOTE 4 0 I 11 SEE NOTE 66.000 66.000 - RIGHT SIDE VIEW SECTION B -B 00 ANCHOR, f OTHERS OF P L MOUNTING IETAIL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: LFV DRAWN BY: J. SHOUP DATE 07/26/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOR, OH UG PRODUCT SUPPORT SERVICES J J-4.0.8 SHALLBETTER, 25KV, 125KV BIL, 1200KVAR J-4.0.8 DEAD -FRONT, PAD -MOUNT, CAPACITOR BANK SECTION C—C SECTION E --E �©_\ @_\ ©, SECTION D—D o SECTION F --F C 00 COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR LFV DRAWN BY: J. SHOUP OATS 07/26/01 APPROVED: J.J. MCEVOY NO SCALE .... SUPERVISOR• OH UG PRODUCT ^•^ o�,.nnu nwir. naewu ePPA SUPPORT SERVICES IJ ©�-Illlllllllfli�� I o �Y�YYY�I� SECTION D—D o SECTION F --F C 00 COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR LFV DRAWN BY: J. SHOUP OATS 07/26/01 APPROVED: J.J. MCEVOY NO SCALE .... SUPERVISOR• OH UG PRODUCT ^•^ o�,.nnu nwir. naewu ePPA SUPPORT SERVICES IJ J-4.0.9 I SHALLBETTER, 25KV, 125KV BIL, 1200KVAR, DEAD -FRONT, PAD -MOUNT, FEMALE DDDR (WB LATCH A 1 , 11 Et m I I C e �4 I � �.—D 66.000 ---E—'� REAR VIEW SYSTEM RATING NOMINAL SYSTEM VOLTAGE MAXIMUM DESIGN VOLTAGE BASIC INSULATION LEVEL (BIL) CONTINUOUS CURRENT FUSE TYPE FUSE RATING, MAXIMUM FUSE INTERRUPTING, SYMMETRICAL kVAR PHASE HERTZ WEIGHT CATALOG NUMBER CAPACITOR BANK T 66.000 Z�B 3400 23/13.28 kV GROUNDED WYE 25 kV 125 kV 200 AMP NX CURRENT -LIMITING 2DOE AMP 9,400 AMP 1200 THREE 80 HZ 2,150 Lb& SCBD-P33251200GSW-GA-FPL CONSTRUCTION NOTES J-4.0.9 -NEMA TYPE 3R, It GAUGE GALVANNEAL, WELDED CONSTRUCTION, WELDS AND SEAMS GROUND SMOOTH. -FINISH COAT IS MUNSELL No. 7GY 3,29/1.5, GREEN. PAINT FINISH MEETS OR EXCEEDS ANS.I. [57.1228-1988 PAINT SPECIFICATIONS FOR PAD -MOUNT EQUIPMENT ENCLOSURE INTEGRITY, -ENCLOSURE TO HAVE A X. 304L STAINI Fcc STEEL FORMED CHANNEL BAS FEATURES ACROSS KINKED ROOF FOR ADDED STRENGTH AND PREVENTING STANDING MOISTURE IRREMOVABLE LIFTING PLATES VITH BLIND MOUNTING HOLES. CSBI'S 'SENTRY LATCH' 3 -POINT POSITIVE LATCH MECHANISM, SECURED AND OPERATED BY 1/2 -TURN, CAPTIVE, RECESSED HEX -HEAD BOLT AND SHIELDED PADLOCK SHACKLE DHINGE. LOOSE JOINT PIN, 304L STAINLESS STEEL, SOLID WELDED TO DOOR AND CABINET, ALLDVS DOORS TO BE REMOVED IN THE OPEN POSITION ONLY. EFRONT GROUND PADS 304L STAINLESS STEEL, WITH 1/2'-13 UNC THREADED HOLE FOR CUSTOMER SUPPLIED GROUND CONNECTORS. PADS ARE UNPAINTED AND VELDED TO ENCLOSURE. FREAR GROUND BUS. FULL LENGTH, CONTINUOUS, SILVER PLATED COPPER. SUPPORT[ WITH UNPAINTED, STAINLESS STEEL GROUND PADS WELDED TO ENCLOSURE GBUS BAR SILVER PLATED COPPER, FREE OF SHARP EDGES OR BURRS. MANUFACTURE'S DATA PLATE. CONTAINS INFORMATION LISTED UNDER SYSTEM RATING, NON -CORROSIVE, PERMANENTLY STAMPED AND ATTACHED TD ENCLOSURE. LEOUIPMENT WALL. FULL HEIGHT. JDDOR STAYS (RETAINED) HOLD DOORS IN 90', 110', OR 140. OPEN POSITION KPARKING STANDS. 14 GAUGE 304L STAINLESS STEEL, WELDED TO EQUIPMENT WALL LBARRIERS. 3/16' GPO -3, GLASS REINFORCED POLYESTER. MCOMPARTIIENT BARRIER. 1/4- LEX(AN, CLEAR POLYCARBONATE. REMOVABLE, WITH NON-CONDUCTIVE HANDLES. PFLSE ACCESS BARRIER. 1/4' CLEAR POLYCARBONATE (LEXAN), SECURED WITH 3/4 TURN FASTENERS. CCOPPER ROD. HARDDRAWN 3/8' DIA PSCREENEDD, TAMPER PROOF LOUVERS. [SPARE FUSE POCKET SPECIAL NOTES FOR MANUFACTURER ONLY: IND SIGNS OR LABELS TO BE ON ANY EXTERIOR PART OR INTERIOR DDORS OF ENCLOSURE, PER FP&L SPEC. (SBI DATA PLATE WILL BE ON INTERIOR OF FRONT MALE DOOR). 2NO HIGH VOLTAGE CABLE TD BE USED DN ANY PART OF THIS GEAR. ALL HV ELECTRICAL CONNECTIONS TO BE MADE MRH HARDORAWN BUS OR RUB. 3THIS ENCLOSURE UTILIZES A TILT -0W CAPACITOR RACK. CAPACITORS TO BE ABLE TO INDIVIDUALLY TILTED BUT AT 90% 4ENCL13SURE BM70H CHANNEL TU BE A 3' FORMED 304L STAINLESS STEEL CHANNEL 5DOOR LATCH HAS A HEX HEAD BOLT. 6POTENTIAL TRANSFORMER IS INTERNALLY FUSED. 71HESE NOTES ARE FOR MANUFACTURER ONLY. COFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR IFV DRAWN BY: J. SHOUP DATE 07/26/01 APPROVED: J.J. MCEVOY NO SCALE SUPERVISOH UG PRODUCT SUPPORTOR, SERVICES J-4.0.10 COOPER 1 15.5 W. 50 CAPAWORS, 1200 WAR 400 WAR PER PWSE SHALLBETTER 25 KV, 1200 KVAR PAD—MOUNTED CAPACITOR BANK F0 LB _ _c VSVB U 0 � TBJI TBI 2 TB 1 3 TB 1 4 J-4.0.10 8 B TB 1 7 m I B TB 1 8 FPL OH & UG DISTRD3UTI0N SYSTEM STANDARDS ORIGINATOR LFV DRAWN BY: J. SHOUP DATE: 07/25/01 APPROVED: J.J. MCEVOY NO SCALE dO- ❑ATF RFVISION ORI(:. DRAWN APPR. SUPERVISOR, OH UG PRODUCT SDPPORT SETM'ES IJ C-46.0.0 TYPICAL INSTALLATION OF 25KV S&C VISTA C-46.0.0 THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW GRADE AND PAD MOUNTED APPLICATIONS TANK BOLT DOWN (4X) 0 TYPICAL BUSHING POSITION ON VISTA SWITCH MODEL 422 SHOWN F=FEEDER L=LATERAL 4 7 r2-3/4• B�34-1/2�-I INSERT1/2-13 W/NC OPTING r EYEBOLT (4%) 2-6' FEEDER CONDUIT 22-1/2 DEGREE SWEEP PREFERRED LOCATION SEE NOTE 16 GROUND ROD � PREFERRED LOCATION PAD BOLT SEE NOTE SEE NOTE 6 -[ TO NEUTRAL BOND 84/0 CU M&S 8112-338-000 ----- 34-1/2' T - �� L ----- -------T PAD/EXTENSION BOLT: DOWN INSERT LOCATION (4X) SEE NOTE 17 7-1/4' A L4 14 L4 13 L3 L3A ' e, __----------------------- Fl L L L I F ADJUSTABLE BRACKET --- ---------------------- r_____________________._____ __ FOR RACKING CABLES —F 6211/2' CHAMBER EXTENSION 79' OUTLINE TOP VIEW OFI PADAND CHAMBER B LOOP LOOP FEEDER FEEDER CABLES CABLES CABLES CABLES FROM F2 FROM F7 179-1/2L PAD BOLT DOWN 62' I SEE NOTE 17 T 6-2' LOOP CONDUIT - - - 45 DEGREE BEND 2-6' FEEDER CONDUIT 6B" 22-1/2 DEGREE SWEEP - INSTALL DUCT SEAL PER SECTION A—A: FRONT VIEW OF PAD UN -29.0.0 AND CHAMBER SEE NOTE 3 GROUND ROD CABLE TERMINATIONS SWITCH SIDE �F L P T T PREFERRED LOCATION OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: A. PANTOURIS DRAWN BY: E. SCHILLING 1 111/14/121 LOOP CABLE IDENTIFICATION JGV ELS WM DATE 5/29/09 APPROVED: ARI UMA NO SCALE IC C-46.0.1 I TYPICAL INSTALLATION OF 25KV S&C VISTA C-46.0.1 THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW GRADE AND PAD MOUNTED APPLICATIONS TYPICAL VISTA SWITCH MODEL 422 SHOWN TOP VIEW OPERATION SIDE TOP VIEW TERMINATION SIDE FRONT VIEW TERMINATION SIDEI I A-4- J 34-5/16 28-3�4 op FEATURES IN THIS ASSEMBLY A. OVERCURRENT CONTROL B. GAS FILL PORT C. PRESSURE GAUGE D. WINDOW FOR VIEWING OPEN GAP AND GROUNDED POSITION OF LOAD—INTERRUPTER SWITCH OR FAULT INTERRUPTER E. 200—AMPERE BUSHING—WELLS FOR FAULT—INTERRUPTER F. 600—AMPERE BUSHINGS FOR LOAD—INTERRUPTER SWITCH G. TWO—HOLE GROUND PAD H. 600—AMPERE THREE—POLE LOAD—INTERRUPTER SWITCH WITH GROUND POSITION I. OPERATING MECHANISM J. MANUAL OPERATING HANDLE K. NAMEPLATE L. SUBMERSIBLE SF6—INSULATED TANK M. 600—AMPERE ALUMINUM BUS N. BASE BRACKET TERMINATION SIDE S,& S \\\ S \\\ S O© OPERATION SIDE NOTE 19 & 20 CONNECTION DIAGRAM SECTION A—A: FEEDER SWITCH F P L OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: A. PANTOURIS DRAWN BY: E. SCHILLING 1 111/14/121 CHANGE C-46.0.2 TO C-46.0.1 JGV ELS WM DATE; 7/27/09 APPROVED: ARI LIMA NO SCALE C-46.0.2 TYPICAL INSTALLATION OF 25KV S&C VISTA C_46.0.2 THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW GRADE AND PAD MOUNTED APPLICATIONS TYPICAL BUSHING POSITION ON VISTA SWITCH MODEL 431 SHOWN F=FEEDER L=LATERAL 4• 7-t/z• 2-3/4• B 34-1 1/2-13 NC / INSERT W/ UFRNG r EYEBOLT (4%) TANK BOLT DOWN (4%) 37 ----- _34-1/2 — — --- - F ' ® SION BOLT RT I LOCKnON 17) II77• A 7-,/4 A I IbI JFlFl L4 L4 L4 F3 F3 F3 i Fi Fi •II3-6• FEEDER CONDORI 23-1/2• _— — 22-1/2 DEGREESPRREEFERREDi LOCATIONI F1 L L L— — — — — 7_1/4• ADDU FOR -- 62 1/2• GROUND ROD PREFERRED LOCATION CHAMBER LOOP aji� FEEDER FEEDER CABLES FROM F3 CABLES CABLES FROM F2 FROM F7 PAD BOLT DOWN _ I I 179-1/2` V I I I I I I PAD BOLT DOWN SEE NOTE 17 \ L_ _ 62 1 SEE NOTE 17 Im mi SEE NOTE 6 TO NEUTRAL BOND /4/0 CU M&S X112-338-000 3-2• LOOP CONDOR _ 45 DEGREE BEND 3-6• FEEDER CONDUIT 68• 22-1/2 DEGREE SW INSTALL DUCT SEAL PER SECTION A -A• FRONT VIEW OF PAD UN -29.0.0 AND CHATABFR SEE NOTE 3 GROUND ROD CABLE TERMINATIONS SWITCH SIDE �� T PREFERRED L LOCATION OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: J. VALDES DRAWN BY: E. SCHILLING III,/14/72 NEW PAGE OF C-46 JGV ELS WMI DATE. 3/16/2012 APPROVED; WILLIAM MONZON NO SCALE III I C-46.0.3 I TYPICAL INSTALLATION OF 25KV S&C VISTA C-46.0.3 THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW GRADE AND PAD MOUNTED APPLICATIONS 77-1/2 23 PAD BOL'I� I_ DOWN \ T SEE NOTE 6 - Fi 3 u II ti FVA I 11 1 /a (4)1/2" SS BOLT ANCHOR do WASHER BRACKET BY S&C L 1.5" \ I„� POLYMER—CONCRETE v PAD ENCLOSURE ANCHOR DETAIL AIn'7m91L9 1 OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: A PANTOURIS DRAWN BY: E SCHILLING )ATE.- 7/27/09 APPROVED: ARI LIMA NO SCALE IL u II II _ fl OFPL OH & UG DISTRIBUTION SYSTEM STANDARDS ORIGINATOR: A PANTOURIS DRAWN BY: E SCHILLING )ATE.- 7/27/09 APPROVED: ARI LIMA NO SCALE IL C-46.0.4 rxr1GAL iN5.1'ALLA'1'lON OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW IC -46.0.4 GRADE AND PAD MOUNTED APPLICATIONS MATERIAL LIST ffEM DESCRIPTION QUANTITY M&S NUMBER WMS CU VISTA 422 (4 "WAYS', 2 -THREE PHASE FEEDER GANG SWITCHES AND TWO -THREE PHASE, INDIVIDUALLY PROTECTED LOAD TAPS, WITH A STAINLESS STEEL 279-209-050 SW -VISTA -422 -PAD 1 ENCLOSURE 1 VISTA 431 (4 "WAYS', 3 -THREE PHASE FEEDER GANG SWITCHES AND ONE -THREE PHASE, INDIVIDUALLY PROTECTED LOAD TAPS, WITH A STAINLESS STEEL 279-211-050 SW -VISTA -431 -PAD ENCLOSURE 2 PAD AND CHAMBER FOR PM OF VISTA SWITCH (77"X 79"X 40" DEEP) 1 162-690-790 PD-SW-W/CC-VISTA 3 600 AMP T -BODY ELBOWS (25KV) VARIES 163-639-007 TM -PDF -600-1K 4 200 AMP BUSHINGS (25KV) VARIES 163-864-001 SW-PD-BSH 5 200 AMP LOADBREAK ELBOWS (25KV) VARIES 163-502-001 TM -PDF -1 0 6 PROTECTIVE CAP 15KV ONL VARIES 163-022-000 TM-pDF-GC 7 ELBOW SURGE ARRESTERS 25KV ONLY VARIES 334-015-005 TM -PDF -LA B GROUND ROD CONNECTOR, CLAMP TYPE 1 120-036-106 DG -CLP -S 8 9 GROUND RODS, AS NEEDED VARIES 130-614-005 DG-PKG-5 8 10 GROUND ROD COUPLINGS VARIES 130-405-104 DG -C-5 8 11 4 COPPER WIRE, SOB 6 112-309-000 12 #4/0 CU CABLE, 600V 27 110-101-169 SW -PMD -GC 13 #4/0 CABLE CONNECTORS 6 120-B71-005 (Qty - 1) 14 COPPER TO COPPER BOLTED CONNECTORS 22 102-800-002 15 STANDARD LOCKS 2 546-246-011 SW -PMD -LOCK 16 CABLE MOUNTING BRACKET, STAINLESS 12 160-310-000 SW -VISTA -MT -HOW 17 BOLTS, SS, 1/2"X 1-1/2" FOR CABLE BRACKET 140-515-557 18 SPRING NUTS SS FOR 1 2" BOLT FOR CABLE BRACKET 161-463-000 19 LOCK WASHER 1/2". FOR CABLE BRACKET 145-294-010 20 800 AMP FAULT INDICATOR VARIES 163-297-009 P-CL-FCI-800 21 ROTATABLE FEEDTHRU DEVICE, 200AMP, 25KV 6 163-250-002 SW -VISTA -422 -PAD 3 163-250-002 SW -VISTA -431 -PAD NOTES: 1. THE INTERRUPTERS MUST BE PRE-SET BY THE ERC PRIOR TO BEING ISSUED TO THE JOB. CALL B63-4921 OR 863-4900 TO MAKE ARRANGEMENTS. 2. THE PAD MOUNTED VISTA SWITCH MAY BE INSTALLED IN AREAS SUBJECT TO FLOODING. 3.. SEAL THE INCOMING DUCTS PER UN -29.0.0. 4. THE SWITCH AND ITS ENCLOSURE MUST BE BOLTED TO THE PAD. S. REFER TO DCS UH -41.0.1 FOR PROPER INSTALLATION OF 600 AMP T -BODY ELBOWS. 6. BOTH THE FEEDER CABLES AND LOOP SIDE CABLES ARE TO BE RACKED THROUGH THE CABLE SUPPORT BRACKETS INSTALLED ON THE UNISTRUT IN THE CABLE CHAMBER. 7. CABLES MUST NOT BE IN CONTACT WITH THE CABLE CHAMBER OR PAD TOP. 8. ALLOWSUFFICIENTLENGTH OF CONCENTRIC NEUTRAL TO REACH GROUNDING BARS AND PERMIT THE FREE MOVEMENT OF THE ELBOWS. 9. MAKE CERTAIN OF CABLES LOCATIONS BEFORE DRIVING GROUND RODS. 10. APPLY CAULKING COMPOUND TO THE SEAM BETWEEN THE ENCLOSURE AND THE PAD TOP. 11. DUST CAPS USED FOR COVERING BUSHINGS AND BUSHING WELLS DURING SHIPMENT MUST BE REMOVED PRIOR TO ENERGIZING THE SWITCH. 12. UNUSED LOAD TAPS MUST HAVE BUSHINGS AND PROTECTIVE CAPS INSTALLED. UNUSED13. 14. AFTER THE POSITIONS MUST HAVE 600 AMP ENCLOSURE HAS BEEN INSTALLED. THE�FONGSBINSTALLED RA BRACKETS MUST BEREMOVEDAND STORED INSIDE THE ENCLOSURE FOR FUTURE USE 15. ENSURE THAT THE WARNING LABEL (M&S #548-560-104) IS INSTALLED ON BOTH THE CABLE COMPARTMENT AND THE OPERATOR SIDES OF THE ENCLOSURE 16. INSTALL FEEDER CONDUITS AS SHOWN IN C-46.0.0 AND C-46.0.2 ON LEFT AND/OR REAR SIDE OF CABLE CHAMBER TO ALLOW FOR BENDING RADIUS OF CABLE. 17. BOLTS FOR SECURING PAD TO CHAMBER ARE INCLUDED FROM VENDOR. THERE ARE 4 BOLTING LOCATIONS AS SHOWN ON DRAWINGS. 18. INSTALL 800 AMP 30 FAULT INDICATORS ON EACH SET OF FEEDER CABLES. SEE LN -14.0.0, UV -14.0.1, & W-14.0.2. 19. FOR PAD MOUNTED APPLICATIONS, THE BASE BRACKETS ("FEET"). "N" AS SHOWN IN C-46.0.1 ARE REQUIRED. 20. THE BASE BRACKETS ARE NOT REQUIRED FOR BELOW GRADE ("UNDER -COVER') APPLICATIONS, BUT SHOULD BE KEPT WITH THE SWITCH IN THE POSSIBLE EVENT OF FUTURE RE -USE IN A PAD MOUNTED APPLICATION. 21. INSTALL ROTATABLE FEED-THRU DEVICE ON THE LOAD SIDE OF THE VISTA SWITCH (M&S #163-250-002) *FPL OH & UG DISTRIBUTION SYSTEM STANDARDS UPDATE NOTES 16 AND 19 ADD ORIGINATOR: A. PANTOURIS DRAWN BY: E. SCHILLING 2 11/14/1' NOTE 21 AND ITEM 21 JGV ELS WM I 9 2 IDUPDA t TTEM_16 GAP ELS_..._. BX_ DATE 9/1/03 AppROVED; ARI LIMA NO SCALE i, , § i m I "MHUNE SEE DWGFa05RZ17 _ ___________TT_ II-I ar- f piz 9p Fe. I � A g♦s;:j5yv I e II :RINI I eiF•� i i I e yy. C av I I I p 9�a� IC Aga 'Y vaa®: I I I❑ f�la I i WRm� v221 _ ®1 Ufa etj m d ,,i Y s a I ++ r = — �e w � <"• a � 2 .£'eR go 1 3e I I 1a, I 1y� M 1 R s I I I I 11 3 eee I O$� app, I pyy 1 3 �•aE§� i 0 I "MHUNE SEE DWGFa05RZ17 _ ___________TT_ II-I ar- f piz 9p Fe. ' I I A g♦s;:j5yv :RINI I eiF•� e yy. C av I 9�a� IC Aga 'Y I I I❑ Ya1C1NNE SEE OWGF105R215 WRm� Nila etj m v? (J 2 .£'eR 3e ^ � p I 1a, I 1y� M 1 R s I I I I 11 Ull L v A g♦s;:j5yv I eiF•� gr,.•� $ yy. C av I 9�a� I® Aga 'Y I I I❑ Ya1C1NNE SEE OWGF105R215 Nila v? (J 2 .£'eR 3e R s pN 3 9$i3 it 1q WTCHUNE SEE DWGIAOSR235 rd d X1 �y 8¢ A$ EDT a otyv EDT 2EgFnggg3G �; FP F T i� �s!�a • >i 1q WTCHUNE SEE DWGIAOSR235 it �F���x;f�d � ❑ RF illfi%l. rd d X1 �y R iI• FP ?a i� • >i r Jilt •`xQ 1 7 A FF ;S �'! cce-eP GG� � 4 !a WRHl1ME SEE DWGl103R2U it �F���x;f�d � ❑ RF illfi%l. rd d X1 R iI• • >i 6111 w l •`xQ 1 7 A @ egg � 4 WRHl1ME SEE DWGl103R2U C F �y sa�3y F ❑ $'as'3 g. a g " ❑ g AJ � 1101 lull : aoc __—_________ WTCNUNE SU owc/Aa5a2w ___________________ -xq 4ma. r- --------- couxrr x=� 1r s s r (( t lip E a a MIMI,l� + pdRl• y`G. 5. BJW �i0A79 NV390 NJ vn es .$ _____ a3 �` E � nouaM1YiSfAJ tQ�N ginggC d� II a§4 ce __----- __----- —_------ —— -- H UNE 5EE YWG/AOSN]3p C 3 —PrIzzull .3 v ���38s3 fQj3q � �! C 5 i n� WSHUNE SEE DWG/103RU7 5�--_ Ae z Y ¢ . �� � 2 i 1 4�'��• C I :g ;T I ' I R r iv o eoe i ❑e❑ i i i i i gg 9R Fri E A t ( d�ab5j9 . n.v`"` Dcrw ► ; p I �' a y O ®❑ ii[R 13 ® ®B 9@figs A i @g9 '� aRiR2�R R Rei ' i i i❑ a: N YS 7 ZZI sAqV0000 ❑ F vo€H�� Ca €�� u E €g ng [o € i� NSA 0 F :ii 3 i= e i a� c et7�e� i ,_ (VT ❑ AIA/aro n� F .+c HAMHIIHE SEE PMGW5RM ------- —_____�Aei ®2a� ne dgfFi2x :Fnpr�,d:--fa�a6� S�8" _SA¢rpgS,�ii_ — —------p°a3p ¢¢3P I i I aRRESa I I I � 6 I I I I ' I - � IR RNI FL:Ytl, • I �� M [6 —_—_ � •'^-T-_�_— ^a�ls� I�t�scy z�, _ -•a Ic�Fi Fiy 3 � � ••e � I I: -�J Wrwmr , i S _p ey Pr I CPGPS I II �i4�I 614 e e e G'il I I _ Ig a I'.2 /' g�gNZR a 415 a gg • 9 I Fi� � _ a 1a A �s ¢ e e _ :13wr I e I------;-®----- I - _ -- ----- 11 ____------- ------ - F -- �: I ; . € ¢ g €�'F5 ey7y7e pFdgc§c® yy I [' I PPp 6_____' 1 __ in L A i❑ tl Z.' 1 2 ___--___ _ _ PA ___ _______lam 9g NATGNpNE SEE GWG/AGSRI}) aG�B� 3 M $yY ❑ m�NNF of „ZR I,rm' A - m ESS.9sg A t !n � F i S.e�= � i x ❑ 2aE;xAj IL y : m IYEENIINE SEE °IY°a1°SNEn4 I a g g ! 9 FY5 ' a SS !€a��e ® Eg® i4Q{Es ! I eg }�a � •gEg, ' j§ SSSS � � s MIA �' I i 1; STYE e� i! �•• �ti^w � '� I I aa. � �� I!! •., � I +I FEF€ ... ;+; I C ii i� g �__ • �_ I � :,� I gPg---- F I I eqf 1e- =1 F it Q al�i x '� =1 , j' YHas Ol9 en pill z oo13 g �r a I� -413 loa a � I ggnECfa � 5 iil! `+rG-:� n4 �• � ^R I --- ! :Jett WTpUNE SEE OMG/AOSnlS2 J ° YYYY CC Y § x85 ! c � a ° a a HF lHYP NONA i PP z F .4 y as +3EiSA 4; se L�,yH $I $ ❑ WTGNIINE SEE GWGIADS O — —-------------- — ----- 1 aa ��/ 11 I j IYFad� I g < ^Y i aj:' 1 p 1 a +d Q§a I t I f I RQ iU a =' a l �, • LDT u �E 55 I n �S � umrl IDT /5/. •' �i I " a1 Sl r�„ a i a�n;' wi is ! a g9dad�B! Sg?'s' O ;gy���Qe3s ling dS 4� H �A,p OP �-• e¢eX � I �5: A.511 /A � �o 1 I flaei' i a8. a 12 i❑ 1 1 m a g9dad�B! Sg?'s' O ;gy���Qe3s ling dS 4� n �-• e¢eX � I �5: A.511 /A I ____ YAIDNONE SCE OXG/A05R212 3 Y,EY A 1 INil 9 FNO $E a -----_ �� -1 — — • _s 1. ZT Z \ 1� o l > ; N a r a°Ei]9 n00es.SiiY pG 5��96E�a _ yRaapp o5ff l �I a 1 Et9 a �i55 {i ��a9SAip 'Yi is a ,qq bpdd�p E 6+�3 O 1 a l u L' " M IR3 3pIij� _ S iBialsafa 59r eec-` Vola s ip ------------ — --- — -- ---- -- — — -- 1�--------------- ----- ------ YAT[NLIHE 5EE p'M G/1058210 --- ---- 4 up- 0F0F5555 D000 eF ads?gpe�� g§ o F � Aa wTCxuNE SEE Ri�D§ i Y $ I I a ❑ a a I ee � WLCNIINE SEE DWG/AD5R 6 g �a.a it I ❑ aria i I I I I® I _ I RM'is i �cOBai 2 � ❑ ao Se— i i Z{ � 55 Fa syx 1 G i [ agSg�;i 33 �a3 Y # x 1 ❑ 'aq�eE # USe[ � rel eD P , 2s �� ��� -- , � _ (/ �� ~ a |A / 9 ���� .. ! /I||, ; ' ! )| )| d,! | 9 2 I �! / % � ` |b, La �� �� a m ���}\ s���� \ �� m : n7Z | I / 19 g | �� 7 m,/4ale IM9C ,IDa.1Y ql33' ym n 1 �i go!� got i, S a��6ff;e 9$F �C I� 'Y esu i����cayyY § i �? g } ie•� yP 9@ i III i IYSRS6I III BYfi}gkafg_Y��•y� f�pn...�9•l=l;tii .b5V3Si �i—__ vYy iia 6.�p=YF��•Y��EYY�S i I III IP All 1�i —II _ a +__± i e� yk m� II Imo--``_ __`__ _ __ ,•11 '1 i7l ILI ual I [ !! I I Vill 7���pt I� I I �I� m'n a A p 1 III-� Im `�• I �' R III}` eoe 1 •b I I I I.I � � x a I j y i IIS III, ist I E i i 1 III} I 1> s:. 1111} V eo 1 III III-¢—¢--� —_- a --� e e g s y I III 111 fi t i Ij1�111 I 7 Y I Fj 3 q4 III 111 - I II _`[e• . �': e III 1 10Inks I e w RM- Ji M Y,�i B B Y ui +9d _ k p // CH M11F - c 9r 4 I Na f ❑ �� �� it, k PMI'll N �� % K K / K( e ��;J {( ���� ���� �� | �%| /\|f. . 2�� �� �� '��/ ----2---2--�� -- La - -- - - | �� - _-- �� ��� \ ��j\ G- ! ` ` M rem � | 77� � k § � 8 0, | |�\�0 \ , -- M rem � | 77� � k § � - - k � lab- #R/ 7 ? 2: 4�F B M AIA ` # § \|S � � _ ■ ■ - —, � PLOT OATS 3/5/2015 PLOT TIME 9:57:01 AM CAO NAME' F > a 1/I ASBUILT AUTH NO. NO. GATE N SIGN - MA I 1799-07-410 0 12/12/14 CRIMINAL OM r" C 4919489 1 112/12/141 PULL FOR k PRI CBL, INSTALL NSTA CABS k PMTK'S TO SVC GU FSTREAM PARK PH 2 e • =n n o • g v K O Sl m; a ra KI Dom-, o m o - n 10 G J y a S 9 m oy _o acc mnr�.jz ;FoSOo�m o m to :f So 'v a nn m��o�omiiym �% 10 > > aE vai '� m ;olOzmcDm<o Q O CIO ' -0 ��N.m8i>j� azyoO Do 0.,:r vO L � a cCZ�yY mm jy -__''P • mDcF� ;Zn�ZOy0 lD/�� aO OAV[jD DO �• ac�zoioC-m'1i Z n mXF OED CZmZzsyxmaOi0 OOO a2'OODmX -CryN AJZh jA 30• e y m OozOC-ma<mm Op \- • p DO��a mmZ, m _ C Oz9�N o m 10 OooA�mi 0.Ot 0AM 3/4/ 5 R➢i 1LLE: IQN:17 NI Gp NNff: Ell � � Z p 4 oCE4U 5-V0_(5.2. A, FA) S e. I+hAI 4 5��55����€�gEgggE v PI R 3 i-A"£�za �'� � fq a r: c� -r e y MPH �vAg `h�ppOti p & F 33 I OC 3RRR�EE_a1rN YZIS CjJp "Q. G 0 0 0�I 7 m DOC i ma • g ! - - �: J11JItI a u L7 a$ 23 ml, f� o p O S s..' ,y,�c��°`rs n nL VLA nz 113 nA00 AIA) A� cNC mu \ v o� a S� E3 i o0 9 E �v ❑ 00 fu S; -: 0 gs a s g � Rom WZ °e r y n°^o�R 80° _ g n ❑ •Ha$P$Q D c. ag z=om NZ ❑ �„ 3s F m9 m 48 cA g "sfo= � � ❑ c N a e e� z $ n CD f paf�e C d Y d d S i oo ®m ® o o o 6xs>: i D av O • � f.O1 0 00 � n • O u m vmn %d1191 .SLi n 111— _______— - ahl v min m/1hc �+. AVM 3Aw NV300 'N I' a GULfSTREAM RD. E s Y 2 _ 2 O DU(FS= RD. ro — ❑ R' o m Z 1a r � � C i Y. y, OA _ C N DR/VE ❑ n WAY 2 —a $ a •q - f: m a i ® 00 EXIST. DRIVEWAY // I c N a e e� z $ n CD f paf�e C d Y d d S i oo ®m ® o o o 6xs>: i D av O • � f.O1 0 00 � n • O u m vmn %d1191 .SLi n 111— _______— - ahl v min m/1hc �+. AVM 3Aw NV300 'N I' a CR Y 2 2 O DU(FS= RD. ro — ❑ Z 1a � � i m y, OA _ C N DR/VE ❑ n WAY 2 —a $ �� r ��}y : -- ;��,|} " . . PLOT DAIS 3/4/2015 PLOT TIME 1855:51 AM CAD NAME Ea *L H ASBUILT AUTH NO. NO. DATE REVISION - m 4781-07-410 ORIGINAL DWD y4618489 1 1 11/25/14 PULL FOR k PRI CBL. INSTALL VISTA CABS & PMTX'S TO SVC WLFSTREAM PARK PH 2 A y�y B �n SF9I i a : 9a /0 3'D no m v Day a I p 46 • ? SpA D C d 3 n t 1- D' 'E — o b . BLVb 8 d !6 �5 u N GE — -10 ® ❑ ® azc_r1 •13KVSS 1 Y z uor- � ❑ ® [01111 sir c YgA m2 ° P N z Z m c f"T o z uZ f n>am Zara C C f J n B O z @ 'a c o E N ~ + aCN->-1~OyC]yZ c m m F Y N N I`O O m o z U1 ❑ ❑® azo>80�z-ia In n or mg!osC DiEc / A O y m m < . Cj A DCtl 41 Nol Jz W$ n _ N ooma�m>ozm / O F (AaMUS25om� api; o'1< m /ZLX 0 Dip Qp.D L ❑® ® Nyxm-'Z- MM isc Sl v / / a moo J 3p b �`\� f'l m3�O�ro=�>s m J 2 F nC 2m N r� u ED Gmm'�oHOA~ om��~xaA �npzA aom <r I T- ISO T C_ �amZ Z `l 2y u c K m o mmz�mz y n zwNj 25.m -A z �iK na 2r Rr a ❑ S O amasFS2Fp� _ r n [T y rz ,ni DO >o -I m H` 2 o V:Na>p_ odK C " O ❑< A zB ,C mv mmzmoon > n ,`� p '9m> D D D 0 5 < D C= O OM A 2 I.A1 /� -Z_i Z O m ' O r �1� " ITl O L4 Z in m F 9f e TT1z Z - ;o EA m g m N MV Ai D a o Z M ol r s A q/VO F 7m m s �m 0 x PLOT DATE 1/30/2015 PLOT TIME 4.44.17 PM CAO NAME AXG z N ASBUILT AUTH NO. NO. DATE REVISION 283245 0 2/07/02 PULL PRIMARY AND INSTALL 30 150 KVA PMT% O 3145 N. OCEAN BLVD 4 y ti 1765603 2 9/03/ UPGRADE TX FROM 15OKVA TO 3DOKVA _y • e n 4618489 } 12/03/14 PULL FOR & PRI CBL, INSTALL VISTA CADS & PMTX'S TO SVC GyqSTREAM PARK PH 2 aa5 a� K a� oil O r �i I 9e APPR. 500' R/W OF e: 3 y3 • S APPR. 900' TO R/W OF GOLFVIEW DR. LAKEVIEW DR. S� I E3 i -r1 C 3 /1/OT-13KV k /1/OT-N i�Ln I C W. R/W a m _ Z N N I C m m ir a iF A 2 w I a n D a a a 0 0 ❑ ®I o ® 5 N. OCEAN AVE. —mom _ V v C NO O m 2 _ R @ a R w s v v a a ❑ a ® fnyZ mmsnra-i Kz �mpp Om w N a aVtn . C N ® ®❑ me �mn~m � � � m�So f = s vnmcs� �ar`ctiomm 1 z'^9 _ > Y $ ^ a o p D m O a�z�0tisi m mw ° -' 0Z -Z-0z . Sal^' n _ V'NC I s l FrI n�1000 N IC/I�I l ❑ > € ❑ d N fTl O Z CCz0A2 �� zmz 4)mza zm-I -40 ❑ ® ®® p�OT��IKmmrpL�y �f i0P1wm CpP�D PM z N Z omnczi S'1� Fro a9 mommSza ,pW mzm I O n rl m m r O ON mmy ym2 v I D p 92mSm n myym mmvc la0 ~OC:Omp D n O 0 v 9 v zz m c 0m0 mA n mTnaom m C'1 -I i m 9 C v z z m z n ti ❑ r n y ?; nm� mmmm�^ X71 m c z 2 D o g p- ym y O v UT mzm� "m 0 < v �� N mmafs� m z w %av5zpmma avvyKn� S� I r 1 m O ❑! n u f 1"ZOOASIAL > m WAIERWAY aw INS Y TI m 0 > m rri a yAOrA�r D i Omz SD m mm^tm� ��c I -ii xSoyim Z m m Z y v bio a' 0! Dma r w m Z P imam �v n ro n i� cT in c c m g nm mea tt 0 mp m mg N p <' A z CAN m r m m m m I� I 7 n N 3 m ❑ 3 0 m 0 1 2 w ATIAoc DOE% t� PLOT DATE 2/5/2015 PLOT TIME 4:38:45 PM CAO NAME: AXC — ASSUILT AUTH NO. NO. I DATE REVISION R m 3041462 D 3/14/0 REM ON U11UTIM INSTALL CO PMTX h NSE. PULL CBL TO SERVICE 4450 N OCEAN BLVD y F 4618489 1 1 12/19/14 PULL NR k PRI CBL. INSTALL VISTA CABS 8 PMTX'S TO SVC OIILFSTREAM PARK PH 2 Ya a 9� n K lam, � @ gg 6p6p " os: 3 e`3aR 3 R @ ads2 �P =• N �g9 `§ 8��� 2IA oa—i _3 b y A ~ aP,,gg ik�3'3sas� o ®o R° _ IIUW L $ P AYI b i Q N A 0 N A O 4 D; < G f3PN3C —2PN2C B5+ —2PN2C 5D• —3PN3C o 1PN1Ct 1PN1C—i--1PN C -85• +A` Ams D � -YN•N xm u (102•) m13 .I 0 /� Jc I z in ri n v $ o sC3�p, a Ill m I I u 0 x D o o m J ® I ❑ ; ❑ ❑ _ I N a ® ❑ ® ® co � � ' " / N 3 W Ip 1 �C�✓ go e9 2C) m� o s D Q c N > v CA N rzn Z / _ _ 2 m Z C n Z N m rs: :s°Y 2 $ = 4 V Im m •�' ° z o O = ❑ n I ti e7at�i;'s i ; c k Y vm A =Ya3 �'• � D N oo V =Y•° s' 1;eEYE O o Z= r > 54a -Ya' m H tEOERy_ Hw ~ ai N 9 _ xe_ U) +Jy r mo, mm Ul n > 8 =: Gl nz 00 �' ��� - ITI m sm Z � m '--I � ` ❑ r Z6 'm = x DcvN Taw m 1 NIANIIC OCEW ��r. I< e a^- ��32 s 4 ��C k S G mIE�� ��I 1 t'S J III: 1 i i ] " I If f 4 S l ii�� Ih aaa Boo ea0 if u 3 Q'T 8Q' q g]E !! sQ 111 l L Q'Q' Q' BQ' ^iii rpf Oen �� l//��"�������� Am SEE pWc AOSBFIo p ��9'ss b r i u ------------ Mo s ��; 9  " : E SEC a���� o Y I ��. vai Q' x' 9 a e`��59 a it ��a p• ena. lgg�zy 3 a?8Sx' �9��• \� \.0 - 7f Fg�gi 7 ; Y'1 a e:8xse na. al ii � � 1�1 �=' i � xSa'•• �e I16,a'$ :. yf 0_7 Imo" I x e s 0 00 f' R ¢• f 1 P� o e $9 f t P as � as i I' F a • g � l.J LJ �� .i 1\\ 0QQ a �G °e o0 p ee ❑ 3g! Opu ii`.$ E b 7 E I 7� ainy � u � � � ❑ EM 13 MON .57/ - n iA DM1I] i � m L 3rn oY12 fly_ z ^ ._... -...TiST f11GE CL CXWMFL save n a CVT P-5fi c-56 L - f4A V.S YNY fdRS 6 EN®M <D -� 36 ..�,_..._ -LnF.na ek-x..xse afirm oLrn9 9L. o €�€ XF G N m > RIlk g og tV� <i mz B o. m s EM 13 MON .57/ - n iA DM1I] i � m L 3rn oY12 fly_ -7A . 3 —ir 1013T Of CUT T P-55 M P-55 INTRACOASTAL WATERWAY (P.B. 17. PO. Iib, P.B.C. S ._... -...TiST f11GE CL CXWMFL save n a CVT P-5fi c-56 L - f4A V.S YNY fdRS 6 EN®M __ _ _. _.ip.Lr Paa[ci mxma o•u 9m �rfirixarr ,uamlxuc ro L9un ..�,_..._ -LnF.na ek-x..xse afirm oLrn9 -7A . 3 —ir 1013T Of CUT T P-55 M P-55 INTRACOASTAL WATERWAY (P.B. 17. PO. Iib, P.B.C. PLOT DATE 3/5/2015 PLOT TIME 10:34:06 AM CAO NAME E I > ASBUILT RUTH ND. N0. OATE REVISIONf.L p H m 0427-W-410 0 /17/6 ORIGINAL DWG y4616469 1 01/22/15 DH/UG CONVERSION GULFSTREAM PHASE II .g 8 n m �m DmNGC-V @^ -` • � n� O� � p� 0000 _ NO N.mpw�00 aS < �� �\, I I I 1mz13 3 > e�e� n 1 OO m v A mo �6• a� xmm^ C •s �� ~ O>r LC• d\ v�0 m mw zm 0 3 A > 0 0 m❑❑ � V o z n X04$ 3 �0 1 r P Iv m z O as R A• I11 � p o j I .''. N a �Z C �C 4 > A In O 13 11 IN 'm zz a�� 'z l •; = `� is s X93 5 F yl� t;i I < I m . � K Z A �N}• � 1 � m r' m ❑ a� �, � .I, \ m N � E m ❑ ❑ a ❑ C; n i T ❑_ I 3p � _ P P 7 b:{-L:n m � Pn✓s./P�-i✓s>G �c� It N D s9• W a �' F A p 4 n ml- x J >6 O < ��9� mD ❑ e mm c om m =u FE `o^Roo o ' r m^Qo.on r mm A u aop� O n^ n 0Z-) O^ ^g¢N ±BM' TO N OCEAN BLVD $0 m mm` n m mnaa UI 07t r. _av oao m .D mm2Cp 00 mmc cn Om .+>1 Oxa DO Eno mm Am o5�.30^ no m0 y m lo- 0 m o IV ❑ r 0.80 I d 0 Ev � m PLOT OATS: 3/5/2015 PLOT TME: 10:53:50 AM CAO NAME "I - c ASBWLT AUM NO. N0. OATS REVISION - m c 6160-04-416 0 10/02/9 ORIGINAL OM 9 N ti 4616489 1 12/11/14 PULL FOR AND PRI CABLE, INSTALL PMTKS FOR GULFSTREAM PARK o; n cF o o 00 rnD� c m> I N I W N _ y 1 O O °-i E tn�' '3 73' V 0 A 1P rn EDN ED AY RD. I O 0> 1P p JWRIG a a 1109' goo D O O ' 1P 25' i RE xEOR 's a 1° O A {' MI Z A �_ N Q 9 jOJ Q N jy �¢C :1P \ J ale OCN]O�D[\li �{ ai{$ 5d5 fag. E ml x'• °io �. >I$S.p m wlI m WRIGHTWAY RD. LmO U, : A. 3 m I i N DtimD� I J n' LA rnmD I C JO) j ME U 0 �! I W C5 mWN O m 0r. ❑i?g ❑❑ N ma m U Ot rn 9¢�Z ' jS p O w NCO �N o t a n F m N ED Z S VF � N N AO o x 0 c i vE n O W a 0 ❑ "��ald O p OO o2 z to ❑ 0 v�3 RR(�U NOU O U N UI m n J R, n f O O _ o D O r A O s -1 o Qm Oo 3 c uzi < D ti 2 " 0 41 O O O 'p `G A C C Z Z O 0,0 ❑ ] O 2 2 Ooh,. �'oo rzi n z " b Tc o� vp o z E wN - n m ^0 O 2 g\ m E m 0 m z rmn < N] 0 00 0- o O r m t c m O El m Kmx f n WRIGHT WAY o = Q DO < (OP FD' N 0--10 CA m O D 0 0Dm O \Cn D Oc N N m O 0 v) C UN M F m Z Z VI 0 00 C70 i W tD D_ - 0 0 O N S T in 2 U1 W O ('i= Z LD'1 N S� 0 0 O O 31 N L00. n n O Z a P A (i m o �o ❑ m 0 u 0 O (n r_ < 00 �o =< fTl : O m = 0 n� pA 0,, r 0 i a m QiO o m GULFSTREAM RD. ❑ a0 < -1 0 ID f N n. p < 0 l; T5' = S.R. A -1-A oz a mco �� N to $ 2 PLOT OATS 3/5/2015 PLOT DME 8:42:34 AM CAO NAME IXL > - g a I/1 ASBUILT AUTH N0. N0. DATE REVISION 347546 1 I 2/03/0 REPLACE 3-7$KVA N1TH 1-SOOKVA 9 c ] ; F 4618489 2 12/10/141 PULL FOR 4 PRI CBL, INSTALL VISTA CABS 8: PMTK'S TO SVC CULFSTREAM PARK PH 2 E n v S II I R. 9s gd ' R , -Dim m I T+ 4 is • -i � ' I� J iC-Ul✓� I f TI £O00 +` 1>f D O °� n d 8 I j I Ln ®❑® II..LI. I I A El NN m m I �, e [ ❑xm ❑® II I I,. ATA Via\ \ 8 5 I ISO'.-IOm�mo j L r i? 11 I i Fc 01�< � ND m1 00 IV. j ,I�. i. Aim < ❑ oo I i. III'I i � I a b 9 I ❑ ® ®® g'c 0 ,° m F Io Io mo 0 A z p� - s £ c •G J J O `o�Jo. ortrt Inn c� o� z i m n A 0 m m vo O J N_ 0 f0 J Z C z u o dm o _ C, y z < — J C N J 0 0 0 CL I m rn g 0 1n o- a C aV X m � z O ❑ I 2 - T FnF o- o rt IO N hi A N i J J m 0 a 0 msN3ZT f m r— ❑ zo T D> :O J Oh N J cT C) Ago li OO m 0 J C� � � D 30 OH v'o v N< n 0 n p m a:, C - V A j 0� A O GULF- a z In " fTl w Z 2 0 z Z lz,! STREAMmnits RDcri r m <0 � �n 2� fT1 i� aI Cm i Nmz m om9 7 C V� >m raf]l x 3 O oy ❑ v / / § ell a , . it;�•; § � _ » !: ,•;;;;�) > SO. �Z ||1 - . �_. R §§E53/�.\)� , ;.. .'■ ,. 2 so � 9 . . & - ®f -§� 13 E3 cz o . � _a _m \ , ? §13 : § § ® •|/}/ �2 \ / §3 xwr wre ]/3/3¢15 Rn! m1F: I¢Sin w W xu,G EA 5 x� a� a 3 2 = o Pt yy ay E �En d NN I f ~ @§ �P �c O a a a 'm s� ®o ® m i @ I is'5q§ n o e o I I? VA m I I grg} A ZM O O ® Si a • 3F 7 Q� ®2Qti� ang,g nR 7 , [ mai p A t 5 A yy:9 4 C o o �g��e3tl��R ^B B �n,vnK ae3� ARFgia+��� ie ppp 9 ❑ M8 C =ion s - aFIE wig nc _ - ❑ a�� a Z Amm a ¢9 + a I HE € rz :s_= $ z PLOT OATS 3/5/2015 PLOT TIME 943:42 AM CAO NAME E%I a m ASBUILT AUTH NO. I NO. I DATE REVISION - Im 0205-4fi-470 0 12/11/14 ORILTNAL OWO '`* y 4618489 1 1 112/11/141 PULL FOR k PRI CBL INSTALL VISTA CABS k PMTX•S i0 SVC GULFSTREAM PARK PH 2 o L 82 � S�q /Pooq� m c 39 e4_ '� y - - Bx 'ate y Fhe g Ia o y•.0 W . or of 0 00 \ n 3i IN v zv �w 2 z =U z 4 20 \ a�a as • ®g o<o p 7 B 0CmC)o .. �omuum ro O v= F p z�3m I I I v h a 3C �x pi N m a"m'mem 1 o f3PN3C mao> n= y pa s 0 0� 2Q. Y5 Y kk 160 a O mmm Awu u a ® a a 0'. s E onm 'I8P^ m ❑ ® ® D > mcm tixm UiJv �O~ i I�II1I .^� IL�II_,'o iza4d a zo 0_ n miTAEY o i voti Cp�ouImz $m wo C Nm FRS' oc I '< < s e`�R m`'1�� r m zr yyv z0o o x\ ^ v 1 I m a' ❑ m O nOAi O A Q 5 ��p��c3�iRa mR; Q N + o'HOmo'�Zp p0�0mx�i I I < 4 ¢ R mv�n o o mm<`I N❑ o mc ylal mm ZO O U < 1'- m �l y m m W m P O mz O Z (0 mm _I m ITTz� ti D iN m n ti� DO lU �mz OA G m o m Itk O I nm C G7 �0 m zom ❑ n m m v ni m CO > m F I r to WbR °RI° I] M I - d"_"- "� ,j�,� � 2 'c51 v I I F ki"M•v_' _F.� _� 1 :�� I n m zJ 1..�11 •I I•I�x _ JE a E I aCJ �TLyE7M'F II Iii! !IIg�, }'i a `n '; g1 ± I514_I 3 --nK Z I I C 1 —=i--=__ 4F : s OWN r °tris t aAti 3�dF 6s iy$`3 /,/'/i„�� I44gVa il la .a a di E a E�a 9a o lilt x�° f? E f✓/�'�`��n�� •3 � ��@R3q�'gpSS�§aSE$�3�� n y � � I� I a a a % .0 a9i9E4EldEd AD a � i�ag @gaat m I I e x B e i "" - $34d�8� Rd3yea ap��ggi y ! 11 NIT ❑ i RE_.:.a.�_ Y 7 3'- tg'aS3i ?38'4aa I II I &5 3 �y �IIII � ! SSS @may Ie_--ge xasyd T.S9E�5§� lilt PP VV`v� i I�r_i I� E @a$�AAAAAA3S�a.€€ c E• � Ip"ip'i_ 8 8 �9�� ' d a � �'f t7 x I S' -� �• v+n i i Mfg � qs � y j ❑ - G6 ^~y-----m.���, a YqI1 �_�I-L L'T =_ =y_ "_"_ �•obn �3 gn (� i4-�} } i 13Ij FI!yg I Tr- 6t - Z21 I�_R� —I -{moi` �_���� S }! ❑ tat_ I"}: ° �J" "g Salg 4 4ii # I I5 I °tea �t'9'•Iry-� -gym E � y4�e oz f ala }� � Y� Y e1� i � ❑ YC u i =10 c i la �� �� �� qz. | `A ! q !| !n!9 ! ! 4 'm w. .� A; - .f R T 6 M ]/5/3N5 MT T11E 11 JL35 W m NWG m i - � a s mn� o n � o - _ S s � R o � 3� Qa �,=0 3 EE WOMEN -2 ®o® s a e = I s ❑ ® ❑ ® ®❑ ° ° I I R a^ z i _�.S O I 1mm1 ✓. � a A5 n o 3 a a 9 ° i Oil] m v ®® n I I x m o B a� o o a r• u �� I � Doom - m m N A ❑ AAnm � 0 oa�m f1 � 7C�Fr ao O m0 a `L pPamz I ?''o �m 3 vi ❑ Af0 ff U434 ' I ..5PP1 t as 3 1 9 _`iR € II II •dSu75 II LPPwn A05P3M I7" I I' ;! rl�al�l II x Q� • _ a' I-II " Hl� III I-- sg5 I I MSR3�!) 1111 .WSa2l) S~ e. �`�� , •III I I ?:% a`se`s F°i — Ilii€ ° is VV�� i �'- +' � R i' III Ilh'lll • 5 -III1 III 1 � 11III AORM-1 Zia $ ° J O il sRUN t Y I �1I1 j 1 1 � 1 1 d+{ I I11 ' 111�F___ " 1 111 till III F p waw ?:% a`se`s F°i — Ilii€ ° is VV�� i �'- +' � R i' III Ilh'lll • 5 -III1 III 1 � 11III AORM-1 Zia $ ° J O il O . _ Rn If g¢ II ' Y eyi9313p46 if I_pRa�Y�¢igal � I os-uie— e� I•' ����lali, I6 Iw a�,:. a s$3 e - .g •' 1 __ �.—,'- _�_ _� � __, ._ _� -� -��� ^' r'"+i,', it /- F3 O B If 99 I li I " a33°oe i i dl Y^: Yra: dY❑' .-¢,I 1 agg i eo I 4YsP� I Oi[¢! II=@j Y,gYe Gast I I I 3 }i f- Be � 311111 i ^- _ ^+.ur— � � 13 M. y v F55 Z ' g Y 2� bn �� T a g p@c� T!o- ��:d�Fii<�id:d3dai➢@ i� —3nn Rca4 l t a ?Js3ad i S3 $ � � ] � i 3Fv$ ; � ���3•��ij� � F� 5���i 4 : L 6 99?��e3€a�3is a a K 5 avgt, IMgala g3 g P a E g §g••,•e � 3'� i! 6 • 99 � � a � � a � d 6 aa^Ea — e3a I i3F I_____�� 9 AA a$ ae L—IL-----J ani �� e❑ air 1.3 ❑ as I B❑ a wil � a Geral -4 x § i \$ , z\) � Q{ 2 _: 6§� $ a •i \ : A \ i— J%\ )Op%\ )0 , \ 6 _ R !0� \ - - M P \ I : + \\ \ \ § Is 11 ;mx §R! � \ o Ci � . r\ : «_ - ` \ |- SEE_, . — - — — — - - — - - - — — — — - — — - -- §| §� c § )® ��� � | � q) �\ $& § §�/ ArLW, WE� 00 ha /| \ Epp| ;wjj �§§| - @ k� \ �••�� ; �: r ©----- - ----- - ------------------------------------ - --- ------------------------------------------------- - - — - -- ,i{i� | Cl Cl 2 2 ! PLOT DATE 3/5/2015 PLOT TIME 11:37:45 AM CAO NAME EXL ASBUILT AUTN NO. N0. I DATE REVISION e m 410907 1 3/25/0 PROVIDE SVC TO POLO RIDGE CONDOMINIUM F 4818489 1 2 01/22/15 OH/L1O CONVERSION CULFSTREAM PHASE II ra F • =S m 3#2T 13KV & #2T -N oz• K s a$25' sos COUNTY RD �3PN3C— ) '� OI SIO �N �Sm OLS/1 -E°a 'oma v OOmZNuI Nm m Iw N� I0® SB• ?Z z CO ��� lv JL"o I IO G - s m I A I ;r � ® ❑ ❑ n mo N 2Cmui--iN ��n mm y N US I [JS-INNI1jI1j����//11 f£O 00 ❑ ❑ ❑ 00 �A CNl7_CO Nc POW c A." N € y�ogo^i�z0 S m\ j £ OD a os y b 0 40 107 ED E1 Z ❑ a 0 s 0 00 J 2C Y �'F•£� E g g D O O J LJjI V O2 w ❑ 7 ❑ ❑ Z �n E5 3o a �= w :49 i a O a g 2- i o m y Z Om C Z c o Z 0 Y 4a n i9 'moo �o o a a o S �o o ❑❑ u a ❑ € E p w F ❑ ❑ ❑ N UI m I m x �T uu V O V o m N F F A LJ Z O] b r f.1 L OI z v o v A m e O n F v 275't r g TO SEA RD N OCEAN BLVD (A 1A) s s 000 ❑ z :,1 9 m m mT1 S N N mmu COU= 0 m O im 0 () D D o m .��. (cj1 W a� O`r. ER c7 m o � y0 SR AIA Z � Amy mn.. L7 N rn O s� CT ow ❑ n� Z m p c 0 (7 F I � � �7 = OD �1 I!tLCRUNE SEE RWC MgR2l3 a i 75gn a r9Qv®y -1 �I��i� as i 31 3 I S I I S � i � 111111LL ' Sul im Uzi M. P al :rr $ I p p 1 I I I o � I � I G � 1 I I a � I I {j is I= I Iw ;N jj€I 1'= I Iw eoB � ❑ 4MAµ c 0C[µ (®❑ G � � a 9 iDO e9 ;N aaj�€Ap�6t� pt ape@�Q11Q5 CDi .y. m� i i 0 0 ® "a �i�➢°45i/i Z 99 a 3 3 ®� �Jm aY�Q[pGE �i88ig —21 I tf G g a 1° § ? 3 €4qat I x'm 9p pp'S5j5i5i5 a i i F t.ik.eg�y�G4 p CC I y54[p ❑ ® e ® � s S �i�G�9�9i�p@p� I I 1 g Vv 3a'a i! i sa Ns � erp a@E pull o €9c �wuom cSNesa = IR > sF as�Rez g dA ; R € yi N^D'F z- os a 1p i4'�,JL Rp B • p O 2 ® Y ��>nM. b: b' 0 e� $ H 6 Psag SF 1 sp'����g��iqE��aa d�� e��g'������3 a G' c Q' M i 8�� PAN!, V Iga a ISS . 6 a Q'  10 rA g g 1 c C? NQ �� a o 1 y 4 Q' 1 �� y 1 I �� 1 I I r 11 I all 1, 000 all 1 ace���s��; 'V 1 gg ��qq}; 1 113 (NFg � r, - LI Q' E 6i 1 a d:b ��a m �� ,_. ���� �� gl ala �� Q' o 0 kl I i Q ^---^---------•--•---• ®— — --- f ---- ; del 9Y I Irll��j Y/a�an v[ ®ii �l%%�yi9� T;♦ �IpZp- � � VgF { �� � F➢ ; � y� I i a HP @€`N ° g II ' � pppp i { / +j-ff ssae§AA pEFa` im �i FF €P i I fl � Iv, I , I j g I , b f41 I� ; ul y I � I n++a � z m m s --------------------------- -------------------------------- ---------------------- ; 1 02, I I I I I I -- I I aap& 55 i11 IN 1 I 33CCg I � qY 813 1 gg pp I T m § €,IRE a�a!I 1 3�17�I�a3a i Aa3d�I I d;" I -------------------- __ I vow1 _ • I 'ii 1- TT t I I ❑0❑ I ° ; 2tl�P � i I II va o o i i ills e�o$y ® i y ' I I xg I Y A I I I 55� S• F § j d � Y I i � . pm 1 {� M • _ � s ;a3 Im1 r-------------- -------------- _______________1�___._____-_ __1_ 1 _______ _____—__________ ___—_—___WIENLINE SEE OWG/1tl5RIldlop gaa is as �[o '_ dC 1d 1 a 11 R t 2 �� B - - - - - - - - - - - - - - - - - - r | ||| ' --------- : � ' !- | !------- k §( �\ - - §!� . - . � _ - ;5 |.\S /! , \ � §H2 MIN| � � } x .. �••�� � �| © ,[ - - - - - / - - _ _ 5 - OWGJM1 - - - - - - -| !\M,W11 �� &2 ! � / \ 44" 4" / �` . �� , �� "MHUNE SEE . ;� - - - - - - -| �� Mk | ��� ���/l ) . ��j|/ ��. �w \ ? ! §ll U-NIN!, | )�\ TUM1111IF - -- - ---------_- - N: - - - - N &� ; ) ! .P- k N &� ; ) ! — — — — — — — — — — — — — — — — ||| r|i ', � 5 | � � � . � j| � � k � a | •!; k |!; § § `C § ;R § § § \ ! } i§( , }; $ i §j/� ! .. _ _ • f .. ! � - "-�_� — �— � -- - , 141111 1 � § /\5 .Q og ©—----- _- - \ .. - !  ___, - e�� --------- 7 ------- O�� �� ] | �� # , ||�� ! ��&, �� ��) " �� f !�� } a .a� i" \ / \.oil �| A 2 2 a � i 0111 ; /�� � 1E3 D`k -| ..r .. �� ----------- �� �� p ) , | / yp "TCH - _ __, -- ------ - - - -- - ----------- _ ~ 0 H!p /! 77 , ƒ � . � | ! � � ! h\\; � � ! ngl� WIlk d ` \ , °� ' ; . . . - , §! e| | 7 `• kq !! � n in § \ ��--- •` [! § o f Old ƒ q9 �$ rn Fl F1 \` . MAWHU"E SU zT _11 § IS 2 44 ; - � � p — 114 — — — — — — — — — � � � `51., ! ° m rnm. wssr• rur uc-.a,... a...e ,s i---------------------------- _--------------------- _------------------------------------------------------- I _____ _____ ______--3 I 777 I all ] F i 9i�iSVP➢F� j"aF I g I g g➢ �$s € gg a i� 3i➢a';!a i i ➢ij t � I � f i ' I __________________________ t ti �}i} i ' i yyp• F aifi� li ti '' ° • iilt s}'i fig i asg � "}:a ➢ IC C d' a i i 4}Pq b_al j a d a i a3a fA - i B❑O i 1 t I S I I ? I I 75 3P 9 9 I I ➢d" � a a a ata $ bo I it @.E�� a a® I i ❑ ❑ fl L ❑ ❑❑ f ' 3a . I e^ it Y 3t I C tit 1 act T11 I _ y Y1iCHUME SEE MFfAOSRYZa34 1 agEE 91 13 E> a o a ❑ a: o a"g8 �a3 a ❑ 06- •v ��''o .1i ��I MATCINRE SEE OwG/AOSRUI  j Fb I I i I 1 I aCC I PE�� 5 �� ; p a----------------;EEn� __ ix 95 ZL- I �� I i I fg i�� i 3 I _ �� sna �� ��  " C _ s�� Ee i �� ��I ba " is [  _ i�� ib g 1 13 9LP ��ypq x .0 ��jj t ��i t y 2 { " IE " _ __` ��Y z i __ i Q' i o o I � Epi;-----  -------------- __ _____ __ RIP - - - - ��------------- -E -- ----�� -- ----------- - --- ---' = ' n WTCNOHE SEE oWGIwciAosRl,n c?e��ba5 gg $��="g diAg Q' oED Aa"L _ s ' es" �� Fm I r .n - n (ur aria� ��g " LE ��'r`. i lag a x$88 a' Ill a S e�8EE�(,1FEF Is � �ga� Fj1i 111 I � 51 � 4SCa�[i8p �8 i l l I I I I gip 3 5.11 III j 9 �" 1 i y I a III j � eD III N 5------ ( IIII i .�. p a fi a §`¢fie p� [ IIII EI II •a�.sai � I.I` I �. 1 I III!i 'a I 1 � g §se 9 CIII i P P 1.1 IIItIF* i G� 3 a y}iF > s III p. f l a 111 !.1!' i :I i�l��i - !iIllt� I i i s F 3 E - A II�� j a I• i eo ap e o t4 int I.i II I„ Ij a p F t �- n C.4 suoe AD_ I j_ I _aosuae i� L , MM LL EI O ACSa1W_L!I�_ I a � - js e i aI'm Ili Pa 111. I o� I € a = assams Illi " L F p s r s.2 g—R �:e' t�3"�a 3�Rg55�py pbsaiae— I• I I •NG a ?CPf_ee}}3 Illi j L ��a I O @ >< � � _d il • Ii _ — w'.*'�i I I � I I = ao e V S g�_ f4 � � 'q aE MN.11 g x as I � _ • "l SEE OxC/MSRI39 Ins a I .se i q C^a4 �� _ _ _�� �� w----- || -  - ------------  -- ,! - \�� � �)! ]/ T )�� �)(�� �)!\ / )���/ �� .�� �� \/} �� } e g | ------------------------------------------ u j|  ------ �� {�� %R! &��F Mal ] �� ��N! )ME. ) K � \ � 7 , P m YATCHIINE SEE OWG/A05R113 ____gg_. ____ ggg - pP 66E�N5 i gR Edda°�RSp� I I Gii��4��A m i t •� 1 B3 8Y I ' 1101 I �.i; 'pill i may' i G C�C¢3• � �rA i� I S��=SS i a� 5�9• , I 49 1 6 YY a I 7i 9 f a z 41 4 o i e i$ mliw�iml �A I 1 aoo i �� 3 •�4 I 79 e.F'�• 'g— ri i "``1111 d $� Y i I $. i• 8^" 4 1 ° °° B3�r I , i i °° , � a i❑ Vim/ � P eY glea�§ �::��E�g�'"�� ❑� �_e:€ ;� �Re A4 i • g LF $�• § Eg.i 0 _____ __— -------- __ ______ _ _ __ _______ ___ _____ _ ____ _ a C g'g 4AT[HONE SEE 0WL/A05N311 6eEE FEW 55 :A b�. 39 g_;8 ❑ €a mm. F _>e: • e e`A a � a l;'�e3�� R � ? t7 ��e+x stun a❑ aE'—�Sg � All N §�. . � .SEMN 1-4:: . � | � • - \ — — — — != — — _=m_, — — . , | � � � |, �� | - | _IMa §!7| / 7 r ~=. / —�` . .TCNIINE SEE OWGaA05N21t C � : -__—----------•---. • - _---1,.—.,---_--�=ate .�--_�� --®— �- ; y@ g ejc1�•`GN aypc��SP_5c'�� n d � i - i ® ie ,R.`{" j K• �[PBBB �9 lA�l � t ' ® v � ® e R l d p@2 s I Ed.'�gg6�d��5 r i I a3"31 ,SSSaSS3 >; _� �j?EgS@pS CE tlgE� EESSS ®• �'" ; da �+ 44 Pon, lag In � S§ 4 i � I • n •�}sC?�� � p9 l a� o J, A a 's ❑❑ I i lolls,B age I u p 6 `- •i . � a ' N u • � �w9 €(n �� 5� rF� � � ' i OR i c Slag a ' 6 $ - P ❑ P my VAMC NE SEE MCIA05U42 :E= of -aa'�yas¢ S am Pm a'f's3• � 2 -1� Na•A em X33: i f oSS$p3 i • ❑ ' sm i •' �3ii Ss e n ('a BGYp ��E r i S a } aas as lf��.��je P`pv ?0 a Q'aaQ' a a i S " �� ______ ���� �� r d Q' ��5" G��^L " C psu�� � anpe�� e Q' 33 iPP S13 M 1 0 r i S a } aas as Q' as �� ,.dC a Q'aaQ' a a i S " �� ______ Ea I d Q' vvy iA a a A 8 I �� I I � anpe�� e Q' 33 S13 ��P-ZOa aO 1 0 �� " ��F �� c'v F I a i Q' Q' e B I I I z I I I I 0 IBM - 0 / ,6 w ��xe-R 42 5 I l@" ��' gi g i -t1 ��bi ' f1 rl (��" i ����g��o Y e6 @s@ 9 F � ��oil, ,.dC s ����- S " �� ______ Ea cl  _ (��" i ����g��o Y e6 @s@ u ��u���� F ��a S " �� ______ Ea cl  _ ��`��yvg3g 33 ����8 ��P-ZOa aO G�� _ wan �� " ��F �� c'v IBM - 0 F � e"��F FFC S F a " Y'nGG Sgai: WATC UHE SEE DWG/6G5a46 F ��a S -- ______ --- cl  _ C R 33 IBM - 0 L:'" -. o ase 6vE oagY;3 ,o�� F d':OY" H ��," ��''�� Q' Pd -I try Yt ID Ns Zassf ��r���� 91 MXHUYE sm pWp/Aps z e 5 WT e Inr ¢ =f tm e ❑ I 9A\ T" §;7 § ; EI 66 I f !0¢1�SASFf¢11;°1¢a�g1 m E v Ms = M z9 O a, I 5 FFFF{5fl1pE z gpyppA IN _- ' ol I gD� a �16E U -^rt uwa�� .W w 9g m a WT e Inr ¢ =f tm e ❑ I m Z T" §;7 § ; !0¢1�SASFf¢11;°1¢a�g1 m E v Ms = M z9 O a, I 5 FFFF{5fl1pE z gpyppA IN _- ' ol I gD� a �16E U -^rt uwa�� .W w 9g m a WT e Inr ¢ =f tm e ❑ I m Z §;7 § ; ; I® 66 I f ----- ____ u I I � I YATCHIINE SEE pWpflplR}Sp p 1 %af,-e3a Z 3 1 f �zl 3,8 E 9 4 f¢a o i zA t ��1 aae ®o[ t11 ❑ EI E 0!9 of A 11 EI E ']aiEi a Co0C t 86 E1 ® 8E i 7 } 5 d� . ft i fl ....INE 5E[ UWGfaG5R2a9 p T � O � a ! 1 � WT IS aIt It I . �------- d --- I n pp a[a?5'P Yd Mx -a • ff i s9 �b ij I QL i F I eta@ 9iF5iggiFg�a x>�:x"±� p,tt I a I xf 1 'R ebay 1Caj ti'�� I i= o MPI E 11 d( �� mi •` a " i til .�E y�{^�-� io -Y i F MrpJ 1 Yq iu daa]a]ajER§ yayrh:@a. OP I E' i ri 1)1 € 17 6 bC P I i gpi: a jj a�ji k VIP aoe 4' x I +j O (ix ?111 I i 4 Y g` c I Is e �Er'�jq J II I ® aE ¢ .. cR_99 I p €¢❑ '" �e a• i � y��� I s5 § . [ R � 1 a ' . ! @ YWARMUNE SEE PMG/P05RID] - �Z2 � �5 c53 vg r0 ❑ Na'S 5a x yy ddigi3' N� Iri-I16 ERS -21,1112, K k 11 , . ?- `� \Ij | lgINESIX _,--- -- -, � ® � | § j , f ❑ \Ij | lgINESIX _,--- -- -, � ® lit 10 | ! . i m }h �)) a�! \ Mill L ----�| / § �` | | � 4 ---ia z- �o� i m �)) a�! \ Mill ----�| � e ; | | � 4 ac WTCHUNE SEE DWGIADSR237 _-— -------- 1 - ae • I a I : ¢ I I I I i � � ■ I /f � 1 o /f 1 I 9 ; I �y 7 N; � ij•^ 7� I i e e E 5¢¢ ❑ej❑ii AEnp�¢ /f i { qq vs§.L A a ; &� Na i11 R g bB�yl kMr a+ + G Y 3 6Y i ij% `f a i • 9 S I - � I g a a � �----- --- ---aft------ - --1- FF MAT[NIINE SEE DWGjAD5R2S5 ' aCCC _ HSU ❑ np ��'�syf m aaa�'e � �� E nz ❑ i ave -•3 m § | � N m \ !`!! � 2 \ ■ : e . ,. � ; --------�_-- �-- _ �—���� a © � ' ■ Ogg. ! W /| �^ \m j hf o ƒ § _ �\r .c -- — — — _._ w — -- — — --- --------- ------------- -- — — - , 7(' §°J�|ƒ | a, ,[� !`® ? \} al ®v §!�&_ / 7.2. Neither the failure to make such inspection, nor the failure to discover defective workmanship, materials, or equipment, nor approval of or payment to Applicant for such Work shall prejudice the rights of FPL thereafter to correct or reject the same. 7.3. Applicant shall correct any deficiencies found with the Work, including but not limited to discrepancies that are inconsistent with FPL's design, instructions, standards or specifications within two (2) business days. If Applicant does not adequately rectify the identified deficiencies in the required timeframe, FPL may, at its sole discretion, perform, or have performed by its contractor the required repairs and Applicant shall pay FPL for any costs incurred. These requirements apply whether the discovery of deficiencies occurs while Applicant is performing its Work or while FPL, or its contractor, is performing its portion of the work. 7.4. If any Work or part thereof is covered over contrary to the requirements of this Agreement or the written request of FPL, it must, if required by FPL, be uncovered for observation and inspection and covered again at Applicant's sole expense. 7.5. If any Work that FPL has not specifically requested to observe and inspect prior to being covered has been covered, FPL may request to see such Work or part thereof and it shall be uncovered by Applicant. If such Work or part thereof is found to be in accordance with this Agreement, the cost of uncovering and covering again shall be paid by FPL. If such Work or part thereof fails to meet the requirements of this Agreement, Applicant shall pay all costs of uncovering, correcting, and covering again. 7.6. Applicant shall pay FPL for all time spent reviewing and inspecting Applicant's Work. 7.7. No electric customers shall be connected to the Underground Facilities prior to all deficiencies being rectified. 8. Indemnity / Liability of Applicant. 8.1. Subject to the provisions and limitations of Florida Statute 768.28, Applicant shall, protect, defend, indemnify and hold FPL free and unharmed from and against any liabilities whatsoever resulting from or in connection with this Agreement, the Conversion or in connection with the performance of the Work by the Applicant, its employees, Contractors or Contractor employees, whether or not such liabilities are due to or caused in whole or in part by negligence of FPL; including but not limited to payment disputes between contractor and Applicant. 8.2. Applicant shall assume full responsibility for all damages and all restoration arising in connection with the Work. Page 3 of 7 (Rev. 1023106) 9. Design. Work FPL shall provide all design, instruction, standards and specifications necessary to perform the Conversion. 10. Completion of Work and Ownership. Applicant shall complete the Work by 20 and notify FPL when said Work is complete. Upon FPL's final tten approval of the completion of the Work ("Acceptance"), Applicant acknowledges that all rights, title and interest, free and clear of all liens, in and to the Work shall vest in FPL. If requested by FPL, Applicant shall provide FPL, in a form acceptable to FPL, an affidavit of Applicant certifying payment of all indebtedness to all Contractors and a written release of liens from Applicant and each Contractor. 11. No Liability by FPL. FPL assumes no liability due to any damage, misunderstanding of installation drawings or specifications, or any actions due to Applicant or its Contractor. 12. Suspension for Cause: 12.1. FPL may at its sole discretion, by Notice, temporarily suspend the Work, or any portion thereof, under this Agreement when the performance by Applicant or its contractor is unsatisfactory by FPL to obtain the results required by this Agreement. 12.2. The methods by which Applicant performs its Work are entirely the responsibility of Applicant. FPUs right to suspend Work is intended solely to verify that the Work being performed by Applicant and its Contractor conforms to the design, instruction, standards and specifications and shall not obligate FPL to review the efficiency, adequacy or safety of Applicant's or its Contractors methods or means of operation or construction. 12.3. Any additional costs incurred by Applicant resulting from such suspension shall be borne solely by Applicant. 12.4. If Applicant immediately corrects the unsatisfactory condition FPL shall authorize resumption of the Work. Applicant's failure to immediately effect correction of the unsatisfactory conditions shall be cause for termination of this Agreement. 13. Termination for Cause: 13.1. FPL may, upon Notice to Applicant, and without prejudice to any remedy available to FPL under law, in equity or under this Agreement, teinvnate the whole or any part of this Agreement for cause and take possession of the Work without termination charge, penalty or obligation in the event Applicant fails to perform a material obligation under this Agreement and fails to cure such material obligation default within a reasonable period of time, but in no event more than ten (10) business days, after Notice from FPL specifying the nature of such default (any such termination referred to as a "Termination for Cause"). Page 4 of 7 (Rev. 1023/06) 13.2. In the event of Termination for Cause by FPL, Applicant shall: a. Unlessinstructed otherwise in the Notice, immediately stop all Work hereunder, b. Issue no further contracts except with the prior written consent of FPL; C. Assign to FPL, to the extent requested by FPL, all rights of Applicant under contracts outstanding; d. Terminate, to the extent requested by FPL, outstanding contracts; e. Fully cooperate and refrain from hindering or interfering in any manner with any other persons or parties currently or prospectively performing the Work; and f. Take any other action toward termination, or toward preservation of the Work, that FPL may direct. 13.3. Upon a Termination for Cause, all obligations of FPL hereunder shall terminate effective immediately. Upon such Termination for Cause, FPL may either rework or take over the terminated Work and proceed to provide such materials, supplies, equipment and labor of both FPL and FPL contractors, as may be reasonably necessary to complete said Work. FPL may have any partially fabricated portion of the Work removed from Applicant's or contractor's facilities upon Notice to Applicant. Applicant shall be liable for any increase of FPL's costs, including rework costs, incurred by FPL as a result of FPL's termination of the contract for cause. 13.4. In the event of Termination for Cause, FPL shall have no liability to Applicant for costs incurred by Applicant as a result of such termination. 14. Termination Prior to Construction. Applicant may terminate this Agreement at any time prior to the start of construction. If Applicant elects to still complete the Conversion, then the Contribution -In -Aid -of -Construction (CIRC) amount provided in the Conversion Agreement shall be revised accordingly. The revised Conversion Agreement must be executed and any additional CIAC due received by FPL prior to the start of construction. 15. Assignment. This Agreement is not assignable. 16. Applicant's Payments to FPL. Any monies that are owed by Applicant to FPL under this Agreement shall be paid to FPL within thirty (30) days of FPL producing an invoice. 17. Notice. As used herein, the term "Notice" shall mean any formal written correspondence providing notice of action, purpose, intent or the like given under the provisions of this Agreement. Unless otherwise provided in this Agreement, Notice shall be delivered in Page 5 of 7 (Rev. 1023/06) person, by courier.or by certified mail and shall be effective when received. General correspondence is not categorized as Notice. Page 6 of 7 (Rev. 10/13/06) IN WITNESS WHEREOF, FPL and Applicant have executed this Agreement for the provision of Applicant -Installed facilities to be effective as of the date first above written. For TOWN OF GULF STREAM By: ( ignature) Nam , cott W,organ v \ (print or type) Title: Mayor (print or type) By:�- (slgnIre) Name: William H. Thrasher (print or type) J Title: Town Manager //vim (print or type) Approved as to Terms and Conditions: (signature/tit ) Approved as to Form and Legal Sufficiency: �1 (signature/title) For FLORIDA POWER & LIGHT COMPANY In IN (signature) (print or type) (print or type) Page 7 of 7 (Rev. 1023/06) Exhibit A WR # 4618489 Work to be Performed: Applicant shall: • Install all conduit and concrete products based on the attached specifications and in the locations as indicated on the attached drawings. • Install cable, transformers and switch pads and equipment make-up including primary and secondary terminations and connections. Exhibit B WR # 4618489 Standards and Specifications