HomeMy Public PortalAbout10-0422 McGees
45•6, City of a Island • Community Develop Cent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. 1 D - Q �1 2-2- Date Requested
Owner's Name G (-))
Gen. Contractor
INTERNATIONAL
CODE COUNCIL'
MEMBER
Date Deeded
Subcontractor
Co tact Information r►. C
Project Address 410 ''\ /t `4-J,
S e of Work Qv oo r c/Jj eli d o -tJ rei
Inspector -1 ! TA Date of Inspection
Inspection 13(, -+ Pass
ss
Fee
Inspection Pass Fail Fee
Inspection Pass El Fail El Fee
Inspection Pass r Fail ❑ Fee
Dianne Otto
From:
Sent:
To:
Subject:
Attachments:
Todd,
Dianne Otto
Wednesday, August 18, 2010 4:54 PM
' todd.mcgee @verisonwireless.com'
FW: Application - Outdoor Shower
Bldg Permit App - Shower.pdf
,d '10 s)
Ac 67:. r‘ -.\- °\,,, ,
cr e,,i‘ci r, r
k-°- L
' e'
--Y
The permit for the outdoor shower with enclosure is ready to be picked up. The fee is $50. Our
water /sewer department denied the request to tie a drain for the shower into the sewer line because
of the potential of stormwater getting into the sewer system, which is prohibited.
Sincerely,
Dianne K. Otto, CFM
City of Tybee Island
phone 912.786.4573 ext. 136
fax 912.786.9539
From: Todd. McGee @VerizonWireless.com [ mailto: Todd.McGee @VerizonWireless.com]
Sent: Wednesday, August 18, 2010 11:37 AM
To: Dianne Otto
Subject: Application - Outdoor Shower
Ms. Otto,
Attached is the application and drawing I mentioned. I think I have included everything needed, if not please
e -mail or call me at 404 - 276 -6695.
1 will be doing the woodwork myself, which will be fairly simple but adding a little privacy. I will hire a plumber
for the mechanical. If it is not acceptable to attach the drain to existing plumbing /sewer line located very
close to that structure (the laundry room is right up above this area in the house), then I will let it drain to the
yard. With that additional drainage for the small wall by the pool, I was just thinking that if I could eliminate
this drainage from the shower by going into the existing line, that would be preferred.
Thank you.
Todd
«Bldg Permit App - Shower.pdf»
1
DATE ISSUED: 08 -18 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
OUTDOOR SHOWER W /ENCLOSURE
13 EIGHTEENTH ST.
TODD MC GEE
2560 GOODRICK LN
CUMMING GA 30041
TODD MC GEE
2560 GOODRICK LN
CUMMING GA 30041
P
$ 50.00
$ 200.00
PERMIT #: 100422
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
OtelAnA--e—)
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: /3 /$' rff
NAME
ADDRESS
PIN #
ELEPHONE
Owner
7 t>b M Get -
13 'ern' 3-774-61-
f074.-661S
Architect
or Engineer
�/�
Building
Contractor
A ,1t
e'
(Check all that apply)
E Repair
E Renovation
Minor Addition
Substantial Addition
Other
C
C
[Residential
E Single Family
❑ Duplex
❑ Multi - Family
El Commercial
(l Footprint Changes
L Discovery
E Demolition
Details of Project: ,,4dd 6a44 door did,&. cr 014_' ex s--/-61
raired S-fruC-+wvt. cfr 4/c- un,-fs (s- a, Pack d /&*01,1
Estimated Cost of Construction: $ 4260
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
A COPY OF THE CERTIFIED ELEVATION SURVEY OF L
following info on based on the construction drawings and site p
# Units # Bedrooms
Lot Area ing space (tot q. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) ith culvert?
and complete the
# Bathrooms
Setbacks: Front Rear
With swale?
(L)—
(R)
# Stories eight Vertical distance measured from the average adjacent
grade of the bu s ing to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided
Construction debris will be disposed by tirog i1`
AD/1,44,01W-
by 4,X4 — Vey .
by means of latbajt, 6414 be. vei'y
4,94,14,14,4 takr44))
1 understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 8/l el io Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certificatio
Approved rezoning/ arianee?
Street address and n 'bet.: New
Is it in compliance wi City map?
If not, has street name d/or number been reported to M
NFIP Floo ' ` one
FEMA Certification attach
State Energy Code Affidavit . ttached
Utilities and Public Works:
Describe any unusual finding(s)
E ' ting
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
ire 1 Administr o
Code EnforcemeOffice
Water /Sewer
Storm/Drainage
Inspections
City Manager
S' . nature
■OP
�,�/✓11i.1/
Date
/D
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
�• 75.6•0
Printed Name
Date
s-hs-ito
Office Use Only: .
Project Address:
Permit Number:
15 ft.
r_ Property 1( e
Vor
w,
(appreeX
EY, i s'fi,, G.
P6 P er,i4
4. -- Propertu awe
1 s+.1
P+/c u r-ts ;
r ,m w ca. -r
Q rtr o-4- so
1/‘ e vier-.
� os C�to�n�e
SGk, +10,, a ' males frleqed
Wck 01.0-66r sh ^ k.r d.t,/A?/411 n
�\ �G�s�r1� �jt r � EXi!`f i ;f frcc&)
oss by ('see.. • othoLe
3� e,,' c1PSe ,pace far ,trw.G. y (i e te>0 )