Loading...
HomeMy Public PortalAboutHarvel Utility Construction, Inc.HARVEL UTILITY CONST., INC. DELRAY BEACH, FLORIDA 270 N. E. 16 TH STREET 33444 PHONE (561) 276-5557 Town of Gulf Stream January 24, 2002 100 Sea Road Gulf Stream, Fl. 33483 Attn: Town Manager Harvel Utility Construction has been performing utility service, including water meter reading, emergency repairs and the installation of new infrastructure for the Town of Gulf Stream for many years and has an extensive knowledge of the Towns utility system. This means we can do the Town's utility work quicker, with fewer problems and less impact on the residents. We have made every effort to keep costs down and quality high. We have in place a communication system of radios, pagers and cell phones that makes it possible to respond to your needs usually within one hour, twenty four hours a day seven days a week. Because H.U.C. owns its own maintenance equipment we are able to provide this service quickly and on an hourly basis. In our local storage yard we stock most of the repair parts and equipment including a Backhoe Loader, small pumps, etc. to perform maintenance around the clock on all of the towns piping except for the canal crossing. H.U.C. has bad a good relationship with the Town and it's residents for many years and has made every effort to reduce the impact of utility maintenance on the residents. Following rates are for utility maintenance and construction for the Town of Gulf Stream. The rates reflect a 3%+ or - decrease over our existing rates which went into effect on October 1,2001. These rates will be in effect for two years and include the following two changes. Change #1 - My labor cost will be included at no additional charge in the hourly rate for items #1 and 2 when the scope of work requires my supervision. Change #2 - My time at meetings to discuss future Town projects will be at no charge. Yours Very Truly, Harvel Const., Inc. Earl Harvel, Pres. ~ MARVEL UTILITY CONST., INC. DELRAY BEACH, FLORIDA 270 N. E. 16 TH STREET 33444 PHONE (561) 276-5557 January 24,2002 Page 1 of 2 Rate Change for Utility Maintenance and Construction The following rates are to perform repair, maintenance and new construction work for the Town of Gulf Stream on a 24 hr. basis. Charges for work performed during regular working hours defined as 8:00 A.M. to 4:30 P.M. Monday through Friday will be in accordance with the following schedule. Overtime and Town recognized holidays will be at time and one half for items # 1,2,3 and 8. Item # 1 Two Man Crew Including Myself When Req. $ 102.00 Per. Hr. W/ Truck & Hand Tools 2 Three Man Crew Including Myself When Req. $ 148.00 Per. Hr. W/Truck & Hand Tools 3 Additional Personnel When Req. $ 23.50 Per. Hr. 4 Backhoe / Loader $ 73.50 Per. Hr. 5 2" Pump W / hoses $ 8.00 Per. Hr. 6 Gas Pipe Saw $ 15.00 Per. Hr. 7 Small Gas Compactor $ 14.50 Per. Hr. 8 Myself working in an advisory capacity including, but not limited to checking plans for water services, conferences with developers and engineers regarding water service design and field work. :1T $ 57.50 Per. Hr. HARVEL UTILITY CONST., INC. DELRAY BEACH, FLORIDA 270 N. E. 16 TH STREET 33444 PHONE (561) 276-5557 January 24,2002 Page 2 of 2 Rate Changes Cont. Any equipment required other than above will be charged at the prevailing rental rate plus 30% for such equipment. Material required will be obtained by us and charged at cost plus 30%. For work requiring use of equipment, rental will be for working time plus travel. Yours Very Truly, Harvel Utility Const., Inc. Earl Harvel , Pres. TOWN OF GULF STREAM Harvel Utilities Contracted Labor Rate Yearly Comparison As of 1/25/2002 Cumulative % Increase Since 1996: 1996 1997 3.75% 1998 3.68% 1999 3.71% Rate $ Rate $ % Increase Rate $ % Increase Rate $ % Increase Earl's Hourly Rate $45.54 $48.27 5.99% $50.20 4.00% $53.21 6.00% 2 Man Hourly Rate $81.12 $85.99 6.00% $89.43 4.00%° $94.80 6.00% 3 Man Hourly Rate $117.52 $124.57 6.00% $129.55 4.00% $137.23 5.93% 2000 2001 2002 Rate $ % Increase Rate $ % Increase Rate $ % Increase Earl's Hourly Rate $55.34 4.00% $56.45 2.01% $57.50 1.86% 2 Man Hourly Rate $98.59 4.00% $100.56 2.00% $102.00 1.43% 3 Man Hourly Rale $142.72 4.00% $145.57 2.00% $148.00 1.67% Cumulative % Increase Since 1996: Average Earl's Hourly Rate 25.26% 3.75% 2 Man Hourly Rate 25.74% 3.68% 3 Man Hourly Rate 25.94% 3.71%