Loading...
HomeMy Public PortalAbout10-0426 North Beach Bar and GrillDATE ISSUED: 08 -19 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL FENCE - TIKI BAR 33 MEDDIN DR NORTH BEACH BAR AND GRILL LLC PO BOX 2842 TYBEE ISLAND GA 31328 -2842 912 - 786 -9003 NORTH BEACH BAR AND GRILL LLC PO BOX 2842 TYBEE ISLAND GA 31328 -2842 P $ 0.00 $ 200.00 PERMIT #: 100426 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Io -oL2, CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: Th � s 1. k 42.tu,M3 be, PIN # NAME ADDRESS TELEPHONE Owner b 1-; �► 60 .&I) b Skit -7.0P14 £#t\h4", i ►� 0 g I# O% ha Architect or Engineer Building Contractor (Check all that apply) ❑ Repair ❑ Renovation [V' Minor Addition ❑ Substantial Addition ❑ Other Details of Project: ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi - Family ❑ Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition Alpo -✓ ncc- Ctez (Aobi L 61A-v 4-e) 60149Ay. Estimated Cost of Construction: $ o206 r Const ction Type (1) Wiod Frame (2) Woad & Masonry (3) Bric Veneer Proposed se: Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry (6) Other (please specify) ATTACH A IP ' OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following info a ion based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street par ing sp . ces Trees located listed o site plan Access: Driveway (f) With culvert? With swale? Setbacks: F •nt Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of th building to the extrem high point of the building, exclusive of chimneys, heating units, vent' ation ducts, air condition g units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by o .» J / by mans of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: g, l`j, 2DlO Signature of Applican : Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Date FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL 3.2? 5 0 F 4 T GUY WIRE (Ty i4 U 5 0.00 0000 D.N.R. , LANDWARD OE OF DUNE .0,, . -,-.- - - ' &� _ 18' INGR S� EGR ESS BS�-M„� E" � � -- -- IC 'C �.. .. :TR -� f �' L •/'' ,/' Z,. ---- � - ""�rrr r c= y --- �.� NG BUMPER BLOCKS 3 ■` ,,.� f •,..,, , M.P. ''�. ►�,, s,� D.N.R. LANDWARD TOE OF DUNE WOOD FENCE PARKING BUMPER BLOCI -- ffs■ ■1�uNRro fr 0 00 R (Z� `,;r R. SN 1\4N �1NE