HomeMy Public PortalAbout1965.10.16 Survey of Airport Development CostsSURVEY OF AIRPORT DEVELOPMENT COSTS
1966 - 1969
Conducted by: AOC — AAAE NASAO
NAME OF AIRPORT
LOCATION
_
1 is
Keep this copy for file;
refer to worksheet on
other side of this page.
1. Is this airport existing
(CITY )
/ 7
(COUNTY) (STATE)
or proposed
2. Actual, or estimated, number of landings and takeoffs during 1964 by:
Air carrier
Air taxi
Military Business aircraft
Other General Aviation .
3. During the last five years (1960 thru 1964) what was the total cost*
of all airport development projects
a. Of this amount: how much was contributed by Federal Gov't
b. Of this amount: how much was contributed by the State
c. Of this amount: how much was spent for terminal bldg. construction
('' Include all capital improvements; do not include costs of operating and maintaining the airport or purchasing field
equipment, fire trucks, etc.)
4. FUNDS NEEDED TO BUILD OR IMPROVE THE AIRPORT DURING THE NEXT FOUR YEARS:
1966 1967 1968 1969 TOTAL
a. COSTS OF ACQUIRING
LAND (See Note 1)
b. COST OF DEVELOP-
ING LANDING AREA
(Note 2)
c. COST FOR NEW RUN-
WAY & TAXIWAY
LIGHTING
d. COST OF NEW
SERVICE BUILDINGS
(Note 3)
SUB -TOTAL
(Items a thru d)
e. COST FOR OTHER
IMPROVEMENTS
(Note 4)
TOTALS
(Items a thru e)
, A
ss.
t TOTAL adding across the columns should equal TOTAL adding down.
NOTE 1: Include all costs to acquire land needed for: airport expansion, landing aids, approach
protection, noise buffer zones; also costs of air rights or land easements.
NOTE 2: List all costs, including site preparation (clearing, draining, filling, grading, etc.),
sodding, paving or resurfacing, to build or improve landing strips, runways, taxiways,
loading and parking aprons.
NOTE 3: List all costs for buildings needed to house field maintenance equipment, and/or
crash fire -rescue vehicles.
NOTE 4: Include all improvements not eligible for federal aid, for example: terminal- bldgs.,
cargo bldgs., hangars, auto parking areas, access roads, etc.
5. FUNDS AVAILABLE OR ANTICIPATED FROM ALL SOURCES, EXCEPT FEDERAL AND
STATE, TO. ACCOMPLISH THE ABOVE DEVELOPMENT PROJECTS IN THE NEXT FOUR,
YEARS:
•
1966 1967 1OS 1OO 'PITTA T
WORKSHEET
Survey of Airport Development .Costs
This form (on white and yellow copies of survey form only) may be used as worksheet for figuring costs
of airport development. List under the applicable year and opposite items shown in the left hand column,
the cost of proposed development (include cost of engineering, administrative, etc., costs).
COSTS OF ACQUIRING LAND, EASEMENTS, OR AIR RIGHTS FOR:
New Airport Site
Airport Expansion
Approach Protection
(Clear Zones) -
Approach Lights
Other
TOTAL
1966 1967 1968 1969 TOTAL
(Transfer the totals to Line 4a of the Survey Form)
COSTS OF DEVELOPING THE LANDING AREA:
Site Preparation
Obstruction Removal
Paving or Resurfacing:
Runways
Taxiways
Landing Strips
(Sodding)
Loading Ramps and
Parking Aprons
Entrance & Service Roads
TOTAL
(Transfer the totals to Line 4b of the Survey Form)
COSTS OF LIGHTING AND RELATED ELECTRICAL WORK FOR:
Runways
(or Landing Strips)
Taxiways
Aprons and Ramps
Obstruction Lights
Other
TOTAL
(Transfer the totals to Line 4c of the SurveyForm)'
COSTS OF NEW SERVICE BUILDINGS TO HOUSE:
Field Maintenance
Equipment
Crash Fire -Rescue
Vehicles
TOTAL
(Transfer the totals to Line 4d of the Survey Form)