Date: I March 15, 2016
TO:
ATTN: William
Phone
Fax Phone 561-737-0188
Number of pages including cover 12
FROM:
Jennifer Breier
Phone
(954)975-0098
Fax Phone
(984) 975 9718
REMARKS: ❑ Urgent ❑ As re uested X Reply ASAP ❑ Please Re I
Please fax or email help@shenandoahconstruction.com, the first page of the
proposal. (see signature page attached)
Thank You,
Jennifer
>s Transmission Report
DateMme 03-15-2016 08:41:18
Local ID 1 5617370188
Transmit Header Text
Local Name 1
This document : Confirmed
(reduced sample and details below)
Document size : 8.5"x11 "
.r :T
03-1V18 07:30 FRM-
Fax
T-322 F15001/0002 F-252
SI3ENANDQAH
CONSTRUCTION
ISa8 N.W.22"Sheet • Pompano Denali. FL 33069
(9541 975-0098 Fax: (954) 915-9718
Data I Much 15 2016
Number of pKesincludi rover 2
REMARKS: D UrRcRt ❑ As requested X ReplyASAP ❑ Plea6e
Please fax or email he1p®shenandoahconstruction.com, the fust page of the
proposal. (see signature page attached)
Thank You,
Jennifer
Total Pages Scanned: 2 Total Panes Cnnftrrnprl • i
No.
lJob
I Remote Station
startTime
Duration
Pages
InaMode
Job Type
Results
001
847
19549759718
08:40:0703-15-2016
00:00:35
2/2
1
EC
IHS
JCP21600
Abbreviations:
H5: Host send PL: Palled local MP: Mailbox print CP: Completed T5: Terminated by system
HR: Host receive PR: Polled remote RP: Report FA: Fail G3: Group
W5: Waiting send MS: Mailbox save FF: Fax Forward TU: Terminated by user EC: Error Correct
ISHENANDOAHI
Page
Iof2
CONSTRUCTION
1888 N.W. 22v4 Street • Pompano Beach, FL 33069
(954) 975-0098 Fax: (954) 975-9710
DATE: February 24, 2016 PROPOSAL #P2307
SUBMITTED TO: Gulf Stream, Town of
STREET: 100 Sea Rd. Gulf Stream FI.
33483-7427
CITY, STATE & ZIP: Gulf Stream, 0
PHONE: (561)276-5116
FAX: (561) 737-0188
EMAIL: bihrasher@gulf-stream.org
JOB NAME: Sub Basin 4
ATTENTION: Bill Thrasher
We propose to furnish a crew and all necessary equipment to clean drainage pipe per highlighted map, remove MH top slab
and install tide -flex internal valve into OF pipe. Install 12" overflow port into adjacent CB 26, reinstall top slab with new MH ring
and cover, at the above mentioned job location. This work will be performed at our following hourly and/or unit prices:
14 Med. Clean15" Pipe
15 Med. Clean 18" Pipe
22 Med. Clean 24" Pipe
26 Med. Clean 30" Pipe
116" Hd Pump
204 Forman
206 Laborer
214 Backhoe Loader
205 Equipment Operator
234 Material & 10% MU (TideFlex Valve, Ring &
Cover, mise mat., Disposal)
(at $1.00 LF)
1150 LF
$1,150.00
(at $1.00 LF)
550 LF
$550.00
(at $1.00 LF)
225 LF
$225.00
(at $2.50 LF)
300 LF
$750.00
(at $10.00 Per Hour)
30 hour(s)
$300.00
(at $55.00 Per Hour)
40 hour(s)
$2,200.00
(at $40.00 Per Hour)
60 hour(s)
$2,400.00
(at $10.00 Per Hour)
20 hour(s)
$200.00
(at $120.00 Per Hour)
20 hour(s)
$2,400.00
(at $12,430.00 Fixed Cost)
1 Fixed
$12,430.00
Estimated Total: $22,605.00
This Proposal offers the Piggy Back of our current Collier County Contract # 15-6363 Storm Drain Maintenance. Allow 4-5
weeks for material.
NOTE: This proposal includes removal of all loose debris from the structures and pipes (excluding hazardous waste), if non-
hazardous contaminated liquids or soils are encountered, such as oil, gas, fuel, hydraulic oil, etc., the customer will be required to
have the material analyzed, by an approved lab, then approved by a disposal facility, prior to Shenandoah transporting and disposing
of the material, additional cost for specialty hauling and disposal will be applied to the invoice, along with documented receipt.
However, we are not responsible for problems occurring during or after cleaning due to pre-existing condition, original installation
or design.
SIGNATURE:
SHENANDOAH
CONSTRUCTION
1888 N.W. 22 n° Street • Pompano Beach, FL 33069
(954) 975-0098 Fa:: (954) 975-9718
SHENANDOAH GENERAL CONSTRUCTION CO.
Danny DiMum
Page 2 of 2
TITLE DATE
Estimator 02/24/2016
ACCEPTANCE OF PROPOSAL / SIGN & RETURN
The above prices, specification and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. I I.
SIGNATURE:
COMPANY NAME: DATE:
REPRESENTATIVE: TITLE:
SHENANDOAH
CONSTRUCTION
1888 N.W. 22v° Street • Pompano Beach, FL 33069
(954) 975-0098 Fax: (954) 975-9718
DATE: February 24, 2016
SUBMITTED TO: Gulf Stream, Town of
STREET: 100 Sea Rd. Gulf Stream FI.
33483-7427
CITY, STATE & ZIP: Gulf Stream, 0
PHONE: (561)276-5116
FAX: (561) 737-0188
EMAIL: bthrasher@gulf-stream.org
JOB NAME: Sub Basin 4
ATTENTION: Bill Thrasher
Page i of 2
PROPOSAL #P2307
We propose to furnish a crew and all necessary equipment to clean drainage pipe per highlighted map, remove MH top slab
and install tide -flex internal valve into OF pipe. Install 12" overflow port into adjacent CB 26, reinstall tap slab with new MH ring
and cover, at the above mentioned job location. This work will be performed at our following hourly and/or unit prices:
14 Med. Cleanly" Pipe
15 Med. Clean 18" Pipe
22 Med. Clean 24" Pipe
26 Med. Clean 30" Pipe
116" Hd Pump
204 Forman
206 Laborer
214 Backhoe Loader
205 Equipment Operator
234 Material & 10% MU (TideFlex Valve, Ring &
Cover, misc mat., Disposal)
(at $I.00LF)
1150 LF
$1,150.00
(at $1.00 LF)
550 LF
$550.00
(at $1.00 LF)
225 LF
$225.00
(at $2.50 LF)
300 LF
$750.00
(at $10.00 Per Hour)
30 hour(s)
$300.00
(at $55.00 Per Hour)
40 hour(s)
$2,200.00
(at $40.00 Per Hour)
60 hour(s)
$2,400.00
(at $10.00 Per Hour)
20 hour(s)
$200.00
(at $120.00 Per Hour)
20 hour(s)
$2,400.00
(at $12,430.00 Fixed Cost)
I Fixed
$12,430.00
Estimated Total: $22,605.00
This Proposal offers the Piggy Back of our current Collier County Contract # 15-6363 Storrs Drain Maintenance. Allow 4-5
weeks for material.
NOTE: This proposal includes removal of all loose debris from the structures and pipes (excluding hazardous waste), if non-
hazardous contaminated liquids or soils are encountered, such as oil, gas, fuel, hydraulic oil, etc., the customer will be required to
have the material analyzed, by an approved lab, then approved by a disposal facility, prior to Shenandoah transporting and disposing
of the material, additional cost for specialty hauling and disposal will be applied to the invoice, along with documented receipt.
However, we are not responsible for problems occurring during or after cleaning due to pre-existing condition, original installation
or design.