Loading...
HomeMy Public PortalAboutShenandoah Construction08:20:0503-15-]016 1 A3-15-'16 16 07:30 FROM - T -322 P0001/0002 F-252 S H E N A N D 0 A H n nTyr 0mn TT ll T T TT 1888 N.W . 22"' Street • pompano Beach, FL 33069 (954) 975-0098 Fax: (954) 975-9718 Date: I March 15, 2016 TO: ATTN: William Phone Fax Phone 561-737-0188 Number of pages including cover 12 FROM: Jennifer Breier Phone (954)975-0098 Fax Phone (984) 975 9718 REMARKS: ❑ Urgent ❑ As re uested X Reply ASAP ❑ Please Re I Please fax or email help@shenandoahconstruction.com, the first page of the proposal. (see signature page attached) Thank You, Jennifer >s Transmission Report DateMme 03-15-2016 08:41:18 Local ID 1 5617370188 Transmit Header Text Local Name 1 This document : Confirmed (reduced sample and details below) Document size : 8.5"x11 " .r :T 03-1V18 07:30 FRM- Fax T-322 F15001/0002 F-252 SI3ENANDQAH CONSTRUCTION ISa8 N.W.22"Sheet • Pompano Denali. FL 33069 (9541 975-0098 Fax: (954) 915-9718 Data I Much 15 2016 Number of pKesincludi rover 2 REMARKS: D UrRcRt ❑ As requested X ReplyASAP ❑ Plea6e Please fax or email he1p®shenandoahconstruction.com, the fust page of the proposal. (see signature page attached) Thank You, Jennifer Total Pages Scanned: 2 Total Panes Cnnftrrnprl • i No. lJob I Remote Station startTime Duration Pages InaMode Job Type Results 001 847 19549759718 08:40:0703-15-2016 00:00:35 2/2 1 EC IHS JCP21600 Abbreviations: H5: Host send PL: Palled local MP: Mailbox print CP: Completed T5: Terminated by system HR: Host receive PR: Polled remote RP: Report FA: Fail G3: Group W5: Waiting send MS: Mailbox save FF: Fax Forward TU: Terminated by user EC: Error Correct ISHENANDOAHI Page Iof2 CONSTRUCTION 1888 N.W. 22v4 Street • Pompano Beach, FL 33069 (954) 975-0098 Fax: (954) 975-9710 DATE: February 24, 2016 PROPOSAL #P2307 SUBMITTED TO: Gulf Stream, Town of STREET: 100 Sea Rd. Gulf Stream FI. 33483-7427 CITY, STATE & ZIP: Gulf Stream, 0 PHONE: (561)276-5116 FAX: (561) 737-0188 EMAIL: bihrasher@gulf-stream.org JOB NAME: Sub Basin 4 ATTENTION: Bill Thrasher We propose to furnish a crew and all necessary equipment to clean drainage pipe per highlighted map, remove MH top slab and install tide -flex internal valve into OF pipe. Install 12" overflow port into adjacent CB 26, reinstall top slab with new MH ring and cover, at the above mentioned job location. This work will be performed at our following hourly and/or unit prices: 14 Med. Clean15" Pipe 15 Med. Clean 18" Pipe 22 Med. Clean 24" Pipe 26 Med. Clean 30" Pipe 116" Hd Pump 204 Forman 206 Laborer 214 Backhoe Loader 205 Equipment Operator 234 Material & 10% MU (TideFlex Valve, Ring & Cover, mise mat., Disposal) (at $1.00 LF) 1150 LF $1,150.00 (at $1.00 LF) 550 LF $550.00 (at $1.00 LF) 225 LF $225.00 (at $2.50 LF) 300 LF $750.00 (at $10.00 Per Hour) 30 hour(s) $300.00 (at $55.00 Per Hour) 40 hour(s) $2,200.00 (at $40.00 Per Hour) 60 hour(s) $2,400.00 (at $10.00 Per Hour) 20 hour(s) $200.00 (at $120.00 Per Hour) 20 hour(s) $2,400.00 (at $12,430.00 Fixed Cost) 1 Fixed $12,430.00 Estimated Total: $22,605.00 This Proposal offers the Piggy Back of our current Collier County Contract # 15-6363 Storm Drain Maintenance. Allow 4-5 weeks for material. NOTE: This proposal includes removal of all loose debris from the structures and pipes (excluding hazardous waste), if non- hazardous contaminated liquids or soils are encountered, such as oil, gas, fuel, hydraulic oil, etc., the customer will be required to have the material analyzed, by an approved lab, then approved by a disposal facility, prior to Shenandoah transporting and disposing of the material, additional cost for specialty hauling and disposal will be applied to the invoice, along with documented receipt. However, we are not responsible for problems occurring during or after cleaning due to pre-existing condition, original installation or design. SIGNATURE: SHENANDOAH CONSTRUCTION 1888 N.W. 22 n° Street • Pompano Beach, FL 33069 (954) 975-0098 Fa:: (954) 975-9718 SHENANDOAH GENERAL CONSTRUCTION CO. Danny DiMum Page 2 of 2 TITLE DATE Estimator 02/24/2016 ACCEPTANCE OF PROPOSAL / SIGN & RETURN The above prices, specification and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. I I. SIGNATURE: COMPANY NAME: DATE: REPRESENTATIVE: TITLE: SHENANDOAH CONSTRUCTION 1888 N.W. 22v° Street • Pompano Beach, FL 33069 (954) 975-0098 Fax: (954) 975-9718 DATE: February 24, 2016 SUBMITTED TO: Gulf Stream, Town of STREET: 100 Sea Rd. Gulf Stream FI. 33483-7427 CITY, STATE & ZIP: Gulf Stream, 0 PHONE: (561)276-5116 FAX: (561) 737-0188 EMAIL: bthrasher@gulf-stream.org JOB NAME: Sub Basin 4 ATTENTION: Bill Thrasher Page i of 2 PROPOSAL #P2307 We propose to furnish a crew and all necessary equipment to clean drainage pipe per highlighted map, remove MH top slab and install tide -flex internal valve into OF pipe. Install 12" overflow port into adjacent CB 26, reinstall tap slab with new MH ring and cover, at the above mentioned job location. This work will be performed at our following hourly and/or unit prices: 14 Med. Cleanly" Pipe 15 Med. Clean 18" Pipe 22 Med. Clean 24" Pipe 26 Med. Clean 30" Pipe 116" Hd Pump 204 Forman 206 Laborer 214 Backhoe Loader 205 Equipment Operator 234 Material & 10% MU (TideFlex Valve, Ring & Cover, misc mat., Disposal) (at $I.00LF) 1150 LF $1,150.00 (at $1.00 LF) 550 LF $550.00 (at $1.00 LF) 225 LF $225.00 (at $2.50 LF) 300 LF $750.00 (at $10.00 Per Hour) 30 hour(s) $300.00 (at $55.00 Per Hour) 40 hour(s) $2,200.00 (at $40.00 Per Hour) 60 hour(s) $2,400.00 (at $10.00 Per Hour) 20 hour(s) $200.00 (at $120.00 Per Hour) 20 hour(s) $2,400.00 (at $12,430.00 Fixed Cost) I Fixed $12,430.00 Estimated Total: $22,605.00 This Proposal offers the Piggy Back of our current Collier County Contract # 15-6363 Storrs Drain Maintenance. Allow 4-5 weeks for material. NOTE: This proposal includes removal of all loose debris from the structures and pipes (excluding hazardous waste), if non- hazardous contaminated liquids or soils are encountered, such as oil, gas, fuel, hydraulic oil, etc., the customer will be required to have the material analyzed, by an approved lab, then approved by a disposal facility, prior to Shenandoah transporting and disposing of the material, additional cost for specialty hauling and disposal will be applied to the invoice, along with documented receipt. However, we are not responsible for problems occurring during or after cleaning due to pre-existing condition, original installation or design.