Loading...
HomeMy Public PortalAbout10-0440 TroutCity of bee Island • Community Develd lent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 1 INTERNATIONAL CODE COUNCIL MEMBER f / Permit No. f,' ' f Date Requested -/2Z `. f Owner's Name ? ) Date Needed Jf ',/,( Gen. Contractor / : /... C)i Subcontractor Contact Information !"7 ,f6 C72 -0 7 15 Project Address / C71 ,p%d, /�f ;c' Scope of Work '� 72 ( k _)1) _ 14141 ta -, ), Inspector Date of Inspection / A-4 Inspection �_� ;� Pass ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 09 -2 -2010 WORK DESCRIPTION WORK LOCATION CITY OF TYBEE ISLAND BUILDING PERMIT REPLACE 2 WOODEN WALKWAYS 1417 MILLER AVE OWNER NAME EDWARD TROUT ADDRESS PO BOX 2324 CITY, ST, ZIP TYBEE ISLAND GA 31328 -2324 PHONE NUMBER CONTRACTOR NAME HARRISON CONSTRUCTION & DESIGN ADDRESS PO BOX 2386 CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # P $ 50.00 PROJECT VALUATION $ 600.00 PERMIT #: 100440 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT I 0 - o sf-,0 f t Location: / V/ 7 ,, ' / %? NAME ADDRESS PIN # TELEPHONE Owner �0�/ ,//7 / /i 7,fve . 76'6" 51/ 33 Architect or Engineer Building Contractor //.,,_e -rii a.-t C'o 4Y1: c ' /J,�-, 3,� /l'/ e=2,-'92/a// ✓r_ _ /Z ® �3 (Che k all that apply) Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other 2' Residential ❑ Single Family ❑ Duplex ❑ Multi- Family n Commercial n Footprint Changes ❑ Discovery ❑ Demolition Details of Project: mood , /,/1 ,/A7 7 7a-5:71z L mod' Estimated Cost of Construction: $ 690 Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces # Bedrooms # Bathrooms Living space (total sq. ft.) Trees located & listed on site plan Access: Driveway Setbacks: Front (ft.) With culvert? With swale? Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by av/4- ,,c,`, Construction debris will be disposed by ConJ�- by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: /c7-- 0„2 ogoy o Signature of Applicant: �� N Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL