Loading...
HomeMy Public PortalAboutCEDARWOOD DR_9.pdfPermit No. {fy m affti+s ,21/-5711 City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 /3- aL/6 Date Requested (2 V30/ 3 INTERNATIONAL CODE COUNCIL MEMBER Owner's Name 67-Y Or > fj. Date Needed a7/3/h3 9 , Gen. Contractor )6- (Z,y f1J'a4 Subcontractor Contact Information V e - 14J-1- 4 747 Project Address ) C. f A#' waop Scope of Work a2 ,Ai) TS Inspector Date of Inspection 4 Inspection f r 4.4 t-- Pass El Fail El Fee (,7,eL 4=-0-7/7Y/f-- Inspection Pass ^ Fail Fee Inspection Pass l� I-I Fail D1 Fee Inspection Pass Faii Fee DATE ISSUED: 07 -22 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT 2 NEW OUTLETS 9 CEDARWOOD CITY OF TYBEE PO BOX 2749 TYBEE ISLAND GA 31328 -2749 DAWG -GONE VENTURES INC dba LEE ELECTRIC SAVANNAH GA 31402 P $ 50.00 $ 300.00 PERMIT #: 130465 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: Ako- J./Lid/A=1- P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date 7 '- / ,,/ ew Work �l Location of work (street address) g eae /e%QQ Contractor Address of Contractor 0 l Property Owner C 1 f Date work will be ready for inspection, if known Replacement Telephone '/t- 2)Y4 477 17 Telephone Estimated cost of construction Permit Number ALL wiring, servic included, must be COPPER. NO alunikum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this • •licy may result ' • nnection of the electrical service until all violations and deficiencies are corrected. Own /Contractor ignature Date "7/ 4eec_ Owner /Contractor Printed Name APPROVAL Building Official Fee Date A/C Unit and Heat Pump Attic Ventilation Fan Bell Transmitter — low voltage Border /Outline Lighting Building Saw Exit Lights — life safety Heat Pump Meter Box Motor(s): hp j- Outlets — 110 volts circuit Parking Lot Lights Pool Lights — grounding Range — commercial Permit Number ALL wiring, servic included, must be COPPER. NO alunikum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this • •licy may result ' • nnection of the electrical service until all violations and deficiencies are corrected. Own /Contractor ignature Date "7/ 4eec_ Owner /Contractor Printed Name APPROVAL Building Official Fee Date Range Hood — commercial Service: amps Sign Circuit - wattage Smoke Detector — low voltage Spa or Tub — grounding Special Outlet Swimming Pool — grounding Water Heater Welder — 220 volts circuit Well Pump — grounding X -ray Other Permit Number ALL wiring, servic included, must be COPPER. NO alunikum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this • •licy may result ' • nnection of the electrical service until all violations and deficiencies are corrected. Own /Contractor ignature Date "7/ 4eec_ Owner /Contractor Printed Name APPROVAL Building Official Fee Date