HomeMy Public PortalAbout10-0481 Mopper StapenCity of 1
403 Butler
Phone
, _le Island • Community Develop.___nt Dept.
Inspection Report
Ave. • P.O. Box 2749 Tybee Island, GA 31328
912.786.4573 ext. 114 • Fax 912.786.9539
A)/4 Lit 3
Permit No. /(.9 ...7()/2)/ Date Requested
Owner's Name Y22O 7 >E..- Date Needed
Gen. Contractor Subcontractor
;/
INTERNATIONAL
CODE COUNCIL'
MEMBER
Contact Information
Project .address
Scope of Work
Inspector
Inspection
Date of Inspectio 6 A •
�4 �l 1
Pass it EJ Fee
Inspection
Inspection
Inspection
Pass LJ Fail 1__1 Fee
Pass Fail El Fee
Pass
Fail Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 01/07/2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
LEVEL FLR/DRS /HEAT PUMPS /ROOF
1115 JONES APTS
. MOPPER- STAPEN
31 W CONGRESS ST
SAVANNAH GA 31401 -2644
. MOPPER- STAPEN
31 W CONGRESS ST
SAVANNAH GA 31401 -2644
P
$ 428.00
ADDED $4,500 FOR REROOF
$12,300.00
PERMIT #: 100481
TOTAL BALANCE DUE: $ 320.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
F7I- 0-7 -2 D11
11 l 4 -3-rD Ave
DATE ISSUED: 10 -1 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
LEVEL FLOOR/DOORS /HEAT PUMPS
1115 JONES APTS
. MOPPER- STAPEN
31 W CONGRESS ST
SAVANNAH GA 31401
. MOPPER- STAPEN
31 W CONGRESS ST
SAVANNAH GA 31401
PERMIT #: 100481
.0
P L
$108.00 00./1
(.1 tApC\4
$7,800.00 f—± 6.4;40;O® , °
I
Z, O O
TOTAL BALANCE DUE:
$ 108.00 4 35*
xz
70
♦25O
°
44l447.1
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
(0-oktgi
Location: f /) 5 -Ton ,e5 rJ e
NAME
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
ADDRESS
PIN #
TELEPHONE
Owner
Pc4 ,t frlD
/1 IS ;)"l,,,e's Ave,
1 42-- SSC
Architect
or Engineer
/
A//
—
Building
Contractor
CAM
(Check all that apply)
epair
171 Renovation
❑ Minor Addition
n Substantial Addition
[ er
t
Eesidential
❑ Single Family
❑ Duplex
Multi- Family
E Commercial
Details of Project: Re �G /1
doors 4-- l e rlP 1)-16 170c2i i t 7L-WO PW4p rr� .N S gt-wi,,
Estimated Cost of Construction: $ 9200o GO
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
1
rn
U Footprint Changes
n Discovery
E Demolition
OF /loci s
kooni.• /
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
act. eiC/Ikv7 4€44
10,(40 kin Q6b4
ht a a- t on
(6) Other (please specify)p/ a� +otia $
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units - # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With Swale?
Setbacks: Front Rear
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: L —0171 ,01 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
if not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water/Sewer
Storni/Drainage
Inspections
City Manager
Signature
Date
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
FEES
214
TOTAL Og
Dianne Otto
From: Dianne Otto
Sent: Thursday, September 30, 2010 11:07 AM
To: 'Dicky Mopper'
Subject: RE: Building permit application for 1115 Jones Avenue
Attachments: SKMBT_C55010093010330.pdf
Dicky,
I received the permit application and will pass it to the building official for review. He will not be in the
office until tomorrow. Will the new doors have glass in them? If yes, it is required that they meet the
following standards. Save the stickers or paperwork to show to the inspector.
DP 45 or higher
Solar heat gain .4 or lower
Means of protection (minimum 1 /2 -inch plywood with mounting hardware)
Building permit 09 -0194 was issued in April of 2009 for 1 1 15 Jones Avenue and remains open. It was for
replacement of rotten wood siding and 3 windows. Please schedule an inspection at your earliest
convenience by calling 786 -4573, extension 114 or 136. Someone will need to be at the house during
the inspection.
Please let me know if you have any questions.
Dianne K. Otto, CFM
City of Tybee Island
phone 912.786.4573 ext. 136
fax 912.786.9539
From: Dicky Mopper [mailto:dmopper @mopper- stapen.com]
Sent: Thursday, September 30, 2010 10:44 AM
To: Dianne Otto
Subject: Building permit application for 1115 Jones Avenue
Diane,
Attached is my application for a building permit at 1115 Jones Avenue. If you have any questions feel free to call me
anytime at 912 - 663 -5500 or I can drop in to see you. I will bring my permit fee as soon as you let me know the amount.
Thanks,
Dicky
Richard G. Mopper
Principal
roA Savannah
Gcmrrmerc,al Raa1 Estate Sorozos. Wv'nwido
31 West Congress Street. Savannah GA, 31404
1