HomeMy Public PortalAbout06 - Department Reports Combined JuneMonthly Department Report – City Manager Memo To: City Council From: Nate Coyle, City Manager Date: 7/6/2017 Re: Monthly Department Report – June 2017 Council Members, Please find my highlights from the month of June below: 1. Budget Process Update: Staff is working to make revisions to the FY18 draft budget following the initial conversation with the Council on June 30th. The City has not yet received healthcare quotes for inclusion in the draft budget. Once this information is received, it will be shared with the City Council. Staff will be prepared to present a revised budget for consideration of the City Council on July 14th. Within this pending presentation, staff will focus on finalizing direction for the Tourism LOT, outside agency requests within the general fund, and other O&M and capital funding components of the budget. 2. Waste Water Consolidation Update I continue to work with staff to prepare for the pending consolidation of waste water entities. As noted in the annexation agreement, the annexation date is contingent upon the date that bonds are issued. We are still awaiting an estimated date for when this will occur, however the projection is that this will be completed in mid to late August. I will be looking to coordinate an update presentation for the City Council during the July 27th meeting. 3. Website Development Process The contract for website development has been executed. The general timeline for completion of a new website is three to four months. Erin Greaves will hold a discussion with the City Council in the upcoming weeks to obtain general feedback/direction from Council members to prepare for the redevelopment process. Page 1 of 25 Monthly Department Report – City Manager 4. Fourth of July in McCall There were no significant issues faced by the City of McCall during the Fourth of July holiday. Staff will prepare an update for the Council to be provided at the July 27th Council meeting. Additionally, staff will begin preparation of a post-July Fourth meeting with partner agencies to debrief the holiday and associated planning efforts. 5. Commerce Street Construction Public Works staff provided written correspondence to property owners on Commerce Street announcing the commencement of reconstruction efforts to begin on/about July 17th. The letter outlined anticipated impacts and mitigation efforts which are associated with this project. Additional information about the project can be found on the City’s website. 6. City Manager Recruiting and Selection I will present a proposal for selection of an interim City Manager during the July 13th meeting. I will also provide a recommendation for selection of a recruiting agency to be utilized in the recruitment process at this meeting. This recommendation meets the direction provided by Council to utilize a recruiting agency for this process. Traci Malvich, Erin Greaves, and I reviewed three separate proposals and feel confident that we are providing a strong recommendation for consideration of the City Council. Page 2 of 25 Monthly Department Report – Airport Memo To: City Council From: Jay Scherer, Airport Manager CC: Nate Coyle, City Manager Date: 7/5/17 Re: Monthly Department Report – June 2017 1.AIP 23 – Ramp Rehabilitation: The bids were opened June 15, 2017 and the project subsequently awarded to Granite Excavation contingent on grant award. Project cost was Bid award packages sent to FAA, awaiting grant funding notification. 2.Lease Rates and Airport Fees: An ordinance was approved at the June 29, 2017 Council Meeting allowing the Airport to charge fees for vehicle parking and snow removal on leased property. Requesting public comment on the fees. Public Hearing to be held at July 27, 2017 Council Meeting. 3.Puget Sound Antique Aircraft Club (PSAAC) Air Tour: Preparation for the Air Tour continued in June. We are now expecting 45 aircraft and 102 visitors. McCall was selected as a stop on the PSAAC Air Tour. Every other year the PSAAC conducts an Air Tour for club members to fly their aircraft to different cities. Arrival is over a period from 11:00 a.m. to 12:30 p.m. Airport staff is working to provide food vendors at the Airport to enable interaction between the public and the pilots of these aircraft. The tour will be staying at the Best Western, taking a boat tour, and be on their own for dinner in town. 4.Airport Open House: Preparations for the Airport Open House continued with Careers in Aviation as a theme. An event will be held at the Airport July 15, 2017 from 9 a.m. to 2 p.m. Static aircraft displays, helicopter rides, speakers, and drone demonstration are planned for the event. Page 3 of 25 Monthly Department Report – Community Development Memo To: City Council From: Michelle Groenevelt, AICP, Community Development Director CC: Nate Coyle, City Manager Date: 7/5/17 Re: Monthly Department Report – June 2017 1. McCall In Motion: Draft Plan is going through an internal review process prior to submission for public review in August. Staff and consultant team are still hustling to get the Plan to the governing board this fall for adoption. 2. McCall Area Code Update: Jim Carter, code writer from Logan Simpson, has outlined a reorganization of Title 3 and 9. His next steps prepare the text for the shoreline and scenic route overlays and start on the CBD zone provisions. He is researching other Idaho and western communities for good examples of form- based standards and the resulting built environment as examples to help McCall’s choices. This process will slightly follow the Comprehensive Plan process. 3. Certified Local Government status: The City of McCall has been recertified as a Certified Local Government under the guidelines established by the National Park Service and administered by the Idaho State Historic Preservation Office. This certification allows the City to be awarded federal funding for historic preservation projects. 4. Public Art on Lardo Bridge: The City of McCall was awarded $25,000 from the National Endowment for the Arts “Our Town” program for the design and installation of public art on Lardo Bridge. The project, “Bridging the Source: the Arts and Payette Lake”, will include a partnership with McCall Arts for local arts programming using the lake environment as a theme, as well as the procurement of a public artist for the artwork. The project will take place in FY18. Page 4 of 25 Monthly Department Report – Community Development 5. GIS Planning for the Southwest Idaho GIS User Group meeting here in McCall. This year’s topic is Giving Back and Building Communities. Currently working on several custom maps for various departments. Continuing to collect field data for the McCall Stormwater network. Helping to wrap up the updates to the FEMA maps. Assisting in effort to create caps for the poles of the current bike and pedestrian wayfinding signs. Page 5 of 25 GRANT STATUS REPORT- June 13, 2017 Department Project Name Project Manager Purpose Funder Amount Status Streets Department Mission Street Reconstruction TBD Reconstruct Mission Street from Deinhard to S. City Limits FHWA through LHTAC $2.19 million No change. Expected to be on draft FY18-22 ITIP. Parks Riverfront Park Access Improvements Kurt Wolf Improve road surface, parking, and stormwater management at Riverfront IDPR $17,866 No change: Work to be completed in FY17 Public Works/Water Water Master Plan Update Nathan Stewart Update Master Plan IDEQ $89,998 No Change: Project is underway. Public Works/Sewer Groundwater Study Nathan Stewart Study leakage at wastewater pond IDEQ $77,000 No Change: Project is underway. Streets Department Commerce Street Reconstruction Phillip Bowman Reconstruction of Commerce Street: stormwater and sidewalks LHTAC $100,000 Updated: Project awarded and will take place late summer 2017 Library Digital History Intern Meg Lojek/ Casey Bruck Hire a temporary assistant for historic records scanning Idaho Humanities Council $2000 No change: Project underway. Community Development Bridging the Source: the Arts and Payette Lake Delta James Public art installation on Lardo Bridge; partnership with MAHC programming National Endowment for the Arts $25,000 Updated: AWARDED! Parks/Recreation Mile High Mile Tara Woods Event supplies/promotion Rotary Club $500 Updated: not awarded Library Library Expansion Meg Lojek Capital Campaign request Rotary Club $15,000 Updated: not awarded Library Library Expansion Meg Lojek Capital Campaign Request Laura Moore Cunningham Foundation $100,00 No change: Will be notified in late summer Library Library Expansion Meg Lojek Capital Campaign request McCall Progressive Club $5000 Updated: not awarded in first round but will be considered in second round. NOTE: THIS SUMMARY DOES NOT INCLUDE STATUS OF GRANT FUNDED PROJECTS ADMINISTERED BY AIRPORT DIRECTOR OR MCCALL POLICE DEPARTMENT. Page 6 of 25 $15,403$6,874$1,332$39$3,963$16,436$23,473$37,761$42,361$34,419$10,523$32,419$14,734$1,352$3,667$5,729$10,532$11,649$66,039$26,528$40,008$35,463$23,316$51,797$13,953$2,623$3,553$1,469$9,433$35,705$38,367$66,275$52,029$23,553$34,042$28,993$12,031$10,966$1,476$22,220$23,011$39,518$50,066$50,606$62,108$38,661$60,598$104,579$27,443$5,193$1,132$1,216$89$21,730$55,090$56,222$82,734$0$0$0$0$20,000$40,000$60,000$80,000$100,000$120,000123456789101112BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESTOTAL BLDG PERMIT FEES ‐PER MONTH ‐FISCAL YEAR20132014201520162017OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP Page 7 of 25 1234567891011122013$15,403 $22,277 $23,610 $23,649 $27,611 $44,047 $67,520 $105,281 $147,642 $182,061 $192,584 $225,0032014$14,734 $16,086 $19,753 $25,482 $36,014 $47,662 $113,701 $140,229 $180,237 $215,700 $239,016 $290,8132015$13,953 $16,575 $20,129 $21,598 $31,031 $66,736 $105,103 $171,378 $223,407 $246,960 $281,001 $309,9942016$12,031 $22,997 $24,472 $46,692 $69,703 $109,221 $159,287 $209,892 $272,001 $310,661 $371,259 $475,8382017$27,443 $32,636 $33,768 $34,984 $35,073 $56,803 $111,893 $168,114 $250,848 $250,848 $250,848 $250,848$0$50,000$100,000$150,000$200,000$250,000$300,000$350,000$400,000$450,000$500,000BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESBLDG PERMIT FEES ‐RUNNING TOTAL ‐FISCAL YEAROCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPFY 2017 BUDGET $305,250 FY 2016 BUDGET $264,000 Page 8 of 25 Monthly Department Report – Golf Course Memo To: City Council From: Eric McCormick, Golf Course Superintendent CC: Nate Coyle, City Manager Date: 7/6/2017 Re: Monthly Department Report – June 2017 1.Weather: The weather went back to cool and wet to hot and dry which makes it hard to irrigate around. 2.Staff: At the end of June, staff was reduced as one of the summer seasonal’s family moved out of the area. Was able to hire a long term seasonal to replace the one that we knew was leaving the first of the month. 3.Greens: Greens are in good shape other than some topdressing is needed. The sod is a little on the wet- side, however, reluctant to dry them up with it as hot as it is. 4.Practice Green Expansion: The green expansion area is shaped and filled with sand and compost mix, and it took a quarter of the time that it normally would have taken with the other equipment typically used. The plan is to cut sod at the nursery and move it onto the expansion area next week during the Pro Am. The goal is to have it open during the Amateur. 5.Golf Course Play: Rounds were down the first part of June due to inclement weather but quickly made up for it by the end of the month. The numbers are lower compared to the last two years but in line with the five year average. Page 9 of 25 Monthly Department Report – Information Systems Memo To: City Council From: David Simmonds, Information Systems Manager Date: 7/5/17 Re: Monthly Department Report – June 2017 Council Members, Brief Information Systems updates from June and early July, 2017: 1. FY18 budget and project preparation: A major theme of the FY18 program will be completion of an Office 365 / hosted email, office phone and Sharepoint project. The IT world has moved strongly in the direction of hosted (or “cloud”) services and software subscriptions rather than perpetual software license purchases. In addition to providing new capabilities and benefits to City staff, this project is also projected to have a lower cost than continuing with the software and services model we’ve implemented for the past 15+ years. First-year implementation and consulting costs result in a higher than usual software budget, with a reduced cost thereafter. 2. Current projects: A planned June 2017 datacenter expansion is complete. The new hardware, storage and network equipment provide increased capacity, better data backup options, fault tolerance and performance. A network upgrade for the Parks & Rec offices on Deinhard Avenue is complete. Major firmware upgrades to all core network equipment have been completed, with firewall platform software / firmware upgrades coming next. Remote facility network wireless link upgrades are underway. Rollout of the last FY17 desktop / laptop computers is wrapping up this week. Page 10 of 25 Monthly Department Report – Library Memo To: City Council From: Meg Lojek, Library Director CC: Nate Coyle, City Manager Date: 7/6/2017 Re: Monthly Department Report – June 2017 1. Building Expansion Project: Work continues to estimate local philanthropic capacity for the Library expansion campaign. Consultants are finishing the one-on-one meetings with interested members in the community and their report is due at the end of July. One result is that the Library became the benefactors of the Jason Hawkins Memorial Gold Tournament, held at McCall Golf Course July 2nd, receiving $6500 for the new library. Thanks to the Hawkins family, friends and sponsors! 2. Partnerships: Highlighting our great partnerships with McCall Parks & Rec, University of Idaho Extension, Kaleidoscope Festival, St. Luke’s McCall, and the Community Resource Bike Rodeo. 3. Upcoming programs: June started Summer Reading Fun with 3 weekly programs for elementary and middle school aged students. Registration is full. The preschool veggie garden is planted—come watch it grow! Makerspace and STEM activities abound at a techno-gadgetry showcase July 28th and August 4th. Adults can learn how to rock their Medicare enrollment with Senior Health Insurance Benefits Advisors’ free workshop. Page 11 of 25 McCall Public Library 208-634-5522 www.mccall.lili.org Hours: Monday-Friday 10-6pm; Saturday 10-2pm; Sunday closed Library CLOSED July 4th Sun Mon Tue Wed Thu Fri Sat 2 3 6:00pm Black Bear Re-Hab 4 9:00-1:00 Friends of the Library Book Sale LIBRARY CLOSED 5 10:30-11:00 StoryStop 1:00 -2:30 Summer Reading Tweens—Art Bots 6 10:30-11:30 Story Time 7 11:00-12:00 & 1:00-2:00 Summer Reading Fun— Grow a Better World 11:00-1:00 E-Books and Overdrive 8 9 10 11 3:30– 5:30 Tech Tues- day & Board Games 6:30pm—SHIBA Medicare 12 10:30-11:00 StoryStop 1:00 -2:30 Summer Reading Tweens— Movie Grand Finale 13 10:30-11:30 Story Time 14 11:00-12:00 & 1:00-2:00 Summer Reading Fun— Sand Castle City 11:00-1:00 E-Books and Overdrive 15 . 16 17 18 3:30– 5:30 Tech Tues- day & Board Games 19 10:30-11:00 StoryStop 20 10:30-11:30 Story Time 21 11:00-1:00 E-Books and Overdrive 22 23 24 25 3:30– 5:30 Tech Tues- day & Board Games 26 10:30-11:00 StoryStop 5:00-7:00 Plant Clinic 27 10:30-11:30 Story Time 28 11:00-1:00 E-Books and Overdrive 3:30—5:00 Mak- erspace 29 30 31 1 3:30– 5:30 Tech Tues- day & Board Games 2 10:30-11:00 StoryStop 3 10:30-11:30 Story Time 4 11:00-1:00 E-Books and Overdrive 3:30—5:00 Mak- erspace 5 Primary Business Address Your Address Line 2 Your Address Line 3 Your Address Line 4 Your business tag line here. Phone: 555-555-5555 Fax: 555-555-5555 E-mail: someone@example.com J u l y 2 0 1 7 P r o g r a m s SPECIAL EVENTS: Black Bear Re-Hab Monday, July 3rd at 6:00pm Learn about how to properly treat our woodland friends— the Black Bear, and hear about what IBBR is doing to protect the future world of all bears. Friends of the Library Book Sale Tuesday, July 4th at 9:00am—1:00pm Our store-room is literally bursting at the seams with literature! Come down and buy a bag full of books then watch the fireworks! SHIBA Medicare Tuesday July 11th at 6:30pm Turning 65? Blown Away by Medicare Options? Rock your enrollment with help from Idaho Senior Health Insurance Benefits Advisors (SHIBA). Attend this FREE workshop to learn: Medicare terminology, decisions you will have to make, timeframes, and deadlines. 2017 Master Gardeners Plant Clinic Wednesday, July 26th 5:00-7:00 pm Every 4th Wednesday during the Summer An awesome opportunity to chat with a local master gar- dener! Make sure to bring your plants and questions. Makerspace with Kyle Peterson Friday, July 28th & August 4th 3:30-5:00pm University of Idaho Extension STEM intern Kyle Peterson will be hosting two FREE Makerspace sessions at the library. Be ready to enjoy a myriad of techno-gadgetry! No prior experience necessary Summer Reading Fun! Challenge your child to "Build a Better World" brick by brick, and book by book! This year we have 5 weeks of ex- citing events. Programs are full, but you can still work through a reading log, and win prizes! Register today for independent reading at mccall.lili.org ONGOING PROGRAMS: Tech Tuesdays & Board Gaming ~ Tuesdays— 3:30pm-5:30pm –Dedicated time for 3D printing, and play board games with us while you wait for your print! Ages 7 and up. E-Books and Overdrive ~ Fridays—11:00am-1:00pm— Bring in your tablet or phone, and we will help you get Overdrive set up with your library account. Call for an appointment. Story Stop ~ Wednesdays 10:30 – 11:00 am A streamlined library story time with rhymes & games for children ages 0-3 (with adult). Children’s Story Time ~ Thursdays 10:30- 11:30 Ages 3-5 (with adult). Preschool stories, art, and social time. Page 12 of 25 Library Statistics -- FY2017 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Totals 2 - 000-099 3 8 5 4 7 6 7 3 8 3 - 100-199 16 14 23 19 21 14 18 21 24 4 - 200-299 17 12 18 19 15 17 13 17 13 5 - 300-399 60 61 40 49 58 78 56 58 63 6 - 400-499 3 3 7 8 3 3 7 8 8 7 - 500-599 34 39 57 37 24 27 41 25 43 8 - 600-699 82 84 37 47 80 58 96 102 60 9 - 700-799 38 65 52 44 56 90 80 81 63 10 - 800-899 23 35 30 34 28 24 15 26 30 11 - 900-919.9 31 28 13 22 15 34 33 54 39 12 - 929-999 55 55 44 67 63 61 62 66 45 13 - Adult Fiction 701 768 709 735 576 748 626 675 841 14 - Audio Books Circ Set 26 41 43 36 35 66 32 21 96 15-Audio Players 1 2 2 6 4 2 4 1 4 16 - Biography 27 31 34 30 17 36 30 29 21 17 - Board Books 130 98 90 54 58 56 95 119 112 18 - CD Fiction Books 228 190 143 173 163 219 178 193 184 19 - CD Junior Books 51 53 34 30 20 77 51 35 45 20 - CD Non-Fiction Books 31 32 7 16 19 23 7 23 20 21 - CD YA Books 5 5 5 5 7 13 8 1 6 22 - Chapter books 145 165 103 151 167 211 177 178 291 23- Computer Software 0 0 0 0 0 1 0 0 0 25 - Dawn Moudy Collection 5 5 2 0 4 4 6 10 11 26 - DVD Blu-Ray 13 16 17 17 8 11 13 15 17 27 - DVD Circ Set 31 57 67 41 43 85 47 76 105 28 - DVD Fiction 228 342 368 268 375 398 399 378 384 29- DVD Kids 93 125 174 133 199 207 191 150 248 30 - DVD Non-Fiction 64 41 35 40 57 43 48 34 65 31 - E Non-Fiction 68 47 32 44 48 39 67 42 66 32 - Eames Collection 3 5 2 0 7 0 6 9 5 33 - Early Readers 149 159 81 122 111 148 146 77 158 34 - Idaho Archives 1 3 0 0 0 1 4 0 0 35 - Idaho Room 57 36 57 48 87 77 100 52 92 36 - Independent Films 27 19 0 18 26 18 10 2 14 37 - Junior Biography 16 14 13 25 37 63 14 8 23 38 - Junior Non-Fiction 378 293 230 309 326 378 302 284 473 39 - Junior Readers 247 237 229 220 243 367 292 250 513 40 - Junior Spanish 23 25 24 29 9 15 16 37 19 41 - Kit 20 18 9 22 23 22 16 11 28 42 - Large Print 117 74 72 94 103 114 112 114 127 43 - Magazine 45 93 32 49 38 34 39 41 46 44 - Map 0 0 0 0 0 0 0 0 0 45 - Oversized 1 3 0 7 0 1 8 3 3 46 - Parenting 10 10 0 0 2 1 0 3 2 47 - Professional 0 0 0 0 3 0 1 0 1 48 - Reference 0 1 0 0 0 2 3 3 0 49 - Spanish 6 5 4 1 5 6 4 17 9 50 - Story Books 839 712 771 801 853 854 831 682 776 51 - Story Collection 19 23 17 19 12 14 4 n/a n/a n/a n/a n/a 108 52 - Y A Non-Fiction 32 40 39 24 22 25 16 38 42 53 - Young Adult Fiction 104 113 113 85 69 112 92 118 196 Adult Circulation 2003 2178 1937 1948 1954 2316 2111 2160 2443 Young Adult Circulation 141 158 157 115 98 150 116 157 244 Children's Circulation 2159 2006 1790 1940 2094 2437 2198 1873 2752 Page 13 of 25 Circulation Totals 4337 4376 3913 4028 4177 4932 4449 4210 5462 Attendance 2514 2172 1905 2303 2278 2615 2468 2342 3118 Computer Usage 480 443 378 376 504 521 453 384 536 Wireless Usage 131 133 111 167 135 108 114 117 270 ILL's Received 34 34 29 25 31 29 24 20 23 ILL's Sent Out 1 3 2 2 0 1 0 0 0 Reference Requests 429 406 305 425 409 482 301 388 494 Food for Fines 12 62 0 135 41 81 71 141 102 Number of volunteers 46 36 21 27 21 26 22 18 26 Total hours of volunteers 71 55 33 50 30 29 31 65 58 Adult Program Attendence 43 154 37 134 108 44 134 80 72 Young Adult Program Attendence 33 68 35 36 35 26 35 68 115 Children's Program Attendence 319 483 493 422 562 516 550 596 429 All Ages Program Attendance 0 100 52 0 0 21 4 10 160 Page 14 of 25 Monthly Department Report - Police Memo To: City Council From: Justin Williams CC: Nate Coyle, City Manager Date: 7/6/2017 Re: Monthly Department Report – June 2017 1. Officer Training or Certifications Sgt. Dallas Palmer attended TASER Re-Certification training in Idaho Falls Idaho on June 2, 2017. 2. Community Events On June 9th and 10th, the McCall Police Department partnered with McCall Public Works, Lake Shore Disposal, Valley County Transfer Station and Ridley’s Family Market for Free Spring Cleaning Event. The event was held at Ridley’s Market Parking Lot and allowed residents to dispose of unwanted items and yard debris at no cost. This event was held in conjunction with the Valley County Transfer Station’s Free Dump Week. The McCall Police Department participated in the McCall Community Fair host by St. Luke’s on June 9th-10th. Police Department employees were available to register bicycles and dogs during the event. Page 15 of 25 Monthly Department Report – Parks & Recreation Memo To: City Council From: Kurt Wolf, Parks & Recreation Director CC: Nate Coyle, City Manager Date: 7/5/17 Re: Monthly Department Report – June 2017 1. Summer Rec Programs, Registrations & Special Events: Youth Baseball and Softball is done for summer 2017. I received great feedback from coaches and parents. We discussed doing away with the tournament at the end of the season and hosting a family fun style tournament; kids vs. parents along with the pizza party. The 7-8 coach pitch age group went well and was a success. Easier to transfer from t-ball into live pitch. T-ball (41 pre-registered) and Wee Soccer (78 pre-registered) will begin immediately following the 4th of July Liberty Fest events. The first round of summer camps (SNAG Golf, Tots & Tykes, Skateboarding, Mtn. Biking and Tennis) went well with a combined total of over 100 participants. High Mtn. Soccer Camp was the largest it’s been in 8 years; according to event instructors; pulling in over 10 registrations from Grangeville. Credit card payments were interrupted during the last 2 weeks of June. Continuing to collect payments from registrations who have not yet paid for programs they registered for online. 2. Special Events: Continuing with advertising and registration efforts with McCall Rotary Club on their McCall Ball fundraiser event, scheduled July 14-16 at Gold Glove Park, Championship games held at Legacy Park. We currently have 13 teams registered. Continuing with Mile High Mile open-water swim race advertising efforts; we currently have 11 registered. Liberty Fest planning efforts- with participation Saturday through Tuesday; Rec Department assisted with Youth and Adult volleyball tournaments, softball tournament, bubble ball (with assistance from MUSA), bubble parade, car-show, set-up, take-down and presence at information tent. Page 16 of 25 Monthly Department Report – Parks & Recreation 3. Rotary Park Construction Update: Parking lot reconstruction project is 100% complete. Overall the re-construction project is 98% complete with minor planting and irrigation work remaining on the East end. Feedback regarding the improvements has been positive. We will be working on a write up and story during the early part of July which will outline the process, the unique elements of the design, the driving factors behind the design, and the budgeting process. We will also hold a grand opening event at the same time we run the Mile High Mile swim event in August. 4. Brown Park Capital Improvements: Working on purchasing policy and playground selection process and engineering. Site plan scheduled for August P&Z hearing. We have design and a cost estimate of one concept. Researching potential grand opportunities through IDPR which could potentially postpone construction of new play structure this fall. Securing additional funds would allow us to better meet the desires of the community as it relates to site improvements and the selection of a play structure. 5. Parks Overview and Staffing: Parks staff has been doing a fantastic job of keeping up with maintenance demands, janitorial needs, events, and projects despite being understaffed all season. Facilities weathered the July 04 holiday well with minimal damage. Will continue to recruit seasonal help and work towards hiring additional help to get through late summer and fall season. 6. July 04 Overview: Event was a huge success from a maintenance standpoint although extremely taxing on staff having been understaffed going into the holiday. In Summary: Park seemed just as busy and crowded during the night of the 04 as any other year. The difference being the types of crowd and impacts on facilities. People politely moved out of the way of staff so that they could do their job and complimented staff on their work. Facilities were not trashed or vandalized. Clean up at Legacy Park was done with 4-5 employees in roughly 2 hours as opposed to (12 employees and 5 hours two years ago). Page 17 of 25 Monthly Department Report – Public Works Memo To: City Council From: Nathan Stewart, Public Works Director CC: Nate Coyle, City Manager Date: 7/5/17 Re: Monthly Department Report – June 2017 ADMINISTRATION/ENGINEERING 1. Budget Development: Director and division superintendents working with finance and City Manager to prepare draft budgets for Streets and Water including capital project cost estimates for FY18. 2. Sewer Utility Transfer to PLRWSD: Director working with PLRWSD staff and regulatory authorities to facilitate EPA NPDES permit transfer from City to PLRWSD and DEQ consent order. Date of transfers are subject to date of bond issuance (estimated late August/early September). 3. Development Engineering Reviews: City Engineer actively engaged in numerous engineering reviews for multiple land use applications as well as final engineering designs for Silverpine Village, Shore Lodge Cottages, Whitetail Discovery Cottages, Wild River Java and Eagle Lake subdivision. 4. Commerce Street: Contract documents have been processed; construction notices sent to property owners on 6/30/17 for anticipated construction to start after 7/17/17. 5. Idaho Street, Brown Circle: Site surveying and engineering design kick-off meeting has been completed. Design team met with McCall/Donnelly School Superintendent to discuss pathway integration with School property. Preparations underway for formal stakeholder/property owner meeting to occur in July. STREETS 1. Crack Sealing: Following weather delays, city crews completed crack sealing on 3.5 miles of city streets applying over 13,500 pounds of crack sealant material. Page 18 of 25 Monthly Department Report – Public Works 2. Street Striping: Striping contract was awarded to Curtis Clean Sweep on 6/9/17; work began on 6/19/17 and was completed by 6/25/17. This year shared lane markings (i.e. “sharrows”) were included. Street crews commenced crosswalk, stop bar and parking lot striping. This work is 90% complete. Cold and wet weather conditions delayed striping activities by about 1 month compared to typical years. 3. Gravel Road Grading and Dust Abatement: Following weather delays, City gravel road grading and dust abatement commenced on 6/19/17. By 7/6/17, all of the City’s nine (9) miles of gravel roads and City owned gravel parking lots will have been rehabilitated and dust abated. SEWER 1. Collections: City crews completed over 20 hours of training with Payette Lakes Recreational Water and Sewer Staff on lift station operation. 2. Treatment: a. Influent flows have remained steady at ~1 million gallons per day. PLRWSD staff began irrigation withdrawals from the winter storage pond on 6/12/17. b. Significant noxious weed spraying was completed throughout the treatment plant campus (treatment plant and winter storage pond properties). c. City crews completed over 24 hours of training with Payette Lakes Recreational Water and Sewer (PLRWSD) staff on lift station operation; WATER 1. Distribution: Maintenance activities for the month primarily focused on service/repair of 36 pressure reducing valves throughout the system. Approximately 7 new water meters/services were installed. 2. Treatment: a. Work continues with SPF on the alternatives for the raw water chlorine system. Team currently evaluating potential for chlorine injection to occur at treatment plant vs pretreatment within the intake lines. b. Electrical and mechanical improvements have been made to backwash sludge management system. Final work to be completed in July. c. Treatment managers completed over 21 hours of cross-training with water and sewer utility staff on water treatment related duties in preparation for “on-call” duty staff and schedule modifications. Page 19 of 25 Streets LOT Actual Dollars Earned per Month Month FY16 FY17 Totals October - 108,698 108,698 November - 80,265 80,265 December 159 124,332 124,491 January 99,990$ 101,185$ 201,175 February 100,883$ 104,030$ 204,913 March 85,338$ 93,236$ 178,574 April 70,264$ 68,894$ 139,158 May 97,418$ 103,832$ 201,250 June 168,831$ 168,831 July 235,029$ 235,029 August 208,024$ 208,024 September 169,309$ 169,309 Total Dollars Received $1,235,245 $784,472 2,019,717 Page 20 of 25 STREETS LOT BUDGETED, ACTUAL, AND FORECASTED DOLLARS Month Tourism LOT Five year average percentage FY16 Budget dollars FY16 actual and forecast based on trend Percentage +/- based on budget Actual total Budget total total +/- YTD October 4.53%92,930 108,698 16.97%108,698 92,930 16.97% November 2.62%41,302 80,265 94.33%188,963 134,233 40.73% December 5.92%90,865 124,332 36.83%313,295 225,098 39.16% 1st Quarter Total 225,098 313,295 39.18% January 6.83%102,412 101,185 -1.20%414,480 327,511 26.55% February 7.21%108,156 104,030 -3.81%518,510 435,666 19.02% March 5.82%87,264 93,236 6.84%611,746 522,930 16.98% 2nd Quarter Total 297,832 298,451 0.21% April 2.72%40,774 68,894 68.97%680,640 563,704 20.74% May 4.32%64,848 103,832 60.12%784,472 628,552 24.81% June 10.80%161,983 170,000 4.95%954,472 #DIV/0! 3rd Quarter Total 267,605 342,726 28.07% July 19.48%292,213 250,000 -14.45%1,204,472 #DIV/0! August 17.85%267,795 250,000 -6.64%1,454,472 #DIV/0! September 11.91%178,591 180,000 0.79%1,634,472 #DIV/0! 4th Quarter Total 738,599 680,000 -7.93% Total 100.00%1,529,133 1,634,472 120.54% 1,529,133 1,843,217 6-Jul-17Page 21 of 25 TOURISM LOT ACTUAL PERCENTAGES AND FORECASTED DOLLARS Month FY12 FY13 FY14 FY15 FY16 Five year average FY17 Budget dollars FY17 Budget + Contingent dollars FY17 actual and forecast based on trend Percentage +/- based on budget Actual total Budget total total +/- YTD October 4.70%3.96%4.02%5.03%4.92%4.53%18,138 20,175 25,791 42.19%25,791 18,138 42.19% November 2.32%2.38%2.47%3.06%2.89%2.62%10,510 11,690 15,209 44.72%41,000 28,647 43.12% December 5.29%6.23%5.44%5.68%6.94%5.92%23,703 26,364 32,785 38.32%73,785 52,350 40.95% 1st Quarter Total 52,350 58,229 73,785 40.95% January 6.48%6.30%7.44%6.98%6.94%6.83%27,358 30,431 31,506 15.16%105,291 79,708 32.10% February 7.48%7.28%6.60%7.43%7.26%7.21%28,893 32,137 35,777 23.83%141,068 108,601 29.90% March 6.59%6.60%5.81%4.80%5.28%5.82%23,312 25,930 25,899 11.10%166,967 131,913 26.57% 2nd Quarter Total 79,563 88,498 93,182 17.12% April 2.54%2.01%2.61%3.03%3.40%2.72%10,892 12,115 14,865 36.47%181,832 142,805 27.33% May 3.59%3.62%4.62%4.88%4.91%4.32%17,324 19,269 23,315 34.59%205,147 160,129 28.11% June 9.62%10.98%11.10%11.09%11.20%10.80%43,272 48,132 55,436 28.11%260,583 203,401 28.11% 3rd Quarter Total 71,488 79,516 93,616 30.95% July 20.57%20.27%19.60%18.58%18.37%19.48%78,062 86,828 85,000 8.89%345,583 281,463 22.78% August 18.56%18.76%19.49%16.58%15.88%17.85%71,539 79,573 75,000 4.84%420,583 353,001 19.14% September 12.26%11.61%10.79%12.86%12.02%11.91%47,709 53,066 60,000 25.76%480,583 400,710 19.93% 4th Quarter Total 197,309 219,467 220,000 11.50% Total 100.00%100.00%100.00%100.00%100.00%100.00%400,710 445,710 480,583 128.11% 400,710 445,710 513,350 400,710 79,873 Year to date the actual revenues received for FY17 are 7.39% OVER the year to date revenues for FY16 and 46.87% over the 5 year average year to date. 6-Jul-17 Page 22 of 25 October November December January February March April May June July August September Average 15,866 9,270 20,826 23,828 25,032 19,826 9,691 15,344 37,779 67,110 61,305 41,072 Budget 18,138 10,510 23,703 27,358 28,893 23,312 10,892 17,324 43,272 78,062 71,539 47,709 FY17 Actual 25,791 15,209 32,785 31,506 35,777 25,899 14,865 23,315 ---- Forecast 55,436 85,000 75,000 60,000 - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 LOT FiveYear Average Compared to FY17 Actual Average Budget FY17 Actual ForecastPage 23 of 25 - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 October November December January February March April May June July August September Averages FY12 FY13 FY14 FY15 FY 16 FY 17 Forecast Five Year Actuals Comparison to Average Page 24 of 25 Month FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Totals October 14,274 16,938 14,412 11,306 10,483 11,520 12,392 12,163 13,390 19,298 22,085 25,791 136,176 November 11,272 9,748 7,978 7,147 5,850 5,535 6,103 7,298 8,233 11,738 12,986 15,209 80,902 December 18,547 21,746 22,261 16,224 14,294 15,459 13,939 19,101 18,122 21,802 31,168 32,785 181,495 January 17,232 18,707 20,163 17,932 17,007 17,510 17,065 19,334 24,733 26,778 31,157 31,506 196,461 February 20,446 22,943 27,324 24,826 18,873 19,921 19,716 22,331 22,013 28,487 32,613 35,777 226,880 March 15,110 13,668 21,527 15,969 8,925 11,941 17,344 20,251 19,365 18,422 23,712 25,899 162,523 April 7,294 8,049 6,425 5,954 6,183 6,210 6,696 6,165 8,719 11,641 15,255 14,865 73,336 May 11,994 11,230 9,368 8,595 7,335 8,074 9,461 11,113 15,390 18,711 22,047 23,315 111,271 June 23,442 24,611 25,426 22,248 21,491 20,728 25,352 33,681 37,000 42,541 50,323 276,520 July 47,654 54,276 47,052 42,408 48,747 49,843 54,214 62,187 65,335 71,296 82,520 543,012 August 44,024 52,948 41,089 32,480 39,398 44,505 48,919 57,546 64,959 63,598 71,300 489,466 September 26,973 26,073 23,600 25,826 20,258 27,603 33,029 35,605 35,959 49,346 53,966 304,272 Total Dollars Received 258,263 280,937 266,627 230,991 218,844 238,849 260,743 306,775 333,218 383,658 449,132 205,147 2,778,904 LOT Actual Dollars Earned per Month Page 25 of 25