Loading...
HomeMy Public PortalAbout10-0498 City of TybeeCity of See Island • Community Devela ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 gitYklis Ewa% INTERNATIONAL CODE COUNCIL' MEMBER i Permit No. Date Requested ' i . -f-1 I r Owner's Name r J, L., 7i l :. '. , Date Needed Gen. Contractor Subcontractor JOE-. r .)- i +C, , , L-17 Ac-i71D i Contact Information Project Address 97(44 -1\ 4 ' )- t Cam Scope of Work Inspector Date of Inspection /,f Inspection ( / KT. tT >, .= Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail Fee Inspection Pass ❑ Fail ❑ Fee City of 403 Butler Phone )ee Island • Community Dever ent Dept. Inspection Report Ave. • P.O. Box 2749 • Tybee Island, GA 31328 912.786.4573 ext. 114 • Fax 912.786.9539 ice`\ INTERNATIONAL CODE COUNCIL MEMBER Permit No Date Requested Date Needed Subcontractor Owner's Name Gen. Contractor Contact Information t VCS Project Address Scope of Work !' J )f Inspector is Date of Inspection ' Inspection ; 17- 1 Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 10 -19 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR COMMERCIAL BLDG 5 FORT AVE CITY OF TYBEE - CAMPGROUND TYBEE ISLAND GA 31328 CITY OF TYBEE - CAMPGROUND TYBEE ISLAND GA 31328 U $ 0.00 $15,000.00 PERMIT #: 100498 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT ft \ieg Etc) AMIa12oQQ,ij g1I I�4124< Location: SFoer AvEiJuE, T'Y8EE 161A/4D, aE0e4 1,4 51307g PIN # NAME ADDRESS TELEPHONE Owner c ►r'( OFT EE. I3146 Architect or Engineer Building Contractor 0..t1-1 of TWEE ►SL~ T�1,...i VEP%. 91a- 7810 - 4573 It - 1.10 (Check all that apply) �✓ Repair ✓ Renovation �✓ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: AT?a n Residential Single Family Duplex Multi- Family Commercial I 1404.43E MaDEL1J4 ❑ Footprint Changes ❑ Discovery n Demolition Estimated Cost of Construction: $ 15 Oo 0 Co ction Type (Enter appropriate number) (1) Wood Fra (4) Masonry : er . ease specify) (2) Wood & Masonry _ _ Steet& Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? # Bedrooms # Bathrooms Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through j3Art-I ;Lase On -site waste and debris containers will be provided by DA/ Construction debris will be disposed by 1R4 by means of '7 I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: to 119/o Signature of Applicant: 441//// -, Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Date lei c41 (0 FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL City of Tybee Island — Community Development Department BUILDING PERMIT ?era-nt Number: (001191 Issue:cif IDAte a ©lb Address: f2tuit's toct (et of5reowl J©b Nme. 8.444‘ 3 ein rfype Work gattAroorn Pe4 roc+ Ilood Zone (f applicabge),°, rTho v© --penall4 this 111112carrei must he posted End v'sabLe fr© the street untn compllelorm fpToject Ca (9 TO SCHEDUL7 AN INS ECTI{ON 2) 786-4573, extension 114, by 4:©© 13M. the day before you nee an inspection.