Loading...
HomeMy Public PortalAbout08 - Consolidated report AugustPage 1 of 2 City Manager Department Report - MEMORANDUM Please find my highlights from the month of August below: 1. Streets LOT Nathan Stewart and Horrocks Engineering have completed individual property owner meetings along Commerce Street, and have also reviewed initial survey and modeling information. A follow-up discussion with the Council is being scheduled for 23 September to present the findings of research and discussions on this topic. At this meeting, four roadway sections with estimated respective costs will be presented to the Council for consideration. Staff will request that the Council make a selection for a roadway section during this meeting. An invitation to property owners on Commerce Street will be sent prior to this meeting. Conversations regarding a potential LID to pave streets have continued, primarily with property owners along Flynn, Chipmunk, and Conifer. Staff is continuing to provide maximum assistance to the property owners for pursuit of an LID on these streets. It is anticipated that property owners will initiate a petition process in early winter to seek interest for forming an LID on these streets. 2. Public Works Director Recruitment A first round of interviews has been conducted. A second round of interviews is scheduled to occur on September 6th. It is expected that a selection will be recommended to the City Council following completion of the second round of interviews. 3. Parks and Recreation Director Recruitment A vacancy to fill this position was released at the end of July and closed on August 22nd. Eleven full applications were received for this position. I am now in the process of forming a committee to begin the process of interviewing applicants for this position. 4. Sewer Rate Study Staff members from PLRWSD and the City will meet for a joint phone call with FCS on 12 September. The purpose of this meeting will be to provide any final data needed by FCS, and to clarify assumptions utilized by FCS in the process to date. Following this meeting, I expect there TO: City Council FROM: Nate Coyle DATE: 09/08/2016 RE: CITY MANAGER DEPARTMENT REPORT— AUGUST ____________________________________________________________________________________ Consolidated Department Reports September 8, 2016 Page 1 of 26 Page 2 of 2  City Manager Department Report   to be a number of meetings to being reviewing and discussing the data, which is the point at which I believe Council engagement will be appropriate. Council Member Giles has volunteered to assist this committee and I will intend to coordinate with him to provide input as we begin reviewing data prior to presentation to the full Council. 5. Sewer Planning Discussions I am preparing the next discussion for City Council to occur during this meeting. Staff also met with representatives from DEQ on 30 August to discuss our current status and also review permitting options in the event that consolidation is not successful. I will provide an update of this information during theh presentation that I provide to the Council. 6. July 4th Follow-up The survey for July 4th has been released to the general public and to businesses within McCall. The survey will be available until 7 September, after which time staff will compile results of the survey and prepare an update to the City Council. 7. Golf Course Survey In accordance with the current agreement for golf professional services with Allan Morrison, the City will conduct an annual survey to review satisfaction of services by the golf pro. This year, staff has discussed the survey with the Golf Course Advisory Committee and is expanding the survey to also receive feedback on other operations of the golf course conducted by city staff members. The results of the survey will be shared with the City Council and considered during contract discussions moving forward. Consolidated Department Reports September 8, 2016 Page 2 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Department Project Comments Status Airport AIP-21 Land Acquisition City’s legal team is in the process of serving the landowners. Ongoing Airport Minimum Standards and Rules/ Regulations Review Corrections to typos and clarification of paragraph 8- 16-7-G-4 made. Submitting for Council’s approval. Ongoing Airport Hangar Lease Rate Analysis Airport staff working on analysis for City Council’s consideration. Ongoing Airport AIP-22 Snow Removal Equipment Tentative delivery of equipment in January 2016. Ongoing Airport AIP-23 Ramp Rehabilitation Held preliminary conversations with FAA to develop scope of FY17 ramp repair project. Up to $1 million AIP grant funds expected to be available for repairs. New Community Development Building See attached chart for building permit status and comparison to previous years. Updated Community Development Building Library Expansion Committee continues to work with consultants. Updated Community Development Geographic Information Systems (GIS) Organized the bike and pedestrian counts, assisted in auto traffic turn counts. Continued to assist with data and maps for the comp plan update and transportation master plan. Assisted in compiling data for research being done by the U of I for Valley County. Working on recreation maps for the parks and rec dept. Updated Community Development Grants See attached Grant Status Report for updates. Assisted with ICount bike/ped counts. Updated Community Development McCall In Motion Workshops for McCall In Motion boat tour on September 12 2-4:45pm. There will also be a workshop on September 13 for key community initiatives. Public workshops schedule at 5:30 pm on the 13th and 10 am on the 14th. A new survey will be released on Sept. 8. Staff working on reviewing documents to date. Updated Community Development Building, Planning and Zoning Staff has archived project files and is updating the secondary archive database. Updated Consolidated Department Reports September 8, 2016 Page 3 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Community Development Planning & Zoning Commission The September 6 meeting agenda includes 1 zoning amendment, 1 subdivision plat amendment, 1 PUD amendment, 1 Vacation of Right of Way, 2 Conditional Use Permits, 5 Record of Surveys, 7 Design Reviews, 6 Scenic Route, and 2 Shoreline applications. Updated Community Development Public Art The Rotary Park railings project is completed and looks fabulous. Updated Community Development Payette River Scenic Byway (PRSB) The byway will meet with the Payette River Water Trails committee August 3 to discuss coordination of like efforts. Updated Community Development McCall Improvement Committee The McCall Improvement Committee met August 4. The first McCall in Bloom “Secret Garden Tour” was a success. The Golden Gnomes for the McCall in Bloom contestant competition were awarded on August 15. Congratulations to the Parks Department for winning the Non-Profit category for Centennial Plaza! Updated Community Development McCall Redevelopment Agency (MRA) MRA issued a Request for Proposals for the parcel owned on Pine Street. Updated Community Development Centennial Committee The Centennial Committee is working on final tasks for Plaza completion. No change Community Development Historic Pres. Commission The HPC met August 15 and 29. Work continues on the DVD project. Updated Golf Staffing At the end of the month of August there were three of us working full time and we had 12 seasonal employees. 1 of those is working part time. The staff that we have this year is working out great. The end of the month we started losing people but we have enough to get us through. Update Golf Greens The greens when through the month in good shape. We continued to work on patching #1 where we had the fertilizer burn. We still have some work to do but it is growing in. The greens held up great through a month of tournaments Update Golf Equipment We purchased a used fairway mower from Whitetail this month with LOT funds and just in time as one of our mowers hydraulics is failing. We will use parts off of it to keep the other one running until we can get a replacement next year. Update Consolidated Department Reports September 8, 2016 Page 4 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Golf Vole Damage We still seem to have a large number of Vole holes around ponds and wetlands so we are treating those so we hopefully won’t have so many this winter. We seem to have a run on those and gophers this year. Update Golf Revenue Revenue continues to be running ahead of last year and we have been busy. We are up mostly in daily greens fees. No Change Golf Club House The window and door replacement project is complete. They look great and hopefully will help with the heat this winter. Carol filed for an energy efficiency rebate from Idaho Power and we are hoping to get $1737.50 back. Complete Golf Irrigation The system has been running pretty smoothly although we ran short of well water during the last hot spell. No change Golf Chipper mulch We used the two piles of chipper mulch that we had from grinding trees and brush around the parking lot and other beds on the golf course. We are making room for more this fall. Update Golf Tournaments Tournaments are going well and are full. We seemed to have one every week this month. The Chapman was full with a waiting list so we changed to a double shotgun to let more teams in. This also left Cedar open all day for open play. The two man scramble in September has been full with a waiting list sense June. Update Golf Brush trimming Our crew has been busy cutting out dead brush and cutting lower limbs on trees. They have also been building some wildlife sanctuaries out of logs and brush to use some of the material up until we get a chipper. Update Information Systems Work focus and projects Virtual desktop infrastructure (VDI) hardware and software have been acquired after vendor delays. Pilot project for the Public Library is underway. Objectives are cost savings in desktop hardware and less labor intensive management of public access computing. Final round purchasing of replacement staff computers and network equipment for FY16 is in process. Examining cost and feasibility of moving to cloud- based email and/or office productivity suite services. Consulting with staff and other authorities for security concerns and records manageability. Updated Consolidated Department Reports September 8, 2016 Page 5 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Professional development course work for FY16 is being selected and purchased, with focus on the City’s specific hyperconverged datacenter infrastructure administration. Information Systems Facilities A challenge is facilities planning efforts across departments and funds, where IT coordination must occur early in the process. Planned and opportunistic projects to modernize data infrastructure in City facilities will continue whenever possible. Some facility networks have been operating over cabling that is nearly 20 years old and in poor condition. Tie- in to facilities planning and rehabilitation. Updated Library Upcoming programs Please see the calendar for your library’s upcoming September programs included with this report. Ongoing Library Statistics August statistics included in this report. For the next 3 months, Library statistics will come to you delayed, the following months, due to the change in Council meeting schedule. Complete Library Story Stop Every Wednesday, children ages 0-3. Makes for a crowded but fun atmosphere for families. Ongoing Library Story Time Every Thursday 10:30-11:30 a.m. Reading and art activities aid childhood development. Ages 3-5 with adult. Ongoing Library Building Expansion Survey The online survey (also available at the front desk) captured opinions of those unable to attend meetings. Survey is closed. Results were provided to consultants. Complete Library Building Expansion Library design professionals Humphries Poli presented several preliminary ideas to Committee, Board, Community Development Department, City Manager and Library staff August 29-31st. They have narrowed their work down to 2 alternatives and are now further developing the feasibility of those designs for our City campus, library and other involved departments. Humphries Poli also met with groups of students and teachers at PLMS and MDHS. They are incorporating the work of City staff and other consultants working Ongoing Consolidated Department Reports September 8, 2016 Page 6 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   for the city as they develop the library space (i.e. parking study, etc) Next visit is late September or October, TBA. Library Harry Potter Release Party Youth librarians and library patrons celebrated the latest addition to the famous Harry Potter book series. Trivia games, giveaways, and snacks. Complete Library Deconstruction Makerspace August 26th, the library conference room was transformed into a 3D printing, robot coding Mecca as kids of all ages came to enjoy deconstructing old pieces of unusable tech devices, and creating them into new pieces of jewelry. The room was packed and every inch of space on tables and floors was used! Complete Library LIBRARY sign Summer Reading Program middle school students designed a new sign for the West side of the building. Library staff thanks Parks & Rec for their help installing the sign, and we’ve gotten lots of positive feedback about this project, sponsored by McCall Artists Connection and featured in the Star News. Complete Library Summer Reading Programs Summer reading ended with a bang this month and we are all still reeling. 178 children participated, with 125 completing the program. Complete Library Summer Reading Program Survey Parent feedback included:  “Every year my kids look forward to your reading program and it is one of the highlights of their summer. It 100% encourages them to read more.”  “My daughter read new books she wouldn’t have without this program. We really appreciated this opportunity for social interaction since we homeschool.”  “Challenge was that the program was full before we could even sign up.”  “More space provided by a new/expanded library would be great for all programs.” Complete Library ESL classes Free ESL classes featured in the Star News. Our local schools are eager to send Spanish speaking parents to this free class to aid communication. Child care is provided and the class is taught by experienced volunteer teachers. Please help us spread the word to employers in the area. Ongoing Consolidated Department Reports September 8, 2016 Page 7 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Library Tech Tuesdays Casey has developed quite a following of kids who come to use the 3D printer and play board games while the printer is working. Staff are available to help the public with their e-readers any day, but Tech Tuesdays have been designated as a special time for folks to bring in their devices so we can help them log into OverDrive, our e-book application, or to print 3D items. Tuesdays, 4-6 PM. Ongoing Library Job Opening Jasmine Platt has resigned her position as Clerk I to pursue another job. We hope to hire a new person immediately. Ongoing Library Grants for digitizing local history records Scanning continues slowly with volunteers. We are applying for an Idaho Heritage Trust grant to leverage the 50% matching already granted by the LOT commission to temporarily hire someone to complete the first scanning stage of this large project. Ongoing Parks & Recreation Partnerships Summer partnerships in Progress. In Progress Parks & Recreation City Website Updating City Website to flow better with online registration page/content. Ongoing Parks & Recreation Online Registration Working with current provider to update all upcoming program offerings and learning new additional features to the site. Also working with City Communications manager on enabling more marketing/linking capabilities with TeamSideline. Ongoing Parks & Recreation Environmental Action Committee Working on Green initiative, air quality, Payette Lake water quality, and noxious weeds projects. Proposals going forward to Council for Air Quality regulations and Green Business practices to be endorsed by the City of McCall. Open seat for high school representative. In Progress Parks & Recreation Parks & Recreation Advisory Committee On hold until September In Progress Parks & Recreation Rec Social Media/ Communications Working with communications manager to streamline Rec related correspondence to interested user groups. In Progress Consolidated Department Reports September 8, 2016 Page 8 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Parks & Recreation Alternative partners/ programming Ongoing efforts to work with local private organizations to develop opportunities for additional programming. Ongoing Parks & Recreation Helmet Loaner Program/Schol arship $600 used for Helmets purchased and $400 to be used for students. Working with school to identify 10-15 scholarships based on need and whole student concept. Re-visit Fall 2016. In Progress Parks & Recreation Summer Equipment Purchases Inventory existing gear and ordering projected items needed. Complete Parks & Recreation Summer Programs All youth & Adult programs are over Complete Parks & Recreation Employees/ Volunteers PAR Director position is vacant; interviews are currently underway Administrative Assistant position is still vacant In Progress Parks & Recreation Fall Programs Currently planning Fall/Winter; Fall Soccer starts Sept 6-29; youth wrestling, volleyball skills, youth basketball, adult indoor soccer, volleyball; trips & tours to Boise this later this winter; Fall/Winter guide to come out last week of September In Progress Parks & Recreation Mountain Bike Skills Park Project is way ahead of schedule, should be completed by Saturday, September 03. Will schedule a ribbon cutting sometime in early September. In Progress Parks & Recreation Rec program overview Due to 2017 budget- reviewed programs to be cut for 2017. Possible cuts include snorkeling, fly tying, swim lessons, Mile High Mile In Progress Parks & Recreation Riverfront Park Engineering drawings for road, parking, and storm water conveyance, are almost complete – Work is scheduled for early September and through the fall. In Progress Parks & Recreation Summer/Fall transition Seasonal staff is fading out – parks crew is transitioning into fall projects and cleanup. In Progress Parks & Recreation Downtown Sidewalk Brick Repairs Will continue as time permits In Progress Parks & Recreation Parks Shop and Office Planning Identifying needs and finalizing location. In Progress Consolidated Department Reports September 8, 2016 Page 9 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   Parks & Recreation Rotary Park Construction Construction work is underway and should be completed by the end of September for phase one and mid-November for phase two. In Progress Parks & Recreation Way-finding signage Working with CD on the design and implementation of way finding signs. In Progress Police Personnel Officers Butler and Darling are currently in the first phase of the McCall Police Department’s Field Training Program. They are scheduled to attend the Idaho POST Academy September 1, 2016 – November 18, 2016. Complete Police Training No training was scheduled for August, 2016. Complete Police Training Adam Benjamin is scheduled to attend Field Training Officer training in Meridian, Idaho, September 11-16, 2016. Chief Justin Williams, Corporal Seth Arrasmith, and Officer Adam Benjamin are scheduled to attend Basic Firearms Instructor training in Meridian, Idaho, September 25-30, 2016. Ongoing Police Community Service The McCall Police Department continues to accept expired, unwanted, or unused over the counter and prescription medication during normal business hours, Monday - Friday 8:00am – 5:00pm. McCall Officers are continuing to work with the National Highway Safety Board, Idaho Transportation Department, and Idaho State Police on emphasis patrols for Seat Belt Usage, Aggressive Driving, and DUI awareness. In return McCall Police Department receives Grant Money for needed equipment. The police department is using the money to upgrade video and radar systems in the patrol cars. Ongoing PW Admin/ Engineering DEQ Water Planning Grant Water model calibration ongoing. Ongoing Consolidated Department Reports September 8, 2016 Page 10 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   PW Admin/ Engineering DEQ Wastewater Planning Grant Winter Storage Pond Groundwater Study Groundwater monitoring well drilling bids were received on 8/29. Pending contract award, wells will be constructed in September/October with sampling to begin in late October. Ongoing/ Updated PW Admin/ Engineering Utility Rate Study PW and SPF revised WW-treatment and WW- collections CIP based on new cost research. Provided updated CIP to FCS. Formal memo, spreadsheet and work session conducted with Council to discuss CIP. Ongoing/ Updated PW Admin/ Engineering Asset Management Software Training began with department heads in the water/wastewater departments, and at that time it was felt that additional data needed to be available for field work. Currently working with Elements on those additional system enhancements prior deploying to field staff Ongoing/ Updated PW Admin/ Engineering Land Use Application Development Reviews City Engineer working with Community Development of application review (engineering and PW review/approval) for 5 ROS, 6 DR, 1 SR, 1 SUB, and 12 CUP projects. Multiple pre-application meetings with developers and city staff. Ongoing/ Updated PW Admin/ Engineering Public Works Fees Staff is currently reviewing proposed fee increases to properly recover costs related to sewer disposal and ROW utility permitting. Ongoing PW Admin/ Engineering Emergency Outfall Discharge Pipe Line found to be damaged at intersection with new sewer main for Reserve on Payette. Formal letter sent to Reserve’s contractor Hess Construction by White Peterson in early September. Repair schedule pending response from Hess Construction. Ongoing/ Updated PW Admin/ Engineering Community Choices 2016 Streetscape Improvements Ongoing punch list items still being completed. Final completion anticipated by the end of September. Ongoing/ Updated PW Admin/ Engineering Transportation Master Plan Peak summer turning movement counts completed. Traffic counter deployment is ongoing. Logan Simpson team compiling transportation “Bid Ideas” for September public involvement activities. Ongoing/ Updated Consolidated Department Reports September 8, 2016 Page 11 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   PW Admin/ Engineering Edgewater Circle Water Main Final design plans completed by Horrocks. City Engineer completing DEQ review. Construction Engineering and Inspection to be completed by Crestline Eng. and Horrocks. Notice to property owners will be sent in early September. Bid opening scheduled for 9/7. Pending contract award, construction to begin in late September. New/ Ongoing PW Admin/ Engineering Drainage Management Guidelines – treatment storm update Will present resolution for County approval during September or October to allow modifications to apply to Impact Area. Ongoing/ Updated PW Admin/ Engineering Commerce Street Reconstruction Property Owner meetings completed. Horrocks preparing multiple “Complete Street” section options with associated cost estimates. Sections to be presented to Council at 9/23 work session. Ongoing/ Updated PW Admin/ Engineering Downtown Core Construction Feasibility Conceptual stormwater treatment system evaluated. Planning for upcoming city staff, council, and public meetings this fall. New/ Ongoing PW Admin/ Engineering Sewer Reuse Permit Financing Staff/JWAG reviewing/revising Annexation Agreement. Met with DEQ to review PLRWSD permit review status and discuss ownership/management permitting options for treatment and disposal facilities. New /Ongoing PW Admin/ Engineering Deinhard Bridge – Expansion Joints Horrocks and Streets Dept. received proposal from CPC to complete work. Contract awarded in late August. Work to be completed in September. New/ Ongoing PW Admin/ Engineering PW roof repair Public Works and Garland Company prepared bid specifications and conducted formal bidding for roof replacement on the PW building. Bids will be received in early September. Pending award, construction would be completed by the end of October New/ Ongoing PW Streets Right-of-Way Maintenance Crews continue working on storm drain issues around town as time allows. Ongoing/ Updated PW Streets Seal Coating Sealing coating of Mill Street parking lot is on hold until end of August. Updated Consolidated Department Reports September 8, 2016 Page 12 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   PW Streets Dust abatement Additional dust abatement materials just received, so additional abatement will be done on as needed bases. Ongoing PW Streets Street Sweeping Street sweeping continues as needed. Ongoing PW Streets Customer Complaints Customer complaints are being addressed in a timely manner with the city manager assistance when necessary. Ongoing/ Updated PW Streets Street Maintenance Crews continue to repair pot holes in the down town core. Ongoing PW Streets Emergency Call-Ins 1 emergency call out this month. Updated PW Streets Street Striping/City All painting is completed except for the Mill Street parking lot which can’t be done until it is seal coated. Updated PW Sewer Collection Manhole Inspection Inspections are going well. Ongoing PW Sewer Collection Emergency Call-Outs Duty phone employee’s responded to 3 emergency call outs for the month (lift station alarms). Ongoing/ Updated PW Sewer Collection Sewer Main Flushing Continue to flush slow-moving sewer mains. Ongoing/ Updated PW Sewer Collection Private Line Connection Inspections Received requests but was unable to perform as the camera was out for repairs. completed PW Sewer Collection Routine Lift Station Maintenance Crews perform routine system checks at every lift station twice a week. Ongoing PW Sewer Collection New Sewer Connections 6 new sewer connections for the month. Ongoing PW Sewer Treatment Routine Maintenance Performing typical maintenance duties and water testing. Ongoing/ Updated PW Sewer Treatment J-Ditch/Winter Storage Pond Pond is low enough now that we have scheduled sub- contractor to inspect and make repairs to the liner. It will be up to PLWSD to determine if they will run the pumps one more time prior to the end of irrigation season. Ongoing/ Updated Consolidated Department Reports September 8, 2016 Page 13 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   PW Sewer Treatment Wastewater Treatment Facility The current fencing at the plant does not run the full perimeter of the property, so additional wire fencing is being added. At some point we will need to budget for replacing these areas with a chain link fencing system New PW Sewer Treatment Sand Filter Testing Running sand filters again for additional data. New PW Water Distribution Main Service Line Repairs & Boil Notices Repaired line on Ernesto that required boil notice. Updated PW Water Distribution Dig Line Requests Responded to 45 dig line requests to mark both water & sewer infrastructure. Updated PW Water Distribution Emergency Call-Ins 2 emergency call ins for water issues. Ongoing/ Updated PW Water Distribution New Water Services Had 15 new water services for the month. Ongoing/ Updated PW Water Distribution Work Orders The crew responded to 11 work orders from customers and 3 from Utility Billing. Ongoing/ Updated PW Water Distribution Fire Hydrant Repairs Repaired one fire hydrant this month in Whitetail Ongoing PW Water Distribution Pre Turn-off Door Hangers Crew hung 29 door hangers for Utility Billing. Updated PW Water Distribution MXUs No MXUs were replaced this month. Updated PW Water Distribution ECRs No ECRs were replaced this month. Updated PW Water Treatment Routine Maintenance Facility components are routinely inspected and repairs are made as needed. Ongoing Consolidated Department Reports September 8, 2016 Page 14 of 26 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT   PW Water Treatment Legacy Raw Water Station Normally during the summer, the water treatment plant changes over from the Legacy Raw water station to Davis Beach, as the pumps are larger at Davis. The intake line out in the lake for Davis Beach is only 35’ deep compared to 80’ deep for Legacy Beach. Legacy delivers clearer source water to the plant. At the recommendation of SPF, we are only pulling water from Legacy, and utilizing the Eastside Water Tank at peak demand periods. So far the change in this process has run flawlessly. Will continue to monitor and compare data results for pros & cons. Updated PW Water Treatment Test Pilot Filter Task order approved by City Manager for $7573.00. SPF will design the plant schematic, provide list of needed equipment, develop standard operating procedures, and assist with setting up and analyzing test results. Updated PW Water Treatment Effluent Flows Summer flows have begun and we are now up from running 1.5 million gallons per day to a consistent out flow of over 2 million gallons per day. Ongoing PW Water Treatment Back Wash Activities Double backwash activities continue, with an employee coming in at 5:00 am each day. Updated PW Water Treatment Raw Water Chlorine Assessment Task Order in the amount of $6573.00 has been approved by City Manager for SPF to assist with developing chlorine alternatives for the raw water intake system. Each building currently stores gaseous chlorine. New Consolidated Department Reports September 8, 2016 Page 15 of 26 GRANT STATUS REPORT‐ September 8, 2016  Department Project NameProject Manager PurposeFunderAmountStatusStreets Department Mission St. Reconstruction TBD Reconstruct Mission St. from Deinhard to S. City Limits FHWA through LHTAC $1.525 million No change. Streets Department TIGER 8 Nathan Stewart/Cris Malvich Reconstruct downtown core; streets/water/sewer/sidewalks US DOT $5,843,239 NOT AWARDED. Better luck next year! Parks Mountain Bike Skills Park  Kurt Wolf Design and construct skills park on MDSD property  IDPR $11,994 Update: project nearly complete. Parks Riverfront Park Access Improvements Kurt Wolf Improve road surface, parking, and stormwater management at Riverfront IDPR $17,866 Update:  project to begin in fall, 2016. Community Development  Public Art Project Delta James Install public art in Rotary Park Idaho Commission on the Arts $10,000 Updated:  project is nearly complete. Public Works/Water  Water Master Plan update Nate Coyle Update master Plan Dept. of Environmental Quality $87,500 Revised amount:  $89,998 No Change: Project is underway.  Public Works/Sewer Groundwater StudyNate Coyle Study leakage at wastewater pond Dept. of Environmental Quality $77,000 No Change:  Project is underway.  Streets Department Commerce Street Reconstruction Nathan Stewart Reconstruction of Commerce; stormwater and sidewalks Local Highway Technical Assistance Council $100,000  No change.  Project to occur in 2017  Consolidated Department Reports September 8, 2016Page 16 of 26 $20,281$6,024$16,429$1,903$1,062$0$34,870$29,713$18,526$21,884$26,242$13,147$22,387$7,241$4,840$1,638$1,925$8,025$27,946$29,861$34,038$11,627$35,111$12,689$15,403$6,874$1,332$39$3,963$15,906$22,726$30,202$40,421$34,419$10,523$32,419$14,734$1,352$3,668$5,729$10,532$12,071$50,469$27,461$40,560$35,463$23,316$51,797$13,953$2,623$3,553$1,469$15,317$35,705$38,367$66,275$52,029$23,553$34,042$28,993$5,205$10,882$1,476$22,638$23,008$39,518$48,668$50,606$62,108$38,661$58,537$0$0$10,000$20,000$30,000$40,000$50,000$60,000$70,000123456789101112BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESTOTAL BLDG PERMIT FEES ‐PER MONTH ‐FISCAL YEAR201120122013201420152016OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPConsolidated Department Reports September 8, 2016Page 17 of 26 1234567891011122011$20,281 $26,305 $42,734 $44,637 $45,699 $45,699 $80,569 $110,282 $128,807 $150,691 $176,933 $190,0802012$22,387 $29,628 $34,468 $36,107 $38,032 $46,057 $74,004 $103,865 $137,903 $149,529 $184,640 $197,3292013$15,403 $22,277 $23,610 $23,649 $27,611 $43,517 $66,244 $96,446 $136,867 $171,286 $181,809 $214,2282014$14,734 $16,086 $19,754 $25,482 $36,014 $48,085 $98,554 $126,015 $166,575 $202,038 $225,354 $277,1502015$13,953 $16,575 $20,129 $21,598 $36,915 $72,620 $110,987 $177,263 $229,291 $252,844 $286,885 $315,8792016$5,205 $16,087 $17,563 $40,201 $63,209 $102,727 $151,395 $202,001 $264,109 $302,770 $361,307 $361,307$0$50,000$100,000$150,000$200,000$250,000$300,000$350,000$400,000BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESBLDG PERMIT FEES ‐RUNNING TOTAL ‐FISCAL YEAROCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPFY 2016 BUDGET $264,000 Consolidated Department Reports September 8, 2016Page 18 of 26 MonthFY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 TotalsOctober14,274      16,938      14,412    11,306    10,483    11,520    12,392      12,163   13,390 19,298 22,085 136,176November11,272      9,748         7,978       7,147       5,850       5,535       6,103         7,298      8,233 11,738 12,986 80,902December18,547      21,746      22,261    16,224    14,294    15,459    13,939      19,101   18,122 21,802 31,168 181,495January17,232      18,707      20,163    17,932    17,007 17,510 17,065      19,334   24,733 26,778 31,157 196,461February20,446      22,943      27,324    24,826    18,873    19,921    19,716      22,331   22,013 28,487 32,613 226,880March15,110      13,668      21,527    15,969    8,925       11,941    17,344      20,251   19,365 18,422 23,712 162,523April7,294         8,049         6,425       5,954       6,183       6,210       6,696         6,1658,719 11,641 15,255 73,336May11,994      11,230      9,368       8,595       7,335       8,074       9,461         11,113 15,390 18,711 22,047 111,271June23,442      24,611      25,426    22,248    21,491    20,728    25,352      33,681 37,000 42,541 50,287 276,520July47,654      54,276      47,052    42,408    48,747    49,843    54,214      62,187 65,335 71,296 79,729 543,012August44,024      52,948      41,089    32,480    39,398    44,505    48,919      57,546 64,959 63,598489,466September26,973      26,073      23,600    25,826    20,258    27,603    33,029      35,605 35,959 49,346304,272Total Dollars Received258,263    280,937    266,627  230,991  218,844  238,849  260,743    306,775 333,218 383,658 321,039 2,778,904LOT Actual Dollars Earned per MonthTotals represented for July are not final; there are still 3 accomodators that have yet to file their returns.Consolidated Department Reports September 8, 2016Page 19 of 26 TOURISM LOT ACTUAL PERCENTAGES AND FORECASTED DOLLARSMonth FY11 FY12 FY13 FY14 FY15Five year averageFY16 Budget dollarsFY16 Budget + Contingent dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober 4.85% 4.70% 3.96% 4.02% 5.03%4.51%15,773 19,270        22,085 40.02% 22,085        15,773         40.02%November 2.33% 2.32% 2.38% 2.47% 3.06%2.51%8,774 10,720        12,986 48.00% 35,071        24,547         42.87%December 6.51% 5.29% 6.23% 5.44% 5.68%5.83%20,372 24,889 31,168 52.99% 66,239        44,919         47.46%1st Quarter Total 44,919 54,880        66,239 47.46%January 7.37% 6.48% 6.30% 7.44% 6.98%6.91%24,166 29,524 31,157 28.93% 97,396        69,086         40.98%February 8.38% 7.48% 7.28% 6.60% 7.43%7.44%25,987 31,749        32,613 25.50% 130,009     95,073         36.75%March5.03% 6.59% 6.60% 5.81% 4.80%5.77%20,156 24,626        23,712 17.64% 153,721     115,229       33.40%2nd Quarter Total 70,310 85,900        87,482 24.42%April2.61% 2.54% 2.01% 2.61% 3.03%2.56%8,954 10,939        15,255 70.38% 168,976     124,183       36.07%May3.40% 3.59% 3.62% 4.62% 4.88%4.02%14,055 17,171        22,047 56.87% 191,023     138,237       38.18%June8.72% 9.62% 10.98% 11.10% 11.09%10.30%36,011 43,995        50,287 39.64% 241,310     174,248       38.49%3rd Quarter Total 59,019 72,105        87,589 48.41%July20.98% 20.57% 20.27% 19.60% 18.58%20.00%69,911 85,413        79,729 14.04% 321,039     244,159       31.49%August 18.73% 18.56% 18.76% 19.49% 16.58%18.42%64,397 78,676        75,000 16.46%396,039     308,557       28.35%September 11.09% 12.26% 11.61% 10.79% 12.86%11.72%40,963 50,046        56,603 38.18%452,642     349,520       29.50%4th Quarter Total 175,272      214,136      211,332 20.57%Total 100.00% 100.00% 100.00% 100.00% 100.00%100.00%349,520      427,020      452,642        138.43%349,520      427,020      483,841        Year to date the actual revenues received for FY16 are 18.57% OVER the year to date revenues for FY15 and 50.59% over the 5 year average year to date.1-Sep-16Consolidated Department Reports September 8, 2016Page 20 of 26 30 00040,000 50,000 60,000 70,000 80,000 90,000 LOT FiveYear Average Compared to FY16 Actual October November December January February March April May June July August SeptemberAverage13,753 7,780 17,685 21,098 22,493 17,472 7,882 12,550 31,860 60,575 55,946 36,163 Budget15,773 8,774 20,372 24,166 25,987 20,156 8,954 14,055 36,011 69,911 64,397 40,963FY15 Actual22,085 12,986 31,168 31,157 32,613 23,712 15,255 22,047 50,287 79,729 ‐ ‐Forecast75,000 56,603‐10,000 20,000 30,000 AverageBudgetFY15 ActualForecastConsolidated Department Reports September 8, 2016Page 21 of 26 80,000 90,000 Five Year Actuals Comparison to Average70,000 50,000 60,000 40,000 20,000 30,000 10,000 ,‐October November December January February March April May June July August SeptemberAveragesFY11FY12FY13FY14FY15FY 16ForecastConsolidated Department Reports September 8, 2016Page 22 of 26 STREETS LOT BUDGETED, ACTUAL, AND FORECASTED DOLLARSMonthTourism LOT Five year average percentageFY16 Budget dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober4.51%November2.51%December5.83%1st Quarter TotalJanuary6.91%55,313 99,990 80.77% 99,990         55,313         80.77%February7.44%59,481 100,890 69.62% 200,880       114,793       74.99%March5.77%46,135 85,253 84.79% 286,133       160,928       77.80%2nd Quarter Total 160,928 286,133 77.80%April2.56%20,494 70,337 243.21% 356,470       181,422       96.49%May4.02%32,169 97,416 202.82% 453,886       213,591       112.50%June10.30%82,423 168,375 104.28% 622,261       296,014       110.21%3rd Quarter Total 135,086 336,128 148.83%July20.00%160,017 230,955 44.33% 853,216       456,031       87.10%August18.42%147,396 243,662 65.31%1,096,878    603,427       81.77%September11.72%93,759 154,995 65.31%1,251,873    697,186       79.56%4th Quarter Total 401,172      629,612 56.94%Total100.00%697,186      1,251,873   209.47%697,186      1,460,395   1-Sep-16Consolidated Department Reports September 8, 2016Page 23 of 26 McCall Public Library 208-634-5522 www.mccall.lili.org Hours: Monday -Friday 10 -6pm; Saturday 10 -2pm; Sunday closed Library will be Closed Monday, September 5th Sun Mon Tue Wed Thu Fri Sat 28 29 30 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 31 10:30-11:00 StoryStop 1 10:30-11:30 Story Time 2 3 10:00-3:00 Huge Used Book Sale 4 5 Library CLOSED 6 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 7 10:30-11:00 StoryStop 6:00-7:00 Succession Planting 8 10:30-11:30 Story Time 9 3:30—4:30 Pokémon Safari 10 11 12 13 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 14 10:30-11:00 StoryStop 2:30—4:00pm Clase de Ingles 15 10:30-11:30 Story Time 16 17 . 18 19 20 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 7:00-9:00 Mushroom Program 21 10:30-11:00 StoryStop 2:30—4:00pm Clase de Ingles 22 10:30-11:30 Story Time 23 3:30—5:30 Makerspace 24 25 26 27 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 7:00-9:00 Mushroom Program 28 10:30-11:00 StoryStop 2:30—4:00pm Clase de Ingles 29 10:30-11:30 Story Time 30 1 1 Primary Business Address Your Address Line 2 Your Address Line 3 Your Address Line 4 Your business tag line here. Phone: 555-555-5555 Fax: 555-555-5555 E-mail: someone@example.com September 2016 Programs SPECIAL EVENTS: Huge Used Book Sale Saturday, September 3rd 10:00am – 3:00pm Fill up a bag of books for $3.00! Succession Planting Wednesday, September 7th 6:00-7:00pm Join Advanced Master Gardener Mary Fairburn, and University of Idaho Extension Melissa Hamilton as we discuss and learn about ways to stretch your garden space and season. Pokémon Safari Friday, September 9th 3:30-5:00pm Join us in this new digital craze, and learn a little about McCall history as we visit local Pokestops and Gyms. Smartphones not included. Small children will require chaperones. Stop in at the library all week for an in-house scavenger hunt and win cool Pokémon prizes! Clases de Inglés Wednesdays September14th - 28th 2:30-4:00pm Free conversational English classes are available Fall Mushroom Program with Kathy Richmond Tuesday, September 20th The Bold and Beautiful Boletes 7-8pm The Positively Peculiar Polypores 8-9pm Tuesday, September 27th Royal, Robust Russulas of the World 7 -8pm Lovely Lactarius from Around the World 8-9pm Makerspace Friday, September 23rd 3:30-5:30pm We will have several design challenges using our 3D printer, makers tools and a box full of doo-dads! ONGOING PROGRAMS: Chess Club ~ Tuesdays 4:00 pm – all ages, all levels. Board Gaming ~ First Tuesdays 3:30 -5:30pm—Play Munchkin, Forbidden Island, Monopoly and more! all ages. Story Stop ~ Wednesdays 10:30 – 11:00 am A streamlined library story time with rhymes & games for children ages 0-3 (with adult). Tech Tuesdays ~ Tuesdays— 4:00pm-5:30pm –Dedicated time for 3D printing, help with e-books, and overdrive. Children’s Story Time ~ Thursdays 10:30 - 11:30 am Ages 3-5 (with adult). Preschool stories, art, and social time. Consolidated Department Reports September 8, 2016 Page 24 of 26 Library Statistics ‐‐ FY2016 Oct‐15 Nov‐15 Dec‐15 Jan‐16 Feb‐16 Mar‐16 Apr‐16 May‐16 Jun‐16 Jul‐16 Aug‐16 Sep‐16 Totals 2 ‐ 000‐099 8 5 16 17 13 10 10 3 568 3 ‐ 100‐199 14 71510241715 3 2712 4 ‐ 200‐299 7 5 21 16 19 12 8 19 14 13 26 5 ‐ 300‐399 39 46 46 43 30 38 58 60 46 58 57 6 ‐ 400‐499 4241230712 10 5 2 7 ‐ 500‐599 22 18 24 42 38 37 37 36 48 49 48 8 ‐ 600‐699 83 81 87 88 117 86 60 68 105 84 87 9 ‐ 700‐799 64 96 46 81 53 81 59 42 63 51 66 10 ‐ 800‐899 34 36 48 27 28 21 28 25 34 42 42 11 ‐ 900‐919.9 32 34 35 48 40 63 27 41 30 18 37 12 ‐ 929‐999 65 54 37 44 63 48 36 37 40 46 41 13 ‐ Adult Fiction 699 682 692 760 665 809 671 666 764 866 940 14 ‐ Audio Books Circ Set 0283245246921 17 26 28 6 16 ‐ Biography 28 15 18 16 27 32 32 11 18 21 23 17 ‐ Board Books 103 93 81 111 148 134 116 142 127 78 105 18 ‐ CD Fiction Books 222 217 203 196 229 223 241 163 157 178 259 19 ‐ CD Junior Books 70 39 33 41 51 105 54 23 63 63 71 20 ‐ CD Music 10 000000 0 000 21 ‐ CD Non‐Fiction Books 41 38 18 15 19 42 27 28 25 28 49 22 ‐ CD YA Books 44406175 1 9610 23 ‐ Chapter books 138 109 99 126 159 169 139 134 309 278 190 24 ‐ Classic Movies 5 7 7 18 15 15 9 11 15 24 17 27 ‐ Dawn Moudy Collection 694459613 13 6 3 28 ‐ DVD 14 13779483 0 000 29 ‐ DVD Blu‐Ray 16 10 29 13 8 12 6 19 12 8 4 30 ‐ DVD Circ Set 67 104 47 16 11 29 41 19 51 52 5 31 ‐ DVD Fiction 266 325 387 307 319 388 203 145 204 231 252 32‐ DVD Kids 10 13 20 15 26 25 89 166 165 183 175 33 ‐ DVD Non‐Fiction 52 35 53 28 36 51 17 48 23 21 39 34 ‐ DVD TV Series 10 7 8 11 20 23 10 14 21 11 16 35 ‐ E Non‐Fiction 38 46 28 40 64 66 68 92 51 73 54 36 ‐ Eames Collection 6651182 3 030 37 ‐ Early Readers 153 112 151 143 164 128 112 110 235 191 122 38 ‐ Idaho Archives 1022000 0 021 39 ‐ Idaho Room 36 26 25 48 60 99 44 65 57 70 81 40 ‐ Independent Films 5 5 19 10 19 19 9 1 61018 41 ‐ Junior Biography 21 37 23 28 19 29 16 16 12 10 22 42 ‐ Junior Non‐Fiction 356 337 300 273 412 463 328 238 306 353 416 43 ‐ Junior Readers 263 285 235 189 237 263 295 288 494 498 447 44 ‐ Junior Spanish 26 29 49 21 36 37 52 15 14 13 27 45 ‐ Kit 12661271 5 3917 46 ‐ Language learning 2002200 0 032 47 ‐ Large Print 104 67 116 133 100 128 129 168 172 157 148 48 ‐ LP Circ Set 171801000 0 250 49 ‐ Magazine 45 28 28 54 33 42 50 51 69 60 68 50 ‐ Map 0100001 0 004 51 ‐ Oversized 1440174 5 443 52 ‐ Parenting 2003103 0 221 53 ‐ Professional 6020001 3 000 54 ‐ Reference 2411122 1 113 55 ‐ Spanish 10 10 17 11 13 14 5 1 423 56 ‐ Story Books 751 624 699 595 821 875 708 620 774 740 762 57 ‐ Story Collection 24 20 21 9 22 11 12 22 26 29 28 58 ‐ Y A Non‐Fiction 33 12 28 15 26 26 15 6 12 17 26 59 ‐ YA Biography 0000000 0 000 60 ‐ Young Adult Fiction 84 78 89 91 61 70 75 72 145 207 192 Consolidated Department Reports September 8, 2016 Page 25 of 26 61 ‐ Yount Adult Story Collection 0000000 0 000 Adult Circulation 2068 2057 2124 2141 2063 2453 1894 1821 2069 2201 2429 Young Adult Circulation 121 94 121 106 93 113 95 79 166 230 228 Children's Circulation 1930 1726 1724 1583 2149 2301 1978 1849 2553 2489 2408 Circulation Totals 4142 3914 3992 3859 4334 4892 4002 3776 4816 4956 5065 Attendance 2351 2132 2032 2126 2286 2445 2194 2418 2695 3578 2990 Computer Usage 630 510 459 495 320 546 502 533 624 908 961 ILL's Received 23 37 23 25 28 25 35 27 28 36 30 Reference Requests 509 439 398 412 395 452 373 411 478 612 516 Food for Fines 33 11 28 20 130 84 31 22 79 22 10 Volunteers/hrs 9/15 5/8 6/27 2/7 3/5 17/44 6/12 14/25 14/34 20/45 26/52 Adult Program Attendence 138 174 77 180 92 60 54 84 40 28 9 Young Adult Program Attendence 9 6 23 6 2 914 8 96272 Children's Program Attendence 670 483 551 587 477 740 546 578 507 466 353 Consolidated Department Reports September 8, 2016 Page 26 of 26