Loading...
HomeMy Public PortalAbout05 - Consolidated Department Reports May MEMORANDUM Please find my highlights from the month of December below: 1. Streets LOT Engineering design and planning work is moving along for Commerce Street and for future street projects within the downtown core. The City Engineer has sent correspondence to property owners along Commerce Street to outline the engineering work this summer, which will include individual communication with property owners regarding the pending improvements on the right of way. I have received one concern from a property owner regarding the impact of sidewalks and access due to the pending improvements on this road. The specific details of the concern are not yet clear to me however I will be attending a meeting with the property owner on 8 June to better understand the concern. A kick-off meeting for this project was held on 2 June with staff members and Horrocks Engineering where a timeline and public interaction process was discussed. A presentation will be provided to the City Council on 14 July prior to engagement with individual property owners and an eventual public meeting to discuss this project. 2. Sewer Rate Study As previously mentioned, the bulk of the original data request has been provided to FCS for initial rate processing. Two components remain for submission to FCS from the city which include identifying changes to O&M and a 20-year CIP projection. This work will be completed by 3 June. Staff will be conducting a meeting with representatives of PLRWSD, JUB, and SPF on Tuesday of next week to review and discuss 20-year CIPs produced by each agency as a part of this process. After this meeting the city will submit its CIP information to FCS for data processing. 3. July 4th Planning Efforts The alcohol ban within city parks has been finalized with the support of the Council. Staff has implemented the communications plan for this event, and has begun preparing final planning TO: City Council FROM: Nate Coyle DATE: 06/02/2016 RE: CITY MANAGER DEPARTMENT REPORT— MAY ____________________________________________________________________________________ CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 1 of 26 components in preparation for the 4th of July event. To date, twenty-eight non-profit and for- profit organizations are planning to take part in the 4th of July event. The city has received approximately twenty ambassadors to assist throughout the course of the day for the event. A meeting with ambassadors will be held on 8 June at 5:30 PM in the McCall Library to discuss specific roles and responsibilities for volunteers on the 4th of July. 4. Capital Plan Policy and Procedure Department heads have submitted 5-year CIPs for their respective departments, and the capital planning committee has completed its work by reviewing and prioritizing these projects into a recommended/consolidated CIP. I will be reviewing this work with the assistance of Linda Stokes, Treasurer, over the course of the next week to prepare a final draft for presentation to the Council during the 17 June budget work session. 5. Public Works Director Position Advertisement I met with Public Works line supervisors on 31 May and identified characteristics and qualifications which produce a successful Public Works Director. The advertisement to fill this vacancy will be published by 3 June, and will be advertised for forty-five days. The advertisement will be placed on multiple external sites to include the City’s website, Association of Idaho Cities, American Public Works Association, and American City Manager’s Association. A staff review team is being developed to review applications and work through the interview process. Updates will be provided when available. 6. Governance Manual Update BessieJo Wagner, City Clerk, is making final changes to the draft governance manual and will present a clean draft of this document during the 30 June Council meeting. CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 2 of 26 Department Project Comments Status Community Development Building See attached chart for building permit status and comparison to previous years. Updated Community Development Building City Hall / PD Office remodel almost complete. Punch list items remain. Updated Community Development Building Working with Library Expansion Committee on selected firm, contract review, etc. Updated Community Development Geographic Information Systems (GIS) Working with Water and Sewer staff on locating old infrastructure and mapping new construction. Creating a code to update data to our online maps automatically every night. Continued work on recreation map for the kiosk at the boat trailer parking lot. Planning this year’s South West Idaho GIS conference that the City GIS Department is organizing and hosting on July 22. Updated Community Development Grants See attached Grant Status Report for updates. Carol attended the IDPR Board meeting in Challis. Grant awards were announced and McCall was awarded funding for Riverfront Park access improvements and the Mountain Bike Skills Park. Submitted 2016 TAP application for Idaho St. Pathway. Updated Community Development Comprehensive Plan Update Stormwater Training was May 10th and included a contractor survey. The 2nd survey is still open: www.mccallcompplan2016.com Plan audit is complete and preparing for next outreach event on June 11- Community Resource Fair. Updated Community Development Building, Planning & Zoning Staff has archived project files and is updating the secondary archive database. Updated Community Development Planning & Zoning Commission The July 5 meeting agenda includes (2) Record of Survey, (6) Design Review, (5) Scenic Route, (2) Shoreline, and (1) CUP application. Updated Community Development Public Art Both the Rotary Park railings and Alpine Playhouse plaza “Goats” projects are underway. The “Goats” are scheduled to be installed the week of June 21. Updated CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 3 of 26 Community Development Payette River Scenic Byway (PRSB) The byway’s fiscal umbrella, the West Central Highlands RC&D, is no longer operational. A request will be made to the Valley County Economic Development Committee to act as fiscal nonprofit umbrella for the byway. No Change Community Development McCall Improvement Committee The McCall Improvement Committee met May 12. The McCall in Bloom Launch Party will be June 1. Updated Community Development McCall Redevelopment Agency (MRA) MRA held a special meeting will be scheduled for approval of contract for paving of Mill Street Parking lot. Next meeting is June 21. Updated Community Development Centennial Committee The Centennial Committee did not meet this month. Staff submitted a brick order for Centennial Plaza. The revenue supports ongoing maintenance. Updated. Community Development Historic Preservation. Commission The HPC will meet June 5. They are continuing to work on the McCall History DVD. A RFQ/RFP for a consultant for the Rotary Park Interpretive Sign project was released and the recommended consultant will be submitted for Council approval at the June 9 meeting. Updated Community Development Outreach/Regional Collaboration Carol has been asked to serve on a Valley County Centennial Celebration committee. No Change. Airport AIP-21 Land Acquisition Preparations resulting from action taken at May 12, 2016 Council meeting continue. Ongoing Airport Minimum Standards and Rules/Regulations Review Airport Advisory Committee has completed review of Minimum Standards and Rules/Regulations. Airport is preparing packages for Council’s consideration. Ongoing Airport Hangar Lease Rate Analysis Airport Advisory Committee has completed review of Lease Rates. Airport is preparing package for Council’s consideration. Ongoing Airport AIP-22 Snow Removal Equipment Bid opening scheduled for June 2, 2016, late question regarding environmental compliance requirements from a primary bidder may require small slip in opening date. Ongoing CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 4 of 26 Golf Staffing Staff consisted of three regular full time and 11 seasonal employees, two of which are part time only. The staff this year is working out great. The plan is to still recruit two college kids for the summer. Update Golf Greens The greens were aerified the first of the month and top dressed once to smooth them out. Mowing daily with triplexes all greens except the new green which is being walk mowed at a different height while it settles in. Receiving good comments on the new Aspen 1 green. Update Golf Equipment The equipment is running nicely. The new sprayer arrived that was paid for with LOT funds. There were some issues with it at first but discovered that it was operator error due to a learning curve. Update Golf Vole Damage Most of the seed that was planted has come up and is starting to fill in the bad areas left by the voles. Still using sand and seed to help fill in some of the holes that were left. Update Golf Course Opening Opening day was on Friday the 13th with few issues, and it’s been fairly busy since. Update Golf Club House The new flooring in the club house got in before opening. The windows are on order and should be installed in June. Will be receiving an Idaho Power grant to help with the cost of the windows. An old panel and chain link gate on the lean too shed west side of the club house was removed and replaced with freshly stained cedar fence. Update Golf Cart Paths Crack sealing the cart paths will begin at the first of the month. New Golf Irrigation There have been a number of electrical issues with the controllers on the golf course this year. Two were splices from when the irrigation system was installed. New Golf Recycle Wash Station There have been problems in the past with cut grass from the equipment getting into the irrigation pond. This year a Recycle System has been install so everything goes into the mulch pile. The pond is staying much cleaner. New CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 5 of 26 Information Systems Work Focus and Projects Second round purchasing of replacement staff computers and network equipment has begun. Data center expansion purchasing is complete, now scheduling the onsite deployment engineering. Datacenter infrastructure replacement (i.e., servers, storage, virtualization and management tools) which began during the winter is now complete and all servers have been moved to the new platform. The old platform is no longer in service. Power consumption and heat generation of servers is far less, up to 70% reduction in both. Deployment of additional field-oriented tablets for Public Works and Airport asset management is occurring. Updated Information Systems Management Capital project submission and review, and annual operating budget development are underway. InfoSys is participating in TIGER grant and comprehensive plan update processes. Did not receive a technical assistance award under the EPA “Cool and Connected” rural broadband program, but efforts to help provide infrastructure for efficient City operations and progressive economic development will continue. Updated Information Systems Facilities Planned and unplanned projects to modernize data infrastructure in City facilities will continue whenever possible. Some facility networks have been operating over cabling that is nearly 20 years old and in poor condition. Tie-in to facilities planning and rehabilitation. New Library Upcoming Programs Please see the calendar for the library’s upcoming June programs included with this report. Ongoing Library Statistics May statistics not included in this report due to the Director’s computer crashing on May 31st. Next month will include 2 stats reports. Ongoing Library Story Stop Every Wednesday, is for children ages 0-3. Makes for a crowded but fun atmosphere for families. Ongoing CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 6 of 26 Library Story Time Every Thursday 10:30-11:30 a.m. is reading and art activities to aid childhood development. Ages 3-5 with adult. Ongoing Library Seed Swap Local gardening “experts” (volunteers) came to kick off the annual Seed Swap and share seeds and advice for local gardeners. The library offers free seeds from our Seed Library in May and June. Popular event. Ongoing Library Mushrooms Master gardener from University of Idaho Extension program presented a 3-week series on foraging for local mushrooms. Very well attended. Complete Library Zentangle Rocks 25 participants came to Zen out and produce meditative patterns on river rocks in this 3D art project. Complete Library Building Expansion Committee and Board interviewed the top three firms and selected a firm with deep library experience to design the expansion of library this summer. Feeling very fortunate to be entering into negotiations with this fabulous team of Humphries Poli Architects. Ongoing Library Makerspace Grant Workshops Director Lojek and staff person Casey attended a second 3-day workshop in Boise to initiate McCall’s first ever public Makerspace with a new 3D printer, paid for by the ICFL grant. A “makerspace” is a community workshop open to the public to explore creative and tech opportunities and can include anything from sewing to soldering to 3D prints. 3D printer supplies were paid for by the Friends of the Library. Complete Library Makerspace III On May 20th, the new 3D printer was unveiled to the public at an open house demo; highly successful, with standing-room only attendance. A lovely photo was posted in the Star News. Complete Library Tech Tuesdays Library staff are available to help the public with e-readers any day, but Tech Tuesdays have been designated as a special time for folks to bring in their devices to receive help to log into OverDrive, the e-book application, and to get help with 3D printing. Tuesdays, 4-6 PM. Ongoing Library Chess Club & Board Gamers An all-ages Chess Club has expanded to include other board games. Ongoing CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 7 of 26 Library Grants for Digitizing Local History Records Scanning continues with subject files in the Idaho Room. Ongoing Library New Opening Will be hiring a summer library page to help shelve books during the Summer Reading busy season. Complete Library /GIS Mapping Libraries GIS department mapped out libraries that participate in the reciprocal loaning program (helpful to patrons). Complete Library 2nd Grade Visit Three BRMES classrooms came to learn about Summer Reading Program and filled the library and sidewalks! Complete Library ESL classes Free classes start June 6th, every Monday for folks in the community who need to learn English Starts June 6 Parks Mtn. Bike Skills Park Construction Prep. The Department is working on a design, feasibility study, and cost estimate to install a Mtn. Bike Skills Park adjacent to the skate park. Applying for a small grant to help with construction cost. In Progress -Waiting on Grant - Parks Summer Seasonal Hiring Positions have been advertised and anticipating applications soon. In Progress Parks Volleyball Court: Retaining Wall Construction and Storm Drain Outlet Repairs. Minor cleanup on the Parks side and wrap up work with contractor. In Progress Parks Riverfront Park Adjustments to construction drawings underway. Staff is in the process of applying for a Road and Bridge State Grant for improvements to the access road. In Progress Waiting on Grant Parks Wildhorse Property – Thompson Street Working with a University of Idaho graduate student on the design of interpretive panels and pathway. In Progress Parks Grant Applications Road and Bridge Grant – Riverfront; Mtn. Bike Skills Park Grant In Progress Parks City Campus Improvements Deck/boardwalk is complete to North Entrance at City Hall. Legion Hall entrance has been put on hold until spring. Complete/P ostponed CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 8 of 26 Parks Snow Removal Equipment is holding up well and staff will continue to monitor and open up access to facilities to expedite spring melt. On Going Parks Downtown Sidewalk Brick Repairs Project is 75% complete and staff will continue to work on as time allows. Will resume in the spring. In Progress Parks Parks Shop and Office Planning Identifying needs and finalizing location. In Progress Parks Rotary Park Construction Documents and Bid Package Working on construction documents and details. Development of bid packet. (May Bid Open) Working on 404 Permit for encroachment at the high water mark. (Submitted) In Progress Parks Summer Seasonal Hiring Process Began advertising for spring and summer help In Progress Parks Spring Cleanups As areas become accessible staff will resume projects and begin cleanups. In Progress Parks Way-Finding Signage Working with CD on the design and implementation of way finding signs. In Progress Recreation Partnerships Summer partnerships in Progress. In Progress Recreation City Website Updating City Website to flow better with online registration page/content. Ongoing Recreation Online Registration Working with current provider to update all upcoming program offerings and learning new additional features to the site. Also working with City Communications manager on enabling more marketing/linking capabilities with TeamSideline. Ongoing Recreation Assist Parks Crew Working with Parks crew to help with Spring projects once conditions allow. Complete Recreation Environmental Action Committee Working on Green initiative, air quality, Payette Lake water quality, and noxious weeds projects. Proposals going forward to Council for Air Quality regulations and Green Business practices to be endorsed by the City of McCall. Open seat for high school representative. In Progress Recreation Gold Glove Park ADA walkway and additional bathroom hand dryers upcoming. Spring landscaping with city and donated funds to take place this Spring. In Progress CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 9 of 26 Recreation Recreational Social Media and Communications Working with admin assistant and communications manager to streamline Rec related correspondence to interested user groups. In Progress Recreation Alternative Partners and Programming Ongoing efforts to work with local private organizations to develop opportunities for additional programming. Ongoing Recreation Spring/Summer Programs Programs: Boys Baseball – In progress Girls Softball – In progress Traveling ASA – In progress Youth Spring Soccer – Complete Summer Programs – All marketing, coordination, and updating website-complete 4th of July Celebration – Planning in progress In Progress Recreation Helmet Loaner Program and Scholarship Helmets purchased and working with school to identify (10) scholarships based on need and whole student concept. In Progress Recreation Summer Equipment Purchases Inventory existing gear and ordering projected items needed. In Progress Parks & Rec Summer Employees/ Volunteers Contacting instructors, coaches and umpires from last summer about current openings. Seasonal employees hired and training is ongoing. In Progress Police Personnel The McCall Police Department is currently recruiting for the position of Patrol Officer. Testing is scheduled for June 4, 2016. Ongoing Police Personnel Officer Christian Wann had been promoted to Patrol Sergeant. Complete Police Training Chief Justin Williams attended the FBI Executive Command College May 9-14, 2016. Lorraine Brush is scheduled to attend Property Room Management, May 17-18, 2016. Sandy Ryska attended International Association of Property and Evidence training May 24-25, 2016. Complete CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 10 of 26 Police Training Pete Rittenger is schedule to attend Verbal Excellence Training June 6, 2016. Det. Brian Koch and Sandy Ryska are scheduled to attend Investigating Sex Crimes, June 12-13, 2016. Ongoing Police Community Service The McCall Police Department continues to accept expired, unwanted or unused over the counter and prescription medication during normal business hours, Monday - Friday 8:00am – 5:00pm. McCall Officers are continuing to work with the National Highway Safety Board, Idaho Transportation Department and Idaho State Police on emphasis patrols for Seat Belt Usage, Aggressive Driving, and DUI awareness. In return McCall Police Department receives Grant Money for needed equipment. The police department is using the money to upgrade video and radar systems in the patrol cars. Ongoing PW Admin/ Engineering DEQ Water Planning Grant Fire flow testing for water model calibration scheduled for June 22/23. Ongoing PW Admin/ Engineering DEQ Wastewater Planning Grant The revised Quality Assurance Project Plan and Groundwater Monitoring Plan have been submitted to IDEQ/WQD for review. It is expected that new monitoring wells will be installed in June Ongoing/ Updated PW Admin/ Engineering Utility Rate Study PW and SPF are finalizing CIP costs. Review meeting with PLRWSD/JUB scheduled for June 7 to evaluate/concur for work completed by both agencies. Final submittals to FCS to be completed during mid-June. Ongoing/ Updated PW Admin/ Engineering Asset Management Software Public Works continues to coordinate with the Parks Department to implement Elements and has introduced the new Airport Manager to the benefits of Elements. Ongoing/ Updated PW Admin/ Engineering Land Use Application Development Reviews City Engineer is working with Community Development on application review (engineering and PW review/approval) for (3) ROS, (6) DR and (1) SUB/PUD projects. Multiple pre-application meetings with developers and city staff. Ongoing/ Updated PW Admin/ Engineering Public Works Fees Staff is currently reviewing proposed fee increases to properly recover costs related to sewer disposal and ROW utility permitting. New/ Updated CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 11 of 26 PW Admin/ Engineering Emergency Outfall Discharge Pipe PW is compiling an engineer’s estimate for relocation to compare against the cost of repairing the damage pipe in place. Analysis to be completed by mid-June. Ongoing/ Updated PW Admin/ Engineering Community Choices 2016 Streetscape Improvements Construction began on May 16. Paving is scheduled for June 3. Work will be restricted around Alpine Playhouse during 7 Devils Playwright Conference (6/5 – 6/19) Ongoing/ Updated PW Admin/ Engineering Fir Street Boat Ramp/Volleyball Court Retaining Wall Project is complete. Completed PW Admin/ Engineering Transportation Master Plan Low season traffic counts have been conducted at (22) locations and will continue through mid-June. Parking lot capacity and turning movement data collection will occur in June Ongoing/ Updated PW Admin/ Engineering Construction Site Best Management Practices Training Course was held at North Fork Lodge on May 10. Sixty participants attended the course. Field training was completed at Riverfront Park with assistance from Syman Co., and Construction Specialty Supply. Completed PW Admin/ Engineering Drainage Management Guidelines: Treatment Storm Update Will present resolution for County approval during June or July to allow modifications to apply to Impact Area. Ongoing/ Updated PW Admin/ Engineering ITD- Transportation Alternatives Program Grant Application City Engineer and Grant Coordinator prepared and submitted $375K grant application for Idaho Street Pathway development. Received assistance from Horrocks Engineering. for cost estimate development. New/ Completed PW Admin/ Engineering Commerce Street Reconstruction Kick-off meeting with staff and engineering team scheduled for June 2. Additional letters sent to property owners outlining project timeline. New/ Ongoing PW Admin/ Engineering Downtown Core Construction Feasibility Initial project kickoff meeting held May 2. New/ Ongoing PW Streets Street Striping Bids Contract awarded to Curtis Clean Sweep. Painting will begin later this month. New CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 12 of 26 PW Streets Right-of-Way Maintenance Crews continue working on storm drain issues around town. With the melting of the snow, there has been the removal of the additional trees that came down in December. Ongoing/ Updated PW Streets Crack Sealing Crack Sealing was performed throughout town, and is now completed New/ Completed PW Streets Dust abatement Crews began grading and applying dust abatement materials on our dirt/gravel roadways. New/ Ongoing PW Streets Street Sweeping Street sweeping continues as needed. New/ Ongoing PW Streets Customer Complaints Customer complaints surrounding pot holes, leaning trees, and property damage sustained by snow removal activities are being addressed with a call back or a face to face meeting. Ongoing/ Updated PW Streets Property Damage Claims Due to the amount of snow, there has been a higher than normal property damage complaints received. The home owners are being referred to the City Clerk for processing of a claim through ICRMP. New/ Completed PW Streets Street Maintenance Crews continue to repair pot holes in the down town core. Ongoing PW Streets Mill Street Stormwater Upgrade Crew began completing needed upgrades to the Mill Street stormwater system. The goal is to see completion by end of June. Updated PW Streets Emergency Call-Ins Responded to one emergency call out from dispatch for tree down at 3rd and Park St. Updated PW Streets Employee Training Sent three of the newer employees to the Roads 101 training class in Boise. Completed PW Sewer Collection Manhole Inspection Inspections are going well. Lines are showing much less clear water in lines. This would correlate directly with homeowners in lower areas not needing to use sump pumps. New/ Ongoing PW Sewer Collection Emergency Call-Outs Duty phone employee’s responded to 10 emergency call outs for the month (lift station alarms). Ongoing/ Updated PW Sewer Collection Sewer Main Flushing Continue to flush slow-moving sewer mains. Ongoing/ Updated CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 13 of 26 PW Sewer Collection Line Cleaning Employed Pipeline Service to hydro clean and camera sewer lines. Main line down Commerce Street was cleaned & camera to aid in design of the reconstruction. Then the main line from Ice cream Alley to 1st St, up to Lake Street and all the way down to the bridge was cleaned. The total cost was $6,414.90. New/ Completed PW Sewer Collection Routine Lift Station Maintenance Crews perform routine system checks at every lift station twice a week. Ongoing PW Sewer Collection New Sewer Connections Two new sewer connections for the month. New/ Ongoing PW Sewer Collection Private Service Lines There were (5) dig lines for private sewer line obstructions. The crew responded quickly to locate and mark our water & sewer lines before the contractor could dig. New PW Sewer Treatment Sewer Pond Testing Steve Harris from H&S Environmental met with WW Plant Manager LaFay for two days this month and completed in depth testing and analysis of the treatment ponds. The findings report will be presented to Council and supplied to SPF for rate study data. New/ Completed PW Sewer Treatment Routine Maintenance Performing typical maintenance duties and water testing. Ongoing/ Updated PW Sewer Treatment J-Ditch/Winter Storage Pond Pond level continues to rise. There has been communication with the District on when they expect to start discharging to farmers. Ongoing/ Updated PW Sewer Treatment Ground Maintenance General grounds maintenance has begun, which should be completed by end of June New PW Sewer Treatment Winter Storage Pond Began summer prep at the winter storage pond in preparation for PLWSD running of the J-Ditch system. New/ Continuing PW Water Distribution Edgewater Circle Working with plumber to camera lines and surveyor to mark them. Information provided to Horrocks to complete new water line design New/ Ongoing CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 14 of 26 PW Water Distribution Main Service Line Repairs None for the month. Updated PW Water Distribution Dig Line Requests Responded to (66) dig line requests to mark both water & sewer infrastructure. New/ Ongoing PW Water Distribution Emergency Call-Ins Two emergency call-ins for the month due to water issues. Ongoing/ Updated PW Water Distribution New Water Services Had four new water services for the month. Ongoing/ Updated PW Water Distribution Work Orders The crew responded to (39) work orders from customers and (12) from Utility Billing. Ongoing/ Updated PW Water Distribution Pre Turn-off Door Hangers Crew hung (31) door hangers for Utility Billing. New/ Ongoing PW Water Distribution MXUs Two MXUs were replaced this month. Ongoing/ Updated PW Water Distribution ECRs Three ECRs were replaced this month. Ongoing/ Updated PW Water Treatment Boilers Carrier came up and performed a thorough diagnostic service on boiler #1. It involved direct communication with the manufacture to make sure all areas were looked at. So far it has been working like it should, and the same service will be completed on boiler #2 sometime in the fall. Completed PW Water Treatment Davis Beach Pump received and reinstalled. After some minor line replacement, it was tested and all went well. Completed PW Water Treatment Intake Lines/ Raw Water Buildings Will be checking in with SPF on their recommendation for additional work needed on the intake lines. Hope to have their comments in the next 60 days. Completed CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 15 of 26 PW Water Treatment Test Pilot Filter Approval was given to construct a test pilot filter at the water treatment plant to perform chemical testing without disrupting current water production. This is being done to ascertain whether the current chemical disinfecting dosages, are correct or need to be adjusted. New/ Ongoing PW Water Treatment Effluent Flows Summer flows have begun and are up from running between 400 to 600 thousand gallons per day to a consistent out flow of 1.5 million gallons per day. It is expected to increase once yard irrigation begins. New/ Ongoing PW Water Treatment Back Wash Activities Treatment backwashes have increased from once a day to twice a day. This will continue until flow demands decrease. New/ Completed CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 16 of 26 GRANT STATUS REPORT- June 9, 2016 Department Project Name Project Manager Purpose Funder Amount Status Streets Department Idaho Street Pathway Nathan Stewart Construct a 10’ wide detached pathway along Idaho St. FHWA via ITD $356,500 NEW:Submitted June 1. Decisions to be made by end of June. Streets Department TIGER 8 Nathan Stewart/Cris Malvich Reconstruct downtown core; streets/water/sewer/sidewalks US Department of Transportation $5,843,239 NEW: Announcement to be made in fall, 2016 Information Systems Cool & Connected David Simmonds Technical assistance for broadband development USDA/EPA Federal team to provide Technical assistance Updated: NOT FUNDED Parks Mountain Bike Skills Park Kurt Wolf Design and construct skills park on MDSD property Idaho Department of Parks and Recreation $11,994 Update: AWARDED! Parks Riverfront Park Access Improvements Kurt Wolf Improve road surface, parking, and stormwater management at Riverfront Idaho Department of Parks and Recreation $17,866 Update: AWARDED! Community Development Alpine Playhouse Public Art Delta James Install public artwork near Alpine Playhouse Idaho Commission on the Arts $10,000 Updated: Delta secured funding for pavers Streets McCall Redevelopment Area Sidewalks Nathan Stewart Sidewalks in MRA district Federal Highways/ITD $198,000 See PW report for update. Community Development Public Art Project Delta James Install public art in Rotary Park Idaho Commission on the Arts $10,000 Updated: extension request submitted Public Works/Water Water Master Plan update Peter Borner Update master Plan Dept. of Environmental Quality $87,500 Revised amount: $89,998 No Change: Project is underway. Public Works/Sewer Groundwater Study Peter Borner Study leakage at wastewater pond Dept. of Environmental Quality $77,000 No Change: Project is underway. CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016Page 17 of 26 Streets Department Commerce Street Reconstruction Peter Borner Reconstruction of Commerce; stormwater and sidewalks Local Highway Technical Assistance Council $100,000 Project to occur in 2017 CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016Page 18 of 26 $20,281$6,024$16,429$1,903$1,062$0$34,870$29,713$18,526$21,884$26,242$13,147$22,387$7,241$4,840$1,638$1,925$8,025$27,946$29,861$34,038$11,627$35,111$12,689$15,403$6,874$1,332$39$3,963$15,906$22,726$30,202$40,421$34,419$10,523$32,419$14,734$1,352$3,668$5,729$10,532$12,071$50,469$27,461$40,560$35,463$23,316$51,797$13,953$2,623$3,553$1,469$15,317$35,705$38,367$66,275$52,029$23,553$34,042$28,993$5,205$10,882$1,476$22,638$23,008$39,518$48,668$50,606$0$0$0$0$0$10,000$20,000$30,000$40,000$50,000$60,000$70,000123456789101112BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESTOTAL BLDG PERMIT FEES ‐PER MONTH ‐FISCAL YEAR201120122013201420152016OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 19 of 26 1234567891011122011$20,281 $26,305 $42,734 $44,637 $45,699 $45,699 $80,569 $110,282 $128,807 $150,691 $176,933 $190,0802012$22,387 $29,628 $34,468 $36,107 $38,032 $46,057 $74,004 $103,865 $137,903 $149,529 $184,640 $197,3292013$15,403 $22,277 $23,610 $23,649 $27,611 $43,517 $66,244 $96,446 $136,867 $171,286 $181,809 $214,2282014$14,734 $16,086 $19,754 $25,482 $36,014 $48,085 $98,554 $126,015 $166,575 $202,038 $225,354 $277,1502015$13,953 $16,575 $20,129 $21,598 $36,915 $72,620 $110,987 $177,263 $229,291 $252,844 $286,885 $315,8792016$5,205 $16,087 $17,563 $40,201 $63,209 $102,727 $151,395 $202,001 $202,001 $202,001 $202,001 $202,001$0$50,000$100,000$150,000$200,000$250,000$300,000$350,000BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESBLDG PERMIT FEES ‐RUNNING TOTAL ‐FISCAL YEAROCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 20 of 26 STREETS LOT BUDGETED, ACTUAL, AND FORECASTED DOLLARSMonthTourism LOT Five year average percentageFY16 Budget dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober4.51%November2.51%December5.83%1st Quarter TotalJanuary6.91%55,313 100,785 82.21% 100,785       55,313         82.21%February7.44%59,481 102,016 71.51% 202,801       114,793       76.67%March5.77%46,135 84,829 83.87% 287,630       160,928       78.73%2nd Quarter Total 160,928 287,630 78.73%April2.56%20,494 69,890 241.03% 357,520       181,422       97.07%May4.02%32,169 55,248 71.74%412,768       213,591       93.25%June10.30%82,423 141,556 71.74%554,324       296,014       87.26%3rd Quarter Total 135,086 266,694 97.43%July20.00%160,017 274,818 71.74%829,142       456,031       81.82%August18.42%147,396 253,142 71.74%1,082,284    603,427       79.36%September11.72%93,759 161,025 71.74%1,243,309    697,186       78.33%4th Quarter Total 401,172      688,985 71.74%Total100.00%697,186      1,243,309   197.07%697,186      1,373,944   2-Jun-16CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 21 of 26 TOURISM LOT ACTUAL PERCENTAGES AND FORECASTED DOLLARSMonth FY11 FY12 FY13 FY14 FY15Five year averageFY16 Budget dollarsFY16 Budget + Contingent dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober 4.85% 4.70% 3.96% 4.02% 5.03%4.51%15,773 19,270        22,085 40.02% 22,085        15,773         40.02%November 2.33% 2.32% 2.38% 2.47% 3.06%2.51%8,774 10,720        12,986 48.00% 35,071        24,547         42.87%December 6.51% 5.29% 6.23% 5.44% 5.68%5.83%20,372 24,889 31,168 52.99% 66,239        44,919         47.46%1st Quarter Total 44,919 54,880        66,239 47.46%January 7.37% 6.48% 6.30% 7.44% 6.98%6.91%24,166 29,524 31,157 28.93% 97,396        69,086         40.98%February 8.38% 7.48% 7.28% 6.60% 7.43%7.44%25,987 31,749        32,613 25.50% 130,009     95,073         36.75%March5.03% 6.59% 6.60% 5.81% 4.80%5.77%20,156 24,626        23,699 17.58% 153,708     115,229       33.39%2nd Quarter Total 70,310 85,900        87,469 24.41%April2.61% 2.54% 2.01% 2.61% 3.03%2.56%8,954 10,939        15,255 70.38% 168,963     124,183       36.06%May3.40% 3.59% 3.62% 4.62% 4.88%4.02%14,055 17,171        19,123 36.06%188,086     138,237       36.06%June8.72% 9.62% 10.98% 11.10% 11.09%10.30%36,011 43,995        48,996 36.06%237,082     174,248       36.06%3rd Quarter Total 59,019 72,105        83,374 41.27%July20.98% 20.57% 20.27% 19.60% 18.58%20.00%69,911 85,413        75,000 7.28%312,082     244,159       27.82%August 18.73% 18.56% 18.76% 19.49% 16.58%18.42%64,397 78,676        75,000 16.46%387,082     308,557       25.45%September 11.09% 12.26% 11.61% 10.79% 12.86%11.72%40,963 50,046        55,735 36.06%442,817     349,520       26.69%4th Quarter Total 175,272      214,136      205,735 17.38%Total 100.00% 100.00% 100.00% 100.00% 100.00%100.00%349,520      427,020      442,817        136.06%349,520      427,020      475,557        Year to date the actual revenues received for FY16 are 22.25% OVER the year to date revenues for FY15 and 56.16% over the 5 year average year to date.2-Jun-16CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 22 of 26 MonthFY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 TotalsOctober14,274     16,938     14,412   11,306   10,483   11,520   12,392     12,163   13,390 19,298 22,085 136,176November11,272     9,748       7,978     7,147     5,850     5,535     6,103       7,298     8,233 11,738 12,986 80,902December 18,547     21,746     22,261   16,224   14,294   15,459   13,939     19,101   18,122 21,802 31,168 181,495January 17,232     18,707     20,163   17,932   17,007 17,510 17,065     19,334   24,733 26,778 31,157 196,461February 20,446     22,943     27,324   24,826   18,873   19,921   19,716     22,331   22,013 28,487 32,613 226,880March 15,110     13,668     21,527   15,969   8,925     11,941   17,344     20,251   19,365 18,422 23,699 162,523April 7,294       8,049       6,425     5,954     6,183     6,210     6,696       6,1658,719 11,641 15,255 73,336May11,994     11,230     9,368     8,595     7,335     8,074     9,461       11,113 15,390 18,711111,271June23,442     24,611     25,426   22,248   21,491   20,728   25,352     33,681 37,000 42,541276,520July47,654     54,276     47,052   42,408   48,747   49,843   54,214     62,187 65,335 71,296543,012August44,024     52,948     41,089   32,480   39,398   44,505   48,919     57,546 64,959 63,598489,466September26,973     26,073     23,600   25,826   20,258   27,603   33,029     35,605 35,959 49,346304,272Total Dollars Received258,263  280,937  266,627 230,991 218,844 238,849 260,743  306,775 333,218 383,658 168,963 2,778,904LOT Actual Dollars Earned per MonthCONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 23 of 26 70,00080,000 Five Year Actuals Comparison to Average60,000 70,000 50,000 30 00040,000 20,000 30,000 10,000 ‐October November December January February March April May June July August SeptemberAveragesFY11FY12FY13FY14FY15FY 16ForecastCONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 24 of 26 30,000 40,000 50,000 60,000 70,000 80,000 LOT FiveYear Average Compared to FY16 Actual October November December January February March April May June July August SeptemberAverage13,753 7,780 17,685 21,098 22,493 17,472 7,882 12,550 31,860 60,575 55,946 36,163 Budget15,773 8,774 20,372 24,166 25,987 20,156 8,954 14,055 36,011 69,911 64,397 40,963FY15 Actual22,085 12,986 31,168 31,157 32,613 23,699 15,255 ‐‐‐‐‐Forecast19,123 48,996 75,000 75,000 55,735‐10,000 20,000 AverageBudgetFY15 ActualForecastCONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016 Page 25 of 26 McCall Public Library 208-634-5522 www.mccall.lili.org Hours: Monday -Friday 10 -6pm; Saturday 10 -2pm; Sunday closed Sun Mon Tue Wed Thu Fri Sat 29 30 31 4:00–6:00 Chess Club 4:00-5:30 Tech Tuesday 1 10:30-11:00 StoryStop 2 10:30-11:30 Story Time 3 4 5 6 4:30—6:00pm Classe de Ingles 7 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 8 10:30-11:00 StoryStop 9 10:30-11:30 Story Time Summer Reading Program reading logs can begin 10 11 12 13 4:30—6:00pm Classe de Ingles 14 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 15 10:30-11:00 StoryStop 16 10:30-11:30 Story Time 7:-9 Noxious Weed Awareness Program 17 3:30-5:30 Mak- erspace 18 . 19 20 4:30—6:00pm Classe de Ingles 21 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 22 10:30-11:00 StoryStop 23 10:30-11:30 Story Time 24 25 10:00—2:00 Kaleidoscope of Color 26 27 4:30—6:00pm Classe de Ingles 28 4:00– 6:00 Board Games 4:00-5:30 Tech Tuesday 29 10:30-11:00 StoryStop 30 10:30-11:30 Story Time 10:00—12:00pm Great Books Book Club 1 Primary Business Address Your Address Line 2 Your Address Line 3 Your Address Line 4 Your business tag line here. Phone: 555-555-5555 Fax: 555-555-5555 E-mail: someone@example.com June 2016 Programs SPECIAL EVENTS: Clases de Ingles Mondays 4:30-6:00pm Free conversational English classes are available every Monday starting June 6th - July 25th (no class July 4th) McCall Library Summer Reading Program Ready, Set, READ! Thursday, June 9th Reading logs can begin today. Schools out, so start reading to earn cool stuff! Keep in mind, our programs start July 12th—August 10th. Sign up for the Summer Reading Program at: 2016readysetread.eventbrite.com Noxious Weed Awareness Program Thursday, June 16th 7:00—9:00pm Join us for an informative lecture about the vari- ety of noxious weeds affecting the McCall area. There will also be time Q&A and discussion fol- lowing the lecture. Makerspace Friday, June 17th 3:30-5:30pm Come witness our Makerspace in full production mode! 3D printing, coding robots and so much more! Great Books Club Thursday, June 30th 10:00-12:00pm Call Barb at 634-6005 VISIT US AT: Kaleidoscope of Color Saturday, June 25th 10:00-2:00pm ONGOING PROGRAMS: Chess Club ~ Tuesdays 4:00 pm – all ages, all levels. Board Gaming ~ First Tuesdays 3:30 -5:30pm—Play Munchkin, Forbidden Island, Monopoly and more! all ages. Story Stop ~ Wednesdays 10:30 – 11:00 am A streamlined library story time with rhymes & games for children ages 0-3 (with adult). Tech Tuesdays ~ Tuesdays— 4:00pm-5:30pm -Bring in your device for help with e-books and overdrive. Children’s Story Time ~ Thursdays 10:30 - 11:30 am Ages 3-5 (with adult). Preschool stories, art, and social time. CONSOLIDATED DEPARTMENT REPORT JUNE 9, 2016Page 26 of 26