HomeMy Public PortalAbout03 - Consolidated Dept Report MarchCity Manager Department Report 1 of 3 MEMORANDUM TO: City Council FROM: Nate Coyle DATE: 04/14/2016 RE: CITY MANAGER DEPARTMENT REPORT— MARCH ____________________________________________________________________________________ Council Members, Please find my highlights from the month of December below: 1.Streets LOT Engineering design and planning work has begun for Commerce Street and for future street projects within the downtown core. Updates on the completion status and timeline of these engineering efforts will be provided as we progress through the summer. Revenue collection amounts remain strong and indicate an annual collection amount above the conservative estimate of $800,000 per year. As mentioned to the Council we have recently received notification of award of an LHTAC grant in the amount of $100,000 for the Commerce Street project within FY17. On a separate but related note, staff members have received very positive feedback about the performance of last year’s Tiger Grant Application through a recent conversation with administrators from the grant process. Our staff is excited to submit another application this year with an intent to identify our new funding source provided through the Streets LOT as an additional incentive for award. Carol Coyle will present this proposal to the Council on 14 April. 2.Sewer Rate Study A contract for sewer rate study services will be finalized by 8 April, and a data request from FCS Group has been received by city staff. I met with our Public Works Director and Treasurer on 6 April to develop a timeline and expectation for submittal of all requested data to FCS Group. Pending our ability to quick-turn data back to FCS, the group has indicated that the rate study process could be expedited with intial rate indiciations to be available by June. I will keep the Council informed about our progress in relation to this timeline. 3.Sewer Disposal Planning Efforts As I type this report, I am still working to find an acceptable date and time for a joint meeting between the City Council and PLRWSD Board to receive a presentation from bond counsel (Nick Miller). Other attendees at this meeting will include a DEQ Representative, consultant engineers, and Bill Gigray from White Peterson. Based on information we have received to date, staff is working with JUB to provide an updated process timeline which will show the following components: - Consolidation Planning: Remaining planning components for discussion, finalization of a draft agreement, and presentation to both governing bodies for discussion. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 1 of 39 2 of 3 - Reuse Process Planning: Completion of a rate study, community engagement plan/process, process for obtaining bonding authority, and finalization of the preliminary engineering report and planning documents. - Project Design/Bid/Award/Commencement. Staff has provided expected dates for completion of these components and the timeline will be discussed at the upcoming JWAG meeting then shared with Council and PLRWSD Board members. 4. July 4 th Planning Efforts An ordinance to amend code and resolution for ban of alcohol within McCall city parks will be presented on 14 April. Erin Greaves and Dennis Coyle have continued to receive requests for participation within the venue from volunteers and vendors that fit the family-friendly theme for the event. Local knowledge of July 4th events seems strong, however a media plan (with strong attention given to the Boise market) has been finalized by Erin Greaves through a partnership with IDPR, and will launch across social media, radio, and printed media in May. 5.Capital Plan Policy and Procedure Council recently approved a Capital Asset Management Policy providing the framework for development of a 5-year capital plan for the city. As promised, I have developed an internal procedure to govern the process for developing a comprehensive 5-year capital plan to be carried to the City Council for adoption. I have attached the procedure to this report for awareness of the Council. The procedure has been discussed and vetted across all department heads. Of note, the procedure calls for a process to commence early in each calendar year to provide a method for adopting a capital plan prior to the budget development process. Our timeline for this process is obviously condensed this year, however Linda and I are targeting the following timeline this year: - 5-year capital needs submitted by Department Heads by 29 April. - Capital Peer Review Committee formed and to commence work on 3 May. - Recommendation of prioritized/balanced Capital Plan to City Manager by 1 June. - Draft Capital Plan then integrated into the budget process for discussion at the June budget work session with the Council. 6.Other House-Cleaning Discussions I have been working with our senior staff leaders on two other internal/house cleaning fuctions: A. I enlisted the help of Carol Coyle in earlier this year (in January) to help review the way in which we coordinate projects or initiatives within the city. Carol’s findings have led us to the development of a project coordination process. This process will be for the internal purpose of ensuring that specific projects or initiatives have been reviewed by every department, and that concerns or comments from each department are consolidated and available for review by the City Manager before action is taken or approval is sought by City Council. This type of process is common within many government organizations and we have borrowed some best practice guidelines from other government agencies in the development phase. The outcome, once implemented, will be better internal communication among our departments, a reduction in missed coordination opportunites or unforeseen impacts from these projects, and stronger awareness and communication of ongoing projects/efforts. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 2 of 39 3 of 3 B. As mentioned to the Council, Erin Greaves has been working to develop a communications procedure which will do the following: - Provide general guidelines for the roles and responsibilities of the communications manager. - Develop a standardization in many of our communication processes. - Identify methods for standardizing communication products produced/distributed by the city. A draft procedure has been developed and is being reviewed by Department Heads. Once the draft is finalized, I will share this document with the Council for your awareness and/or input in the procedure. Specifically, I am interested in the Council’s interaction within some of our specific communication processes (such as communication or notification of crisis scenarios). 7.Golf Pro Contract Renewal The existing 5-year contract for Golf Professional services will expire on October 31, 2017. This contract has a provision for a subsequent 5-year agreement, and Allan Morrison has voiced interest in negotiating of another term. I will begin reviewing and negotiating terms of the contract with Allan Morrison in May of this year with an expectation of bringing a draft contract to the Council for initial discussions this summer. Of note, the Golf Advisory Committee has already provided me with recommendations for consideration in revision of this contract. I will seek their input on the provisions of this agreement to ensure their comments are available for the Council in our early discussions. The Golf Advisory Committee has also asked to complete an analysis of potentially converting the Golf Professional position to a full-time city position. There are a number of golf courses that have successfully made this transition and found there to be efficiencies with having a full-time position to fill this role. I will attempt to review this information to determine feasibleness or benefit in parallel to the contract process. If there seems to be value in considering this option I will discuss this option with the Council. If indeed there is good value here, we could also consider planning a transition to occur at the end of the upcoming 5-year contract to allow sufficient time for planning, funding of a buy-out, and implementation of the transition plan. 8. Governance Manual Update BessieJo has been hard at work revising the Governance Manual following our initial discussions. We reviewed the existing product and identified a number of additional changes to be made to the draft on 6 April. I expect a revised and streamlined manual to be in front of the Council within a month’s time. 9. Facility Planning Update Staff members are preparing a follow-up presentation to the Council regarding city campus facility planning during the 28 April Council meeting. This presentation will answer questions provided by the Council during the initial facility planning work session, and will also provide better fidelity of cost estimates for potential renovation of the Annex site and facility. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 3 of 39 5-Year Capital Planning Procedure Table of Contents Definitions and Terms Purpose Statement Capital Needs Assessment Capital Plan Request Sheets Peer Review Committee Structure/Purpose o Project Ranking Priorities o Project Ranking in the 5-Year Capital Plan o Development of 5-Year Capital Plan o Approval Process Attachments: o Attachment 1 – Capital Asset Management Planning Policy o Attachment 2 – Capital Needs Worksheets o Attachment 3 – Project Priority Scoring Criteria CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 4 of 39 Definitions and Terms Capital Asset – Land, improvements to land, easements, buildings, building improvements, vehicles, machinery, equipment, works of art and historical treasures, infrastructure, and all other tangible or intangible assets that are used in operations that have an initial useful life in excess of one year, and have an initial, individual cost of more than $10,000. Capital Improvement Plan –The Capital Improvement Plan (CIP) is a tool used to establish, forecast and review the City’s major capital projects needs over a period of several years for the systematic improvement, maintenance and replacement of the City’s infrastructure. Additionally, the CIP is used to identify potential funding sources, prioritize projects and set forth a timeline for funding and completing those projects. Capital Improvement Project – A project that includes the acquisition or construction of a capital asset or group of capital assets that meets the $25,000 threshold for Capital Improvement Projects and has an estimated useful life of greater than five years. Capital Outlay – The total of all capital asset acquisitions during a period of time. Capital outlay for a particular fiscal year would include all Capital Improvement Project expenditures plus all Operating Capital expenditures during the fiscal year. Operating Capital – Capital assets that are purchased to facilitate the ongoing operations of the City. Operating Capital includes all capital purchases, less than $25,000, that are not classified as Capital Improvement Projects. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 5 of 39 Purpose Statement The intent of this capital planning procedure is to provide guidelines to allow the development of a 5-year capital plan for the City of McCall which meets the intent of policy enacted by the City Council. The outcome of this process will provide a comprehensive 5-year capital plan which is approved by the City Manager and subsequently adopted by the City Council. Adoption of the 5-year capital plan by the City Council will, ideally, occur outside of the routine budget development process on an annual basis. The adopted 5-year capital plan will be integrated into that year’s budget process to provide a well-thought out and fiscally balanced capital plan. For reference, governing policy, as adopted by the City Council, can be found at Attachment 1 to this procedure. The following procedure will outline components which lead to the development of a comprehensive 5-year capital plan for each department, prioritization of capital needs across the city, recommendation of a balanced 5-year capital plan to the City Manager, and adoption of the same by City Council. It is expected that these components will be executed on an annual basis to ensure that the city’s capital plan is current and accurate. The flows of tasks to be completed in this process are illustrated below. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 6 of 39 Capital Needs Assessment On a recurring annual basis, it is expected that the leadership team of each department will execute and update the capital needs assessment for its respective organization prior to a deadline, established by the City Manager, for the commencement of the capital plan review process. The routine timeline for commencement of this process will be January of each year to ensure acceptance of a capital plan prior to the routine annual budgeting process. The task of completing a capital needs assessment should involve review of existing capital assets as well as project new or replacement assets and projects which are expected to occur within a reasonable planning horizon. Specific consideration should be given to a technical assessment of needs, changes in governmental policies or regulations which will drive capital needs, and routine changes in departmental priorities. From the longer planning horizon, needs of each department projected to occur within the first five years, will be identified to fulfill the needs of a 5-year capital plan. Capital Plan Request Sheets Department leadership will document its 5-year capital planning and operating capital needs, projects and assets over $10,000, on individual project worksheets found at Attachment 2 to this procedure. The intent of these worksheets is to not only provide enough information for consideration of capital requests by the peer review committee, but also to inform the City Council and McCall Community of the intent and need of each capital request when the 5-year capital plan is finalized. These sheets will be submitted to the Finance Department and City Manager each year no later than a date established by the City Manager. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 7 of 39 Peer Review Working Group Structure, Purpose, and Process Structure: The peer review working group will be staffed by a cross-section of staff members appointed on an annual basis by the City Manager. The City Treasurer will be a continuing member of the working group and will act to provide necessary financial data in the development process of the 5-year capital plan. In addition to staff members, a community liaison will be selected to assist the process and provide citizen-oriented perspective through the capital development process. A chairperson will be appointed by the city manager to guide this process, and the city manager will confer with this chairperson directly as the liaison to the working group to receive periodic progress updates. Purpose: Although these staff members may serve individual departments within the city, this working group and its associated members serve the City Manager directly in development of the 5-year capital plan. The intent of this working group is to provide the City Manager with a recommendation for a comprehensive and fiscally balanced 5-year capital plan which achieves the city’s top priorities. Process: Each year, the peer review working group will complete the following tasks: o Meet and review the current and adopted policy and procedures as set forth by the City Council and City Manager. o Develop a schedule for review and develop of a draft 5-year capital plan for review of the City Manager. o Schedule presentation of each department’s 5-year capital plan requests at the onset of each annual review process. The City Manager will ensure that departmental leaders comply with requests to present capital needs to this group. o Following presentation, review the submitted capital needs requests from individual departments, and clarify any outstanding questions regarding each capital request. o Score each capital request utilizing an accepted scoring template. A template scoring sheet has been provided at Attachment 3. This template provides a starting point for use by the working group, however it is expected that the group may request approval of the City Manager to modify the score sheet if it does not suit the needs of the group. o Once scored, develop a comprehensive and prioritized listing of capital needs for the city. Utilizing input from the City Treasurer, attempt to develop a balanced 5-year capital plan which identifies existing and potential funding sources to enable each capital investment. Unfunded projects should be reflected in each fiscal year and rolled over for consideration in the following fiscal year projection. o Finalize a draft 5-year capital plan and schedule presentation to the City Manager. Approval Process After addressing questions or concerns of the City Manager, the chairperson of the peer review working group will present the 5-year capital plan to the City Council for adoption. Once adopted by the Council, the group’s work will be complete for that given fiscal year. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 8 of 39 City of McCall Capital Asset Management Policy The capital assets of the City of McCall are property owned in common by the citizens of our community. The management of these capital assets shall be governed by this policy, which has four major components: Capital Improvement Planning, Capital Budgeting, Capital Project Management and Capital Asset Maintenance. Definitions Capital Asset – Land, improvements to land, easements, buildings, building improvements, vehicles, machinery, equipment, works of art and historical treasures, infrastructure, and all other tangible or intangible assets that are used in operations that have an initial useful life in excess of one year, and have an initial, individual cost of more than $10,000. Capital Improvement Plan – The Capital Improvement Plan (CIP) is a tool used to establish, forecast and review the City’s major capital projects needs over a period of several years for the systematic improvement, maintenance and replacement of the City’s infrastructure. Additionally, the CIP is used to identify potential funding sources, prioritize projects and set forth a timeline for funding and completing those projects. Capital Improvement Project – A project that includes the acquisition or construction of a capital asset or group of capital assets that meets the $25,000 threshold for Capital Improvement Projects and has an estimated useful life of greater than five years. Capital Outlay – The total of all capital asset acquisitions during a period of time. Capital outlay for a particular fiscal year would include all Capital Improvement Project expenditures plus all Operating Capital expenditures during the fiscal year. Operating Capital – Capital assets that are purchased to facilitate the ongoing operations of the City. Operating Capital includes all capital purchases, less than $25,000, that are not classified as Capital Improvement Projects. 1)Capital Improvement Planning – The Capital Improvement Plan (CIP) is a tool used to establish, forecast and review the City’s major capital projects needs over a period of several years for the systematic improvement, maintenance and replacement of the City’s infrastructure. Additionally, the CIP is used to identify potential funding sources, prioritize projects and set forth a timeline for funding and completing those projects. a.The City Manager will annually submit a financially balanced, multi-year CIP for review, approval and adoption by the City Council. b. A CIP Committee will exist to identify capital improvement projects, identify funding sources for those projects, and review project details utilizing a standardized set of prioritization criteria. The City Manager or his/her designee will chair the committee. The committee will be a staff committee consisting of a cross representation of City employees appointed by the City Manager, and when available, a citizen liaison from the community and/or a member of an established City committee. Attachment 1 – Capital Asset Management Policy CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 9 of 39 c.The CIP will cover a minimum of a five (5) year prospective period, and will be a cohesive representation of the City’s overall current and future capital improvement project needs, taking into account the City’s Comprehensive Plan, CIP Committee analyses and recommendations, and the needs and desires of the citizens of the community. d. The CIP will include at least the following essential components: i.Statement of the general objectives of the CIP and the relationship to the City’s Comprehensive Plan, department master plans, and annual budget. ii.A schedule or listing of each capital improvement project, estimated total cost and cost per fiscal year, funding status, expected funding source(s), project description and justification and estimated start and completion dates. No capital project shall be funded unless operating impacts have been assessed and the necessary funds can be reasonably anticipated to be available when needed. e.To be considered for inclusion in the CIP, a Capital Improvement Project’s estimated aggregate cost must exceed a threshold of $25,000. f.Deferring essential maintenance and/or asset replacement can negatively impact service delivery and increase long term costs. The City will periodically assess the condition of assets and infrastructure and appropriately plan for required major maintenance and replacement needs. Efforts will be made to allocate sufficient funds in the multi-year capital plan and operating budgets for condition assessments, preventative and major maintenance, and repair and replacement of critical infrastructure assets. g.The City will match programs and activities identified in the CIP with associated funding sources. h.The City’s objective is to incorporate “Pay-As-You-Go” funding (using available cash resources) to supplement other funding sources such as bonds and grants in the annual CIP. i.The City’s objective is to allocate one-time revenue sources to one-time expenditures. j.When current revenues or resources are available for capital improvements projects, consideration will be given first to those with the shortest useful life and/or to those capital assets whose nature makes them comparatively more difficult to finance with bonds. Using cash for projects with shorter lives and bonds for projects with longer lives facilitates “intergenerational equity” CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 10 of 39 2)Capital Budgeting – Capital Budgeting is the process used by the City to arrive at the Capital Outlay figures in the adopted budget each fiscal year. There are two components of Capital Outlay: Capital Improvement Projects and Operating Capital. a.Capital Improvement Projects are projects that include the acquisition or construction of a capital asset or group of capital assets that meet the dollar threshold for Capital Improvement Projects and have an estimated useful life of greater than five years. i.The first year of the adopted CIP plus operating capital will be the total capital budget for that fiscal year. ii.The CIP will be updated annually as a multi-departmental effort. b.Operating Capital – Land, improvements to land, easements, buildings, building improvements, vehicles, machinery, equipment, works of art and historical treasures, infrastructure, and all other tangible or intangible assets that are used in operations, that have initial an useful life in excess of one year, and have an initial, individual cost of more than $10,000 and less than $25,000, but are not classified as Capital Improvement Projects. i.Budgeting for Operating Capital is not subject to the formalized process that Capital Improvement Projects are, however the operating capital budget should implement principles similar to those used in budgeting for CIP. An inter- departmental approach should be utilized, taking into consideration the overall needs of the City in terms of asset acquisition, replacement and maintenance. 3) Capital Project Management a.Every CIP project will have a project manager who will prepare the project proposal, ensure that required phases are completed on schedule, authorize all project expenditures, ensure that all regulations and laws are observed, and periodically report project status. b. Within 90 days of the completion of a capital project any remaining appropriated funds for the project will revert to the fund balance of the funding source to be re-allocated to eligible CIP projects. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 11 of 39 4) Capital Asset Maintenance a.The Finance Department will maintain a complete listing of capital assets, including original acquisition date and cost. b. Adequate insurance will be maintained on all capital assets. c.City of McCall assets will not be degraded, given away or allowed to deteriorate except by action of the Council. CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 12 of 39 Attachment 2 – Capital Needs Worksheet Capital Needs Worksheet CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 13 of 39 City of McCall Capital Improvement Plan Project Priority Scoring Criteria CIP Project _____________________________________________________ Choose one. Choose the one criterion which best fits the project. Enter points in the score box. 1. Assessment of Need Extent to which the project is deemed necessary and important 1 pt. Project supported by a small but vocal minority 2 pts. Department has identified the project as a priority 3 pts. Project is supported by the City of McCall Comprehensive Plan or any other adopted City plan. SCORE 2. Project Life Cycle and Life Cycle Costs Expected useful life of the new facility or infrastructure, given various levels of maintenance. 1 pt. Less than 10 years 2 pts. Greater than 10 years 3 pts. Greater than 20 years SCORE 3. Implications of Project Deferral Extent to which deferring this project will create unsafe conditions and/or cause noticeable disruption to level of service 1 pt. Deferring project will NOT create unsafe conditions and/or cause noticeable disruptions to level of service 2 pts. Deferring project will NOT create unsafe conditions and/or cause noticeable disruptions to level of service, but will result in shorter life span of the asset or increased maintenance costs 3 pts. Deferring project will create unsafe conditions and/or cause noticeable disruptions to level of service SCORE Attachment 3- Project Priority Scoring Criteria CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 14 of 39 4. Operating Budget Impact - Expected net change in operation and maintenance costs. 0 pt. Net operational increase 2 pts. No change in operational cost 3 pts. Net operational decrease SCORE 5. Leverage Project leverages non-City financial resources, donations or can be linked with another project to save money. 0 pt. No leverage 2 pts. Less than 50% leverage 3 pts. Greater than 50% leverage SCORE 5. Required by Law Project is required by a State or Federal mandate? 1 pts. Project is not required by State or Federal mandate 2 pts. Project will partially meet State or Federal mandate 3 pts. Project will meet State or Federal mandate SCORE CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 15 of 39 CITY OF MCCALL MONTHLY CONSOLIDATED DEPARTMENT REPORT Department Project Comments Status Airport AIP -21 Land Acquisition Work ongoing. Update to Council at April 28, 2016 meeting. Ongoing Airport Minimum Standards and Rules/ Regulations Review Discussions of proposed revisions to the Minimum Standards and Rules/Regulations have continued with the AAC. Upon completion, a proposal for revisions will be brought to the Council. Ongoing Airport Hangar Lease Rate Analysis Appraisals for blended rate and split rate recommendations have been provided to the AAC. A recommendation is expected to be received from the AAC regarding these reports at the upcoming meeting, after which a recommendation will be carried to the Council for review/consideration. Ongoing Airport Annual Lease Billing Last payment has been received for FY16. Complete Airport AIP -22 Snow Removal Equipment Contract for T-O Engineering services on meeting agenda. Working to develop vehicle specifications and bid package. Ongoing Airport Non Grant Funded Snow Removal Equipment Snow Blower delivered and works well. Able to clear parallel taxiways and ramp much more efficiently. Complete Community Development Building See attached chart for building permit status and comparison to previous years. Updated Community Development Building Continued work on facilities planning – Various designs and cost estimates for Annex, TVT, PD, campus, etc. Updated Community Development Building Library Expansion Committee continues to meet. Developed RFP for design consultant. Awaiting proposals for consideration. New Community Development Geographic Information Systems (GIS) GIS is working with the Parks & Rec Dept on a McCall Area Recreation map. Also working with the Airport Maintenance staff on web-enabled inspection forms; also working with the Comp Plan team as well as SPF Water to supply data for both projects. Updated Community Development Grants See attached Grant Status Report for updates. Received notice of award for FY17 LRHIP grant for Commerce Street improvements. Participated in two TIGER 8 webinars. Submitted request to Idaho Power for public art support. Updated CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 16 of 39 Department Project Comments Status Community Development Comprehensive Plan Update McCall in Motion kick off with photo challenge and chalkboards around town inviting people to share what moves them about McCall will likely start on Friday April 8th. City Committee appreciation lunch and visioning workshop planned for April 26. Public workshops are planned for April 27. See website www.mccallcompplan2016.com. Updated Community Development Building, Planning and Zoning Staff has archived project files and is updating the secondary archive database. Updated Community Development Transit Center Working on a draft lease agreement. Updated Community Development Planning & Zoning Commission The May 3 meeting agenda includes 1 minor Subdivision Plat Amendment, 1 PUD Amendment, and 4 Design Review applications. Updated Community Development Public Art Susan Bond has been recommended by the public art selection and advisory committees for the Rotary Park railings project. Working with MDHS on second year of youth Hometown Art project to create 4-5 more mural panels for the Railroad Ave retaining wall. Updated Community Development Payette River Scenic Byway (PRSB) The byway committee will meet April 29 in Cascade. Updated Community Development McCall Improvement Committee The McCall Improvement Committee met on March 10. They are planning the 2016 garden tour as a fundraiser. Updated Community Development McCall Redevelopment Agency (MRA) MRA will hold next meeting on May 3. Updated Community Development Centennial Committee The Centennial Committee did not meet this month. No Change Community Development Historic Pres. Commission HPC met on March 21. They are continuing to work on the McCall History DVD. The RFQ for a consultant for the Lardo Bridge signage is released and due April 15. Updated Golf Staffing Three full-time employees working in March. Advertising for seasonal employees has started. Update Golf Greens Greens were checked the last week of March, showing 16 to 32 inches of snow cover. Billy and Randy spread High-Cal lime on the greens to make the snow dirty and speed up the melt. It is melting quickly now. Update Golf Equipment Equipment is mostly ready to go. Staff have been going over the equipment list and working on a replacement plan for equipment with high hours. Update CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 17 of 39 Department Project Comments Status Golf Time Off Staff took some time off during the month. Eric McCormick was out due to family medical issues. New Golf Golf Shows Eric McCormick attended the Seattle Golf Show the first weekend of March. The show went well. Update Golf Clubhouse The carpet has been ordered and will be installed after the clubhouse closes on the April 15 for cleaning and upgrades. At that time some work will be done on the front steps because they are sagging in the middle. The window replacement was put out for bid and we expect them back the first of the month. Hopefully this will allow enough time to get the windows ordered and installed before Memorial Day Weekend. Update Golf Driving Range The Driving Range was opened this month so the High School Golf Team could hit balls outdoors. New Information Systems Work focus and projects Purchasing of replacement staff computers, network and data storage equipment is underway. Some additional data backup and network switching capacity have been identified as high priorities to enhance operational reliability. Updated Information Systems Work focus and projects Datacenter infrastructure replacement (i.e., servers, storage, virtualization and management tools) is nearing completion. Some migration operations have posed serious challenges with Microsoft bugs and local network complexity. Downtime or compromised functionality have required much unanticipated work. Still, almost all servers have now been successfully moved to the new platform. Updated Information Systems Work focus and projects With analysis complete for law enforcement video data creation and retention, specification and purchasing have begun for FY16. Stepwise, phased growth is expected to continue annually, or nearly so, for many years to come unless cloud or outsourced storage and backup are OK’d by regulatory and legal guidance at some point in the future. Updated Information Systems Work focus and projects City departments rely on a wide range of software to support their missions and functions. A survey was conducted to help us understand what tools we use, what works, and how we might better use software to improve services, task integration, efficiency and economy in City operations. A draft report is circulating to help us leverage the results. A data working group will be convened to identify opportunities and propose solutions for improving the City’s application data integration, efficiency and work process productivity. Updated CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 18 of 39 Department Project Comments Status Library Upcoming Programs Please see the calendar for your library’s April programs included with this report. Ongoing Library Statistics March statistics included in this report show a significant increase in attendance and circulation. Ongoing Library Story Stop Every Wednesday, children ages 0-3. Makes for a crowded but fun atmosphere for families. Ongoing Library Story Time Every Thursday 10:30-11:30 a.m. Reading and art activities aid childhood development. Ages 3-5 with adult. Ongoing Library Adult Coloring Night Color your stress away. Run by volunteers at the library. Monthly Library Idaho Day School Visits 4th grade classes kicked off their Idaho History Projects with a field trip to the library. We introduced them to the amazing resources in the Idaho Room, read an Idaho story with accompanying math exercise, and had a “living museum” complete with period costume and artifacts. The favorite was the old-fashioned 2-person crosscut saw—4th graders love to cut! See photo. Complete Library Idaho Day Tree Ornaments In cooperation with the Forest Service, we celebrated Idaho Day March 4th with a library table set up for the public to make bluebird Christmas tree ornaments to send to D.C. with the tree from Payette National Forest this December. Complete Library Dr. Seuss Birthday Celebration Read Across America Day – a great way to celebrate literacy and keep kids interested in Dr. Seuss favorites. Programming librarians prepared story times, snacks, educational games and prizes. Very well received by the public. Complete Library Let’s Talk About It -- Adult Reading Series Dr. Kate Udall (BSU) and Dr. Scott Knickerbocker (College of Idaho) visited McCall to lead the final 2 discussions in this year’s series. Participant surveys were nearly 100% positive for the overall program and we will apply for this series again next winter. Complete Library Building Expansion Four proposals received from interested design firms in response to RFP. Committee and Board will interview in April to select the firm to design our new library this summer. Ongoing Library Makerspace Grant Workshops Casey and Melody attended a 3-day workshop in Boise to initiate McCall’s first ever public Makerspace. A “makerspace” is a community workshop open to the public to explore creative and tech opportunities and can include anything from sewing to soldering to 3D prints. Complete CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 19 of 39 Department Project Comments Status Library Teen Tech Week Ever turned a set of bananas into a piano? Library patrons have! Interactive technology including circuitry and “makey” kits and mini robots was available for patrons of all ages to discover and interact with. Complete Library Club Español This popular after-school language learning class celebrated a Primavera Fiesta with language, art, ethnic food, song and dance. Next session will start in June or in September. Complete Library Tech Tuesdays Library staff are available to help the public with their e- readers any day, but Tech Tuesdays have been designated as a special time for folks to bring in their devices so we can help them log into OverDrive, our e- book application. Tuesdays, 4-6 PM. Ongoing Library Chess Club & Board Gamers An all-ages Chess Club has expanded to include other board games. Ongoing Library Grants for digitizing local history records Volunteers dropped off since the holidays. We need to re-ignite this project with fresh volunteers and energy. Scanning continues with subject files. One volunteer contributed 30 hours in March. Ongoing Library Job Vacancy Jessica Workman’s last day will be April 16th, as she leaves to fight fire in Alaska this summer. An offer has been extended to a top candidate to fill this opening as soon as possible. Complete Parks and Recreation Partnerships Spring partnerships complete and Summer partnerships in Progress. In Progress Parks and Recreation City Website Updating City Website to flow better with online registration page/content. Ongoing Parks and Recreation Online Registration Working with current provider to update all upcoming program offerings and learning new additional features to the site. Also working with City Communications manager on enabling more marketing/linking capabilities with TeamSideline. Ongoing Parks and Recreation Assist Parks Crew Working with Parks crew to help with Spring projects once conditions allow. In Progress Parks and Recreation Environmental Action Committee Working on Green initiative, air quality, Payette Lake water quality, and noxious weeds projects. Proposals going forward to Council for Air Quality regulations and Green Business practices to be endorsed by the City of McCall. Open seat for high school representative. In Progress Parks and Recreation Gold Glove Park ADA walkway and additional bathroom hand dryers upcoming. Spring landscaping with city and donated funds to take place this Spring. In Progress CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 20 of 39 Department Project Comments Status Parks and Recreation Pathways Walking Poles – Loaner Program Partnership with McCall St Luke’s to provide loaner walking poles at locations around the paved pathways to promote walking in McCall. Complete Parks and Recreation Alternative Partners/ Programming Ongoing efforts to work with local private organizations to develop opportunities for additional programming. Ongoing Parks and Recreation Spring/Summer Programs Programs: Youth Spring Soccer – In progress Adult Basketball – In progress Youth Volleyball – In progress Adult Soccer – In progress Foundations of Football – In progress Summer Programs: All marketing, coordination, and updating website underway; will be complete by end of April. In Progress Parks and Recreation Helmet Loaner Program/ Scholarship Helmets purchased and working with school to identify 10 scholarships based on need and whole student concept. In Progress Parks and Recreation Spring/Summer 2016 Brochure Informative Spring/Summer booklet to be completed and distributed by 1st week of May 2016. In Progress Parks and Recreation Summer Equipment Purchases Inventory existing gear and ordering projected items needed. In Progress Parks and Recreation Mtn. Bike Skills Park Construction Prep. The Department is working on a design, feasibility study, and cost estimate to install a Mtn. Bike Skills Park adjacent to the skate park. Applying for a small grant to help with construction cost. In Progress (Waiting on Grant) Parks and Recreation Summer Seasonal Hiring Positions have been advertised and we are excepting applications now. In Progress Parks and Recreation Volleyball court – retaining wall construction and storm drain outlet repairs Minor cleanup on the Parks side and wrap up work with contractor. In Progress Parks and Recreation Riverfront Park Adjustments to construction drawings underway. Staff is in the process of applying for a Road and Bridge State Grant for improvements to the access road. In Progress (Waiting on Grant) Parks and Recreation Wildhorse Property – Thompson Street Working with a University of Idaho graduate student on the design of interpretive panels and pathway. In Progress CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 21 of 39 Department Project Comments Status Parks and Recreation Grant Applications Road and Bridge Grant – Riverfront; Mtn. Bike Skills Park Grant In Progress Parks and Recreation City Campus Improvements Deck/boardwalk is complete to North Entrance at City Hall. Legion Hall entrance put on hold until spring. Complete/ Postponed Parks and Recreation Snow Removal Equipment is holding up well. Staff will continue to monitor and open up access to facilities to expedite spring melt. Ongoing Parks and Recreation Downtown Sidewalk Brick Repairs Project is 75% complete and staff will continue to work on as time allows. Will resume in the spring. In Progress Parks and Recreation Parks Shop and Office Planning Identifying needs and finalizing location. In Progress Parks and Recreation Rotary Park Construction Documents and Bid Package Working on construction documents and details -- Development of bid packet (May bid opening); working on 404 Permit for encroachment at the high water mark (submitted). In Progress Parks and Recreation Summer seasonal hiring process Began advertising for spring and summer help. In Progress Parks and Recreation Spring Cleanup As areas become accessible staff will resume projects and begin cleanup. In Progress Parks and Recreation Wayfinding Signage Working with CD on the design and implementation of wayfinding signs. In Progress Police Personnel The McCall Police Department is currently recruiting for the position of Patrol Officer. Testing is scheduled for April 16, 2016. Promotion testing for the open Patrol Sergeant position was held on March 15, 2016. Results of the testing will be announced in April. Ongoing Police Personnel The McCall Police Department has filled two open positions. Both individuals are scheduled to begin work with the City April 18, 2016. Adam Benjamin has been hired as a Patrol Officer. Adam is a sworn officer returning to the Police Department from Idaho State Police. Stephanie Brandt has been hired as for the position of Code Enforcement Officer. Both will complete a Field Training Program prior to working normal schedules. Ongoing Police Personnel Corporal Andrew Fisher has submitted his resignation. Corporal Fisher has accepted a position with Idaho State Police. Complete CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 22 of 39 Department Project Comments Status Police Training Officer Chris Bates is scheduled to attend Street Level Pharmaceutical training in Cascade, Idaho, March 16. Officer Christian Wann attending the Highway Safety Summit in Coeur d’Alene, Idaho, March 15-16, 2016. Complete Police Training Officer Chris Bates is scheduled to attend Reid Interview and Interrogation, April 4-8, 2016, in Boise. Officer Josh Johnson is scheduled to attend Legal and Liability for Tactical and SWAT Teams, April 24-26, 2016 in Meridian, Idaho. Ongoing Police Community Service The McCall Police Department continues to accept expired, unwanted or unused over the counter and prescription medication during normal business hours, Monday - Friday 8:00am – 5:00pm. Ongoing Police Community Service McCall Officers are continuing to work with the National Highway Safety Board, Idaho Transportation Department and Idaho State Police on emphasis patrols for Seat Belt Usage, Aggressive Driving, and DUI awareness. In return McCall Police Department receives Grant Money for needed equipment. The police department is using the money to upgrade video and radar systems in the patrol cars. Ongoing PW Admin/ Engineering DEQ Water Planning Grant Additional SCADA Data has been provided to SPF for analysis. Fire flow testing in various areas will commence in the later parts of April through May. Ongoing PW Admin/ Engineering DEQ Wastewater Planning Grant The revised Quality Assurance Project Plan and Groundwater Monitoring Plan have been submitted to IDEQ/WQD for review. It is expected that new monitoring wells will be installed in May. Ongoing/ Updated PW Admin/ Engineering Utility Rate Study City Council approved the contract with FCS Group to conduct a sewer rate study in conjunction with the Payette Lakes Recreational Water & Sewer District. Ongoing/ Updated PW Admin/ Engineering Asset Management Software Public Works continues to work with the Parks Dept to implement Elements and have introduced the new Airport Manager to the benefits of Elements. Ongoing/ Updated PW Admin/ Engineering Land Use Application Development Reviews City Engineer working with Community Development of application review (engineering and PW review/approval) for 1CUP, 1 PUD, 1 DR and 1 ROS projects. Multiple pre-application meetings with developers and city staff. Ongoing/ Updated PW Admin/ Engineering Public Works Fees Staff has reviewed all of the fees that Public Works charges for developmental services. Staff will be making a presentation on updated fees in April to City Council and recommended changes. New CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 23 of 39 Department Project Comments Status PW Admin/ Engineering J-Ditch/Winter Storage Pond Pond levels are currently 2 feet higher than last year at this time. Pond capacity is 59% of full. Ongoing/ Updated PW Admin/ Engineering Emergency Outfall Discharge Pipe The area around Lift Station 9A will be surveyed on April 11. A determination will be made if the outfall line can be relocated to the north side of Deinhard Lane. Ongoing/ Updated PW Admin/ Engineering Community Choices 2016 Streetscape Improvements Amended construction state and local agreement approved by City Council on 3/10/16. Staff and ITD negotiated construction engineering and inspection (CEI) contract to be presented in early April. Invitation for rebid occurred 3/22/16; bid opening will be 4/12/16. Received formal consent for driveway entrance modifications from AmeriTitle. Tree removal was completed by Streets Dept on Roosevelt for compliance with environmental requirements for project. Ongoing/ Updated PW Admin/ Engineering LOT 2016/ Streets CIP Commerce Street engineering design and Downtown Core Construction Feasibility task orders for Horrocks Engineers developed and approved on 3/14/16. Ongoing/ Updated PW Admin/ Engineering Fir Street Boat Ramp/ Volleyball Ct Retaining Wall Site inspections and coordination with contractor to finish work remaining on project and replace installed concrete that did not meet specifications. Final work to be completed in April, weather depending. New/ Ongoing PW Admin/ Engineering Transportation Master Plan Task order development for Horrocks Engineers to complete FY16 work including pavement inventory, summer/winter maintenance cost analysis, and Streets CIP development. Narrative summary of all work will be incorporated into final Transportation Master Plan. Ongoing/ Updated PW Admin/ Engineering Construction Site Best Management Practices Training City Engineer and CD staff began planning certification class for construction site best management practices (BMPs). Course will be held on 5/10/16 at the North Fork Lodge and include morning in-class session and afternoon field training at Riverfront Park site. Formal advertising will begin 4/7/16. New/ Ongoing PW Admin/ Engineering Drainage Management Guidelines – Treatment Storm Update Presentation to Valley County Comm. on 3/14/16. They expressed full support for staff recommendations. Council approval of resolution formalizing proposed modifications to DMGs occurred on 3/24/16. Will present resolution for County approval during April/ May to allow modifications to apply to Impact Area. Ongoing/ Updated PW Streets Right-of-Way Maintenance Crews continue working on storm drain issues around town. With the melting of the snow have been removing additional trees that came down in December. Ongoing/ Updated PW Streets Community Choices project Streets Dept removed trees for the Alpine Playhouse sidewalk project. Trees and brush where moved to the City burn area, to be burned at a later day. New/ Completed PW Streets Street Sweeping Began sweeping streets as weather allows. New/ Ongoing CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 24 of 39 Department Project Comments Status PW Streets Customer Complaints Customer complaints surrounding pot holes, are being addressed with a call back or a face to face meeting. Ongoing/ Updated PW Streets Street Maintenance Crews continue to repair potholes in the downtown core. Ongoing PW Streets Snow Removal Had 7 minor snow events for the month with an accumulation of 14.5 inches. Ongoing/ Updated PW Streets Emergency Call-Ins Responded to 3 emergency call outs from dispatch (2/ sanding, and, 1/street sign down) Updated PW Streets Employee Training Employees of the streets department attended the following classes in March: 1) ATSSA Flagging Certification Class, 2) Environmental BMP, 3) Speed limits & speed zones, and 4) Roadway drainage. All of the classes were put on by LHTAC T2 Center, and apply to either a road scholar or road master certification. New/ Ongoing PW Sewer Collection Manhole Inspection Now that the snow is gone, crews will be starting to check manholes for damage that would allow I & I. New/ Ongoing PW Sewer Collection Emergency Call-Outs Duty phone employees responded to 3 emergency call- outs for the month (lift station alarms). Ongoing/ Updated PW Sewer Collection Sewer Main Flushing Continue to flush slow-moving sewer mains. Ongoing/ Updated PW Sewer Collection Routine Lift Station Maintenance Crews perform routine system checks at every lift station twice a week. Ongoing PW Sewer Collection New Sewer Connections No new sewer connection for the month. New/ Ongoing PW Sewer Collection Training Crew members attended the ATSSA Flagging Certification Class. New/ Completed PW Sewer Treatment Routine Maintenance Performing typical maintenance duties and water testing. Ongoing/ Updated PW Sewer Treatment CL2 Building Had to rebuild the chlorine lines in the building, and had the dosing pump fail in the salt brine machine that needed to be replaced. New/ Completed PW Water Distribution Training All water distribution employees attended the ATSSA Flagging Certification Class. The certification card is good for three years. New/ Completed CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 25 of 39 Department Project Comments Status PW Water Distribution Main Service Line Repairs One service line repair on E Lake Street for a lost clamp. A suspicious water leak on Hubbard was found to be excessive groundwater from snow runoff. Updated PW Water Distribution Emergency Call-Ins 2 emergency call-ins for the month due to water issues. Ongoing/ Updated PW Water Distribution New Water Services None for the month. Ongoing/ Updated PW Water Distribution Work Orders The crew responded to 10 work orders from customers and 8 from Utility Billing. Ongoing/ Updated PW Water Distribution Pre Turn-off Door Hangers Crew hung 37 door hangers for Utility Billing. New/ Ongoing PW Water Distribution MXUs No MXUs were replaced this month. Ongoing/ Updated PW Water Distribution ECRs No ECRs were replaced this month. Ongoing/ Updated PW Water Treatment Boilers Both boilers were fixed but another one failed again. Obtaining quotes to replace one or both (depending on cost) before more money is spent on repairs. New PW Water Treatment Davis Beach Riverside Inc. will be pulling the pump on 4-11-16 and taking it back to their shop to repair. Repair time frame is unknown until the pump can be torn down. Ongoing/ Updated PW Water Treatment Intake Lines/ Raw Water Buildings Will be checking with SPF on their recommendation for additional work needed on the intake lines. Hope to have their comments in the next 60 days. Ongoing PW Water Treatment EIM Actuator Valve Maintenance Butler completed servicing on the EIM Actuator Valves with no major issues noted. It was determined that the valves had never been serviced since installed (about 16 years ago) and will need to be set up on a routine maintenance schedule due to their age. Completed CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 26 of 39 GRANT STATUS REPORT- April 14, 2016 Department Project Name Project Manager Purpose Funder Amount Status Information Systems Cool & Connected David Simmonds Technical assistance for broadband development USDA/EPA Federal team to provide Technical assistance Updated: Will be notified in April Parks Mountain Bike Skills Park Kurt Wolf Design and construct skills park on MDSD property Idaho Department of Parks and Recreation $11,994 No change: will be notified in May, 2016 Parks Riverfront Park Access Improvements Kurt Wolf Improve road surface, parking, and stormwater management at Riverfront Idaho Department of Parks and Recreation $17,866 No change: will be notified in May, 2016 Community Development Alpine Playhouse Public Art Delta James Install public artwork near Alpine Playhouse Idaho Commission on the Arts $10,000 Updated: submitted request to Idaho Power for corporate funding Streets McCall Redevelopment Area Sidewalks Nathan Stewart Sidewalks in MRA district Federal Highways/ITD $198,000 See PW report for update. Community Development Public Art Project Delta James Install public art in Rotary Park Idaho Commission on the Arts $10,000 Updated: artist contract underway Public Works/Water Water Master Plan update Peter Borner Update master Plan Dept. of Environmental Quality $87,500 Revised amount: $89,998 No Change: Project is underway. Public Works/Sewer Groundwater Study Peter Borner Study leakage at wastewater pond Dept. of Environmental Quality $77,000 No Change: Project is underway. Streets Department Commerce Street Reconstruction Peter Borner Reconstruction of Commerce; stormwater and sidewalks Local Highway Technical Assistance Council $100,000 Updated: AWARDED! Project to occur in 2017 CONSOLIDATED DEPARTMENT REPORT April 14, 2016Page 27 of 39 $20,281$6,024$16,429$1,903$1,062$0$34,870$29,713$18,526$21,884$26,242$13,147$22,387$7,241$4,840$1,638$1,925$8,025$27,946$29,861$34,038$11,627$35,111$12,689$15,403$6,874$1,332$39$3,963$15,906$22,726$30,202$40,421$34,419$10,523$32,419$14,734$1,352$3,668$5,729$10,532$12,071$50,469$27,461$40,560$35,463$23,316$51,797$13,953$2,623$3,553$1,469$15,317$35,705$38,367$66,275$52,029$23,553$34,042$28,993$5,205$10,882$1,476$22,638$23,008$39,518$0$0$0$0$0$0$0$10,000$20,000$30,000$40,000$50,000$60,000$70,000123456789101112BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESTOTAL BLDG PERMIT FEES ‐ PER MONTH ‐ FISCAL YEAR201120122013201420152016OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 28 of 39 1234567891011122011$20,281 $26,305 $42,734 $44,637 $45,699 $45,699 $80,569 $110,282 $128,807 $150,691 $176,933 $190,0802012$22,387 $29,628 $34,468 $36,107 $38,032 $46,057 $74,004 $103,865 $137,903 $149,529 $184,640 $197,3292013$15,403 $22,277 $23,610 $23,649 $27,611 $43,517 $66,244 $96,446 $136,867 $171,286 $181,809 $214,2282014$14,734 $16,086 $19,754 $25,482 $36,014 $48,085 $98,554 $126,015 $166,575 $202,038 $225,354 $277,1502015$13,953 $16,575 $20,129 $21,598 $36,915 $72,620 $110,987 $177,263 $229,291 $252,844 $286,885 $315,8792016$5,205 $16,087 $17,563 $40,201 $63,209 $102,727 $102,727 $102,727 $102,727 $102,727 $102,727 $102,727$0$50,000$100,000$150,000$200,000$250,000$300,000$350,000BLDG PERMIT FEE + APPLICATION/PLANS CHECK FEE = TOTAL PERMIT FEESBLDG PERMIT FEES ‐RUNNING TOTAL ‐FISCAL YEAROCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 29 of 39 McCall Public Library 208-634-5522 www.mccall.lili.org Hours: Monday-Friday 10-6pm; Saturday 10-2pm; Sunday closed Sun Mon Tue Wed Thu Fri Sat 28 29 1 3:30– 5:30Board Gaming 4:00-5:30 Tech Tuesday 2 10:30-11:00 Seuss StoryStop 3:30-4:30 Spanish Club 7:00—Lets Talk About It 3 10:30-11:30 Seuss Story Time 4 Idaho Day 5 6 7 8 4:00-6:00 Chess Club 4:00-5:30 Tech Tuesday 9 10:30-11:00 StoryStop 3:30-4:30 Spanish Club 10 10:30-11:30 Story Time 11 12 13 14 3:00-5:00 Teen Tech Week Kick-off 15 Teen Tech Week 4:00– 6:00 Chess Club 4:00-5:30 Tech Tuesday Teen Tech Week 16 Teen Tech Week 10:30-11:00 StoryStop 3:30-4:30 Spanish Club 7:00—Lets Talk About It 17 Teen Tech Week 10:30-11:30 Story Time 18 Teen Tech Week 19 . 20 21 22 4:00– 6:00 Chess Club 4:00-5:30 Tech Tuesday 23 10:30-11:00 StoryStop 24 10:30-11:30 Story Time 25 26 27 28 6:00-8:00 Adult Color- ing Night 29 30 31 1 Primary Business Address Your Address Line 2 Your Address Line 3 Your Address Line 4 Your business tag line here. Phone: 555-555-5555 Fax: 555-555-5555 E-mail: someone@example.com March 2016 Programs SPECIAL EVENTS: Special Dr. Seuss Story Stop and Story Time Wednesday, March 2nd and Thursday, March 3rd 10:30-11:30 We will be celebrating Dr. Seuss’s birthday and Read Across America Day with special Suess themed storytimes, snacks, and prizes! Idaho Day Friday, March 4th 10:30-5:30 Come down and help us make state symbol tree ornaments for the Christmas tree that McCall will be sending to the White House this year! Let’s Talk About It Wednesday, March 2nd and March 16th 7:00pm Guest scholar Kate Udall will be leading the discussion on My Grandmother Smoked Cigars on March 2nd. Guest Scholar Scott Knickerbocker will be leading the final discussion in this year’s series on Invisible Man on March 16th. Books provided with registration, no library card required. Teen Tech Week Monday, March 14th—Friday, March 18th Monday we will be kicking off Teen Tech Week from 3:00-5:00pm We will also have a table, in the teen area, full of interactive technology for patrons to discover and interact with the whole week. Club Español Primavera Fiesta Wednesday, March 16th, 3:30-4:30pm Club Español invites the public to join them for their Primavera Fiesta! Help them decorate beautiful alfombras, and sample ethnic food, song, and dance. ONGOING PROGRAMS: Chess Club ~ Tuesdays 4:00 pm – all ages, all levels. Adult Coloring Night ~ Monday, March 28, 6:00-8:00pm—Color your stress away, materials provided. Board Gaming ~ First Tuesdays 3:30-5:30pm—Play Munchkin, Forbidden Island, Monopoly and more! all ages. Story Stop ~ Wednesdays 10:30 – 11:00 am A streamlined library story time with rhymes & games for children ages 0-3 (with adult). Tech Tuesdays ~ Tuesdays— 4:00pm-5:30pm -Bring in your device for help with e-books and overdrive. Children’s Story Time ~ Thursdays 10:30- 11:30 am Ages 3-5 (with adult). Preschool stories, art, and social time. CONSOLIDATED DEPARTMENT REPORT April 14, 2016Page 30 of 39 McCall Public Library 208-634-5522 www.mccall.lili.org Hours: Monday-Friday 10-6pm; Saturday 10-2pm; Sunday closed Sun Mon Tue Wed Thu Fri Sat 27 28 29 4:00– 6:00 Chess Club 4:00-5:30 Tech Tuesday 30 10:30-11:00 StoryStop 31 10:30-11:30 Story Time 1 2 3 4 5 3:30– 5:30Board Gaming 4:00-5:30 Tech Tuesday 6 10:30-11:00 StoryStop 7 10:30-11:30 Story Time 8 4:00-6:00 Seasonal Employment Job Fair 9 10 11 12 4:00– 6:00 Chess Club 4:00-5:30 Tech Tuesday 13 10:30-11:00 StoryStop 3:00-4:30 –Blackout Poetry 14 10:30-11:30 Story Time 15 16 . 17 18 6:30 Contagion movie screening 19 4:00– 6:00 Chess Club 4:00-5:30 Tech Tuesday 20 10:30-11:00 StoryStop 21 10:30-11:30 Story Time 22 3:30-5:30- Makerspace II 23 24 25 26 27 28 29 30 1 Primary Business Address Your Address Line 2 Your Address Line 3 Your Address Line 4 Your business tag line here. Phone: 555-555-5555 Fax: 555-555-5555 E-mail: someone@example.com April 2016 Programs SPECIAL EVENTS: Summer Seasonal Employment Job Fair April 8th 4:00-6:00pm Transitioning out of your winter job? Come down to the McCall Library and check out all the exciting jobs avail- able for the summer! Featuring Tamarack, Shore Lodge, and City of McCall! Blackout Poetry April 13th 3:00-4:30pm April is poetry month. So to celebrate we will show you how to make your own beautiful work of poetry, using nothing more than a ripped out page and some sharpie markers! Contagion Movie Screening April 18th at 6:30pm McCall Public Library in partnership with the McCall Immunization Coalition is showing the award winning movie, Contagion, followed by comments by Dr. Chris- tine Hahn, State of Idaho epidemiologist on the im- portance of vaccinations and respond to the issues raised in the movie. Makerspace Session II April 22nd 3:30-5:30pm This month we will dive a little deeper, and learn how to program Edison using software and code. We will also start planning a battlebot tournament! Volunteers Needed McCall Public Library is looking for some dedicated volunteers to help in scanning historical documents. If you are interested call 634-5522 or email cbruck@mccall.id.us ONGOING PROGRAMS: Chess Club ~ Tuesdays 4:00 pm – all ages, all levels. Adult Coloring Night ~ Monday, March 28, 6:00-8:00pm—Color your stress away, materials provided. Board Gaming ~ First Tuesdays 3:30-5:30pm—Play Munchkin, Forbidden Island, Monopoly and more! all ages. Story Stop ~ Wednesdays 10:30 – 11:00 am A streamlined library story time with rhymes & games for children ages 0-3 (with adult). Tech Tuesdays ~ Tuesdays— 4:00pm-5:30pm -Bring in your device for help with e-books and overdrive. Children’s Story Time ~ Thursdays 10:30- 11:30 am Ages 3-5 (with adult). Preschool stories, art, and social time. CONSOLIDATED DEPARTMENT REPORT April 14, 2016Page 31 of 39  Idaho Day at the Library March 4, 2016 CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 32 of 39 Library Statistics ‐‐ FY2016 Oct‐15 Nov‐15 Dec‐15 Jan‐16 Feb‐16 Mar‐16 Apr‐16 May‐16 Jun‐16 Jul‐16 Aug‐16 Sep‐16 Totals 2 ‐ 000‐099 8 5 16 17 10 3 ‐ 100‐199 14 7 15 10 17 4 ‐ 200‐299 7 5 21 16 12 5 ‐ 300‐399 39 46 46 43 38 6 ‐ 400‐499 4 2 4 12 0 7 ‐ 500‐599 22 18 24 42 37 8 ‐ 600‐699 83 81 87 88 86 9 ‐ 700‐799 64 96 46 81 81 10 ‐ 800‐899 34 36 48 27 21 11 ‐ 900‐919.9 32 34 35 48 63 12 ‐ 929‐999 65 54 37 44 48 13 ‐ Adult Fiction 699 682 692 760 809 14 ‐ Audio Books Circ Set 028324569 16 ‐ Biography 28 15 18 16 32 17 ‐ Board Books 103 93 81 111 134 18 ‐ CD Fiction Books 222 217 203 196 223 19 ‐ CD Junior Books 70 39 33 41 105 20 ‐ CD Music 10 0000 21 ‐ CD Non‐Fiction Books 41 38 18 15 42 22 ‐ CD YA Books 444017 23 ‐ Chapter books 138 109 99 126 169 24 ‐ Classic Movies 5 7 7 18 15 27 ‐ Dawn Moudy Collection 69449 28 ‐ DVD 14 137798 29 ‐ DVD Blu‐Ray 16 10 29 13 12 30 ‐ DVD Circ Set 67 104 47 16 29 31 ‐ DVD Fiction 266 325 387 307 388 32‐ DVD Kids 10 13 20 15 25 33 ‐ DVD Non‐Fiction 52 35 53 28 51 34 ‐ DVD TV Series 10 7 8 11 23 35 ‐ E Non‐Fiction 38 46 28 40 66 36 ‐ Eames Collection 66518 37 ‐ Early Readers 153 112 151 143 128 38 ‐ Idaho Archives 10220 39 ‐ Idaho Room 36 26 25 48 99 40 ‐ Independent Films 5 5 19 10 19 41 ‐ Junior Biography 21 37 23 28 29 42 ‐ Junior Non‐Fiction 356 337 300 273 463 43 ‐ Junior Readers 263 285 235 189 263 44 ‐ Junior Spanish 26 29 49 21 37 45 ‐ Kit 12667 46 ‐ Language learning 20020 47 ‐ Large Print 104 67 116 133 128 48 ‐ LP Circ Set 17 18 0 1 0 49 ‐ Magazine 45 28 28 54 42 50 ‐ Map 01000 51 ‐ Oversized 14407 52 ‐ Parenting 20030 53 ‐ Professional 60200 54 ‐ Reference 24112 55 ‐ Spanish 10 10 17 11 14 56 ‐ Story Books 751 624 699 595 875 57 ‐ Story Collection 24 20 21 9 11 58 ‐ Y A Non‐Fiction 33 12 28 15 26 59 ‐ YA Biography 00000 CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 33 of 39 60 ‐ Young Adult Fiction 84 78 89 91 70 61 ‐ Yount Adult Story Collection 00000 Adult Circulation 2068 2057 2124 2141 2453 Young Adult Circulation 121 94 121 106 113 Children's Circulation 1930 1726 1724 1583 2301 Circulation Totals 4142 3914 3992 3859 4892 Attendance 2351 2132 2032 2126 2445 Computer Usage 630 510 459 495 546 ILL's Received 23 37 23 25 25 Reference Requests 509 439 398 412 452 Food for Fines 33 11 28 20 84 Volunteers/hrs 9/15 5/8 6/27 2/7 17/47 Adult Program Attendence 138 174 77 180 60 Young Adult Program Attendence 9 6 23 6 19 Children's Program Attendence 670 483 551 587 730 CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 34 of 39 STREETS LOT BUDGETED, ACTUAL, AND FORECASTED DOLLARSMonthTourism LOT Five year average percentageFY16 Budget dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober4.51%November2.51%December5.83%1st Quarter TotalJanuary6.91%55,313 100,772 82.19% 100,772       55,313         82.19%February7.44%59,481 101,407 70.49% 202,179       114,793       76.12%March5.77%46,135 70,811 53.49%272,990       160,928       69.63%2nd Quarter Total 160,928 272,990 69.63%April2.56%20,494 31,455 53.49%304,444       181,422       67.81%May4.02%32,169 49,375 53.49%353,819       213,591       65.65%June10.30%82,423 126,507 53.49%480,327       296,014       62.26%3rd Quarter Total 135,086 207,337 53.49%July20.00%160,017 245,603 53.49%725,929       456,031       59.18%August18.42%147,396 226,231 53.49%952,160       603,427       57.79%September11.72%93,759 143,907 53.49%1,096,067    697,186       57.21%4th Quarter Total 401,172      615,741 53.49%Total100.00%697,186      1,096,067   176.12%697,186      1,227,884   8-Apr-16CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 35 of 39 30,000 40,000 50,000 60,000 70,000 80,000 LOT FiveYear Average Compared to FY15 Actual October November December January February March April May June July August SeptemberAverage13,753 7,780 17,685 21,098 22,493 17,472 7,882 12,550 31,860 60,575 55,946 36,163 Budget15,773 8,774 20,372 24,166 25,987 20,156 8,954 14,055 36,011 69,911 64,397 40,963FY15 Actual22,085 12,986 31,174 31,157 32,613 ‐‐‐‐‐‐‐Forecast29,906 13,285 20,853 53,429 75,000 75,000 60,777‐10,000 20,000 AverageBudgetFY15 ActualForecastCONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 36 of 39 70,00080,000 Five Year Actuals Comparison to Average60,000 70,000 50,000 30 00040,000 20,000 30,000 10,000 ‐October November December January February March April May June July August SeptemberAveragesFY11FY12FY13FY14FY15FY 16ForecastCONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 37 of 39 MonthFY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 TotalsOctober14,274     16,938     14,412   11,306   10,483   11,520   12,392     12,163   13,390 19,298 22,085 136,176November11,272     9,748       7,978     7,147     5,850     5,535     6,103       7,298     8,233 11,738 12,986 80,902December18,547     21,746     22,261   16,224   14,294   15,459   13,939     19,101   18,122 21,802 31,174 181,495January17,232     18,707     20,163   17,932   17,007 17,510 17,065     19,334   24,733 26,778 31,157 196,461February20,446     22,943     27,324   24,826   18,873   19,921   19,716     22,331   22,013 28,487 32,613 226,880March15,110     13,668     21,527   15,969   8,925     11,941   17,344     20,251   19,365 18,422162,523April7,294       8,049       6,425     5,954     6,183     6,210     6,696       6,165 8,719 11,64173,336May11,994     11,230     9,368     8,595     7,335     8,074     9,461       11,113 15,390 18,711111,271June23,442     24,611     25,426   22,248   21,491   20,728   25,352     33,681 37,000 42,541276,520July47,654     54,276     47,052   42,408   48,747   49,843   54,214     62,187 65,335 71,296543,012August44,024     52,948     41,089   32,480   39,398   44,505   48,919     57,546 64,959 63,598489,466September26,973     26,073     23,600   25,826   20,258   27,603   33,029     35,605 35,959 49,346304,272Total Dollars Received258,263  280,937  266,627 230,991 218,844 238,849 260,743  306,775 333,218 383,658 130,015 2,778,904LOT Actual Dollars Earned per MonthCONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 38 of 39 TOURISM LOT ACTUAL PERCENTAGES AND FORECASTED DOLLARSMonth FY11 FY12 FY13 FY14 FY15Five year averageFY16 Budget dollarsFY16 Budget + Contingent dollarsFY16 actual and forecast based on trendPercentage +/‐ based on budgetActual total Budget total total +/‐ YTDOctober 4.85% 4.70% 3.96% 4.02% 5.03%4.51%15,773 19,270        22,085 40.02% 22,085        15,773         40.02%November 2.33% 2.32% 2.38% 2.47% 3.06%2.51%8,774 10,720        12,986 48.00% 35,071        24,547         42.87%December 6.51% 5.29% 6.23% 5.44% 5.68%5.83%20,372 24,889 31,174 53.02% 66,245        44,919         47.48%1st Quarter Total 44,919 54,880        66,245 47.48%January 7.37% 6.48% 6.30% 7.44% 6.98%6.91%24,166 29,524 31,157 28.93% 97,402        69,086         40.99%February 8.38% 7.48% 7.28% 6.60% 7.43%7.44%25,987 31,749        32,613 25.50% 130,015     95,073         36.75%March5.03% 6.59% 6.60% 5.81% 4.80%5.77%20,156 24,626        25,848 28.24%155,863     115,229       35.26%2nd Quarter Total 70,310 85,900        89,618 27.46%April2.61% 2.54% 2.01% 2.61% 3.03%2.56%8,954 10,939        11,482 28.24%167,345     124,183       34.76%May3.40% 3.59% 3.62% 4.62% 4.88%4.02%14,055 17,171        18,023 28.24%185,368     138,237       34.09%June8.72% 9.62% 10.98% 11.10% 11.09%10.30%36,011 43,995        46,178 28.24%231,546     174,248       32.88%3rd Quarter Total 59,019 72,105        75,683 28.24%July20.98% 20.57% 20.27% 19.60% 18.58%20.00%69,911 85,413        75,000 7.28%306,546     244,159       25.55%August 18.73% 18.56% 18.76% 19.49% 16.58%18.42%64,397 78,676        75,000 16.46%381,546     308,557       23.66%September 11.09% 12.26% 11.61% 10.79% 12.86%11.72%40,963 50,046        52,530 28.24%434,076     349,520       24.19%4th Quarter Total 175,272      214,136      202,530 15.55%Total 100.00% 100.00% 100.00% 100.00% 100.00%100.00%349,520      427,020      434,076        140.00%349,520      427,020      489,328        Year to date the actual revenues received for FY16 are 20.27% OVER the year to date revenues for FY15 and 57.01% over the 5 year average year to date.8-Apr-16CONSOLIDATED DEPARTMENT REPORT April 14, 2016 Page 39 of 39