HomeMy Public PortalAbout10-0503 Turner"&( Q6)%
City of( bee Island • Community Develc ?ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. / '
Date Requested
11111111111
INTERNATIONAL
CODE COUNCIL"
MEMBER
J. Date Needed /1
Owner's Name f 7 �,frl v i
Gen. Contractor ° '.,A).. Ai/FL/L. Subcontractor /4!`, r, -
Contact Information ,f' }, J 3/7 -A1 /
Project Address
Scope of Work "�`,_ -� ! /% �- i1/40 ;,.
Inspector /. i Date of Inspection (c, , 0
Inspection ) /? -t' ;--:7,--J4-/ -- Pass ® Fail 0 Fee
,)1 (_)z_ /71
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail El Fee
Inspection Pass ❑ Fail ❑ Fee
City of Tybee Island — Community Development Department
Permit Number:
Job Address:
Job Name:
Type of Work:
BUILDING PERMIT
r ...• a ..i......qr, ____Lt...z..-4(_,_
j _.., t ► �' L..........1
PERMIT
Issued Dat • • 444
...4..-__4_1
Flood Zone (if applicable): 2- i g- W(4717/\--, rdzc 24C
To avoid penalty this placard must be posted and visible
from the street until completion of the project.
TO SCHEDULE AN INSPECTION
call (912) 786 -4573, extension 114, by 4:00 pm the day before you need an inspection.
DATE ISSUED: 10 -22 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
ELECTRICAL - SOLAR SYSTEM
125 EAGLE'S NEST
DAVID TURNER
PO BOX 86
TYBEE ISLAND GA 31328 -0086
398 -7244 DAVID
SOLAR SOURCE
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 245.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$40,000.00
PERMIT #: 100503
TOTAL BALANCE DUE: $ 245.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Ty bee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
D.�
Ti
ALL WIRING,
SERVICE
INCLUDED,
MUST BE
COPPER. NO
ALUMINUM
ALLOWED.
From:CITY OF TYBEE ISLAND
912 786 9539 10/22'9.010 10:39 #806 P.001/001
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. Box 2749, Tybee Island, GA 31328
Phone (912) 786 -4573 Fax (912) 786 -9539
ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT
Date )o) 2x)10
New Work Replacement
Location of work (street address) ) 25 , EYE T ,17 R 1 V E
Contractor 1). 1 lAkto �12j5 OL 'j-(2 SOL12L L CO Telephone 7 `7 0 — S $' 1 5-9
4, Address of Contractor 3% „) , %Ai2N t _ LC, cpq 3 C )
Property Owner DAN/ t.1) 4 - Rug -.1 y
'i `jt �N Telephone 9 I ) 3 O Sol.)
Date work will be ready for inspection, if known i\) OV • / S 2O / D
Estimated cost of construction . 4 0 , 0 C) 0
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
I. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
The own and contractor are hereby held responsible for any violations of this policy. A violation of this
result in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner /Contractor Signature Date 0) �a t
^Tu
Owner /Contractor Printed Name
-VOW. I i2 u1a
v� 1 it '2) SILL( r,d r G
APPROVAL Fee
Building Of.s� • _„„rff 1_ �
Dare I Q/Z
•
A/C Unit and Heat Pump
Attic Ventilation Fan
Bell Transmitter — low voltage
Border /Outline Lighting
Building Saw
Exit Lights — life safety
Heat Pump
Meter Box
Motor(s): hp
Outlets — 110 volts circuit
Parking Lot Lights
Pool Lights — grounding
Range — commercial
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
I. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
The own and contractor are hereby held responsible for any violations of this policy. A violation of this
result in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner /Contractor Signature Date 0) �a t
^Tu
Owner /Contractor Printed Name
-VOW. I i2 u1a
v� 1 it '2) SILL( r,d r G
APPROVAL Fee
Building Of.s� • _„„rff 1_ �
Dare I Q/Z
•
Range Hood -- commercial
Service: amps
Sign Circuit - wattage
Smoke Detector — low voltage
Spa or Tub — grounding
Special Outlet
Swimming Pool — grounding
Water Heater
Welder — 220 volts circuit
Well Pump — grounding
X -ray
Other SOLA,Q. 9v
hl -13CEP GMT. / 4W
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
I. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
The own and contractor are hereby held responsible for any violations of this policy. A violation of this
result in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner /Contractor Signature Date 0) �a t
^Tu
Owner /Contractor Printed Name
-VOW. I i2 u1a
v� 1 it '2) SILL( r,d r G
APPROVAL Fee
Building Of.s� • _„„rff 1_ �
Dare I Q/Z
•