HomeMy Public PortalAbout10-0512 SmileyDATE ISSUED: 10 -27 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
DRIVEWAY & WALKWAY
10 CEDARWOOD
FAWN SMILEY
318 E HUNTINGDON ST
SAVANNAH GA 31401 -5717
786 -7840
LYONS & SONS SERVICES INC
8803 RIVERS END DRIVE
SAVANNAH GA 31406
P
$ 53.00
$1,500.00
PERMIT #: 100512
TOTAL BALANCE DUE: $ 53.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
10- osiz
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: 13 CeCO c(
NAME
ADDRESS
PIN #
TELEPHONE
Owner
-FCC 1!J 6 S VIA l Ieu4
0
(,
-&_,1/
'0d(
3-66- '9-g /
Architect
or Engineer
/13 '5414
Building
Contractor
- `
1J "'J C x. S
1.
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
927-s) fog'
n Footprint Changes
❑ Discovery
❑ Demolition
Details of Project: .36 k ae 4-0�
c �S 5
Estimated Cost of Construction: $ l S1) 0
Constructionype
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
t i4-17
-e
(6) Other (please specify)
ATT• COPY OF THE CERTIFIED
following inform
# Units
Lot Area
# Off - street parking s ► : ces
Trees located & • ed on site plan
Access:
based on the cons
VATION SURVEY OF LOT and complete the
ction drawings and site plan:
ms
Living space
1 sq. ft .)
# Bathrooms
Driveway
Setbacks: Front
(ft.)
With culvert?
Rear
Wi
-ale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
all
During construction: 7
On -site restroom facilities will be provided through
On -site waste and debris containers will be rovided by r--0 £ 0 fc c
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: f ° • v Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
G
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
/O -t8- /O wore
��NcCf S
Date
teti-7I
5-� r ped b Ct /hal- al
coAt"tok (9y-)
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
to Ce_-.60.A(-u3ood
b.61 (43 vloo-
6\4(k
NAM „,-e'
boa-
Paq
cirfatvlai &4- _proper
eXcee,c4 2 5-ge 12-4'
III
NM
MN IMMO
"b\\1-6, %tip
4c(517, tOoSe,
T,RargICY
at I 2 2 2010
re4; Sec)
BY:
e)ult-p Apeo-b)( 2.1)42'
612t1,5 (Ir cy 1(
e4tW.RO.2 WI le
e+ACC6 amt
-rub. RomaJci 'kL,(4
ovsTEA- 5-t*m.e4
c_otiaktre eilorAoTe .0.461044.6c
Poog_
hA)v1/4) to
(1? c40-"
15(...40v4b.
<Laa IA1a -r
-`1cr s400
isvrAxi ctN,
'7N ►gNvi cam 4pfWI
*/.9-14 4d' Z)- j,1
,r�
/f
/ve......wo 6
1.)0441"kr t4347:71-0
/7,041
4)5/4JC s446(:7, ,5-0u47A-S
,4Ct FO y 736z0,-.)
-PKIG•i,k, 13 coLC souffle*.
'1i2/44-/A sittAit- i9,44-043
(1K c-L3,44415tr Forz /36-272 1f4/1/9(
gtz OEY4b 2 z,
Peridiot 4ato
Ye5 . f3at-
c4/e-13cty
— 5
o rooit nizbe.::, -2‘);;‹ ac).
I
4
X146.
6 e.E=rt,
- ,t,,&t) L.16 12) (3141-4111 DR.41,4o4 fer
• (---0‘,06 Tj T /3
r4e2.,p PI,( ‘zu&s.n.2.435 Qaw1
it4e3e4 rx-rwrezA, P4otki C'e4,(4LAIST BE /40 C•tici40e7 6,
14) PAb fr Liik;btif...
VI45,101/01A) 1u
11 Avol), 6)6