HomeMy Public PortalAboutWater DepartmentSPECIAL REVENUE FUND FY2018 FY2019
WATER DEPARTMENT -
MGL Chapter 40 Section 5F FY2017 DEPT HEAD
TOWN
ADMINISTRATOR
% CHANGE
YR / YR
$ CHANGE YR
/ YR
EXPENDED EXPENDED APPROPRIATED REQUEST #1 RECOMMENDED
WAGES:
Full-time 694,565$ 739,427.94 $ 779,218 $ 831,488 6.7% $ 52,270
Part Time -$ 0.00 $ 10,500 $ 10,500 0.0% $ -
Overtime 49,801$ 44,094.20 $ 46,350 $ 46,350 0.0% $ -
Standby Pay 13,000$ 18,550.00 $ 13,250 $ 18,200 37.4% $ 4,950
Longevity 4,350$ 5,250.00 $ 6,150 $ 7,200 17.1% $ 1,050
Clothing Reimbursement 5,359$ 4,737.76 $ 7,500 -100.0% $ (7,500)
Contractual Obligations -$ -9,979.00 $ - $ - $ - $ -
SUB TOTAL 767,075.00 802,080.90 862,968$ 913,738$ -$ 5.9% $ 50,770
OPERATING EXPENSE:
Propane/Natural Gas 12,010$ 16,206.42 $ 18,000 $ 18,000 0.0% $ -
Electricity 122,125$ 112,926.42 $ 130,000 $ 130,000 0.0% $ -
Office Contracts 99,726.40 $ 58,000 $ 58,000 0.0% $ -
R & M Equipment 109,171$ $ 30,000 $ 30,000 0.0% $ -
Annual Water Sampling -$ $ 21,000 $ 21,000 0.0% $ -
Professional Expense 34,348$ 23,883.78 $ 20,000 $ 25,000 25.0% $ 5,000
Supplies 17,817$ 17,464.17 $ 14,000 $ 16,000 14.3% $ 2,000
Postage 1,884$ 0.00 $ 1,500 $ 2,000 33.3% $ 500
Chemicals $ 45,000 $ 45,000 0.0% $ -
Vehicle Maintenance $ 4,000 $ 3,000 -25.0% $ (1,000)
Small Tools & Equipment 58,474$ 53,027.51 $ 31,500 $ 40,000 27.0% $ 8,500
Primary Assessment 3,931$ 4,286.10 $ 4,000 $ 4,000 0.0% $ -
In-State Travel $ 700 $ 500 -28.6% $ (200)
Meetings / Seminars 709$ 654.98 $ 4,000 $ 2,000 -50.0% $ (2,000)
Lodging Expense 359$ $ 1,000 $ 500 -50.0% $ (500)
Meals Expense 42$ 250.00 $ 500 $ 500 0.0% $ -
Mileage 412$ 127.87 $ 500 $ 500 0.0% $ -
Scheduled System Maint 51,405$ 40,985.19 $ 35,000 $ 40,000 14.3% $ 5,000
Safety Clothing / Boots 1,750$ 5,917.46 $ 3,500 $ 10,000 185.7% $ 6,500
Fuel -$ 0.00 $ - $ 20,000 100% $ 20,000
Reserve for Unforseen Exp.0.00 $ 25,000 $ 25,000 0.0% $ -
SUB TOTAL 414,437.00 375,456.30 447,200$ 491,000$ -$ 9.8% $ 43,800
Total Operating Budget 1,181,512$ 1,177,537$ 1,310,168$ 1,404,738$ 7.2% $ 94,570
FY2020
Water 2/25/2019
SPECIAL REVENUE FUND FY2018 FY2019
WATER DEPARTMENT -
MGL Chapter 40 Section 5F FY2017 DEPT HEAD
TOWN
ADMINISTRATOR
% CHANGE
YR / YR
$ CHANGE YR
/ YR
EXPENDED EXPENDED APPROPRIATED REQUEST #1 RECOMMENDED
FY2020
DEBT SERVICE EXPENSE
Principal 555,000.00 $ 555,000 $ 555,000 0.0% $ -
Interest 207,761.25 $ 185,434 $ 164,920 -11.1% $ (20,514)
Issuance Costs 0.00 $ 10,000 $ 10,000 0.0% $ -
SUB TOTAL 0.00 762,761.25 750,434$ 729,920$ -$ -2.7% $ (20,514)
Water 2/25/2019
SPECIAL REVENUE FUND FY2018 FY2019
WATER DEPARTMENT -
MGL Chapter 40 Section 5F FY2017 DEPT HEAD
TOWN
ADMINISTRATOR
% CHANGE
YR / YR
$ CHANGE YR
/ YR
EXPENDED EXPENDED APPROPRIATED REQUEST #1 RECOMMENDED
FY2020
FRINGE BENEFITS
Unemployment 0.00 $ - $ - $ - $ -
Group Insurance 199,642.25 $ 189,232 $ 211,125 11.6% $ 21,893
Life Insurance 484.20 $ 484 $ 484 0.0% $ -
Medicare 10,950.00 $ 12,400 $ 13,200 6.5% $ 800
Sick Leave Incentive
Indirect Charges $ 130,000
Retirement 149,706.76 $ 159,499 $ 175,053 9.8% $ 15,554
SUB TOTAL 0.00 360,783.21 $ 361,615 $ 529,862 $ - 46.5% $ 168,247
GENERAL INSURANCE
Workers Compensation 21,129.00 $ 23,242 $ 34,055 46.5% $ 10,813
Claims $ - $ 1,000 $ 1,000
General Liability no funding - why not? $ - $ 29,515 $ 29,515
SUB TOTAL 0.00 21,129.00 $ 23,242 $ 64,570 $ - 177.8% $ 41,328
$ -
CAPITAL EXPENSE $ -
Additional Equipment 0.00 $ - $ - $ - $ -
Vehicles 226,354.63 $ 50,000 $ 130,000 160.0% $ 80,000
Master Plan 0.00 $ - $ 250,000 $ 250,000
Tank Repair & Maint 0.00 $ 13,000 $ - -100.0% $ (13,000)
Construction 118,968.79 $ 180,000 $ 180,000 0.0% $ -
SUB TOTAL 0.00 345,323.42 243,000$ 560,000$ -$ 130.5% $ 317,000
GRAND TOTAL 1,181,512.00 2,667,534.08 2,688,459$ 3,289,090$ -$ 22.3% $ 600,631
1181512 2667534.08 2688459 3289090 22.3
Water 2/25/2019
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
FY 20 BUDGET QUESTIONS
DEPARTMENT: Water
1. What are the differences between the FY19 and FY20 proposed budget?
The FY20 proposal will provide the same services as FY19. Fuel (Gasoline and Diesel)
was added to the proposal and in prior years it was transferred from water revenues to the
town as part of indirect costs. A line item was added (Office Contracts) to better track
annual office expenses like fire alarm testing, Bill Master fees, Utility Cloud fees and
various other expenses related to operations.
2. What are the reasons for any increases or decreases?
The increase in Wages is due to contractual obligations (OPEIU, SEIU and Personal By
Law Employees). The increase in Operating Expenses is due to Fuel being added rather
than as an indirect and an increase in some lines due to past history trends and current
balance of lines in FY19. Those lines are Professional Expenses, Supplies, Postage,
Small Tools and Equipment, Scheduled System Maintenance, Safety Clothing / Boots.
Some lines were also reduced for the same reason and those are: Vehicle Maintenance,
In-State Travel, Meetings/Seminars, Lodging Expenses.
3. Are you adding/reducing any personnel or programs?
No
4. What are your top budgeting priorities for FY20?
The Water Department is independently funded through water rates. It is set up this way
because all of the operational expenses are considered priorities due to the necessity of
the product it provides. As far as the capital requests I would prioritize them as 1.
Construction 2. Master Plan 3. Backhoe.
Office of:
Select Board
Town Administrator
5. Are there any expenses that could be deferred? What would be the impact?
Part Time funds could be eliminated and Hydrants would not get painted. The Master
Plan could be postponed to a later date and would have no immediate impact on the
operations. The Backhoe could be postponed to a later date and we would continue to
monitor its operation.
6. Recap of revenues and their sources?
I have requested a recap of Water Revenues and Expenses from Lisa Souve and
anticipate it will accompany this document.
7. Are any pricing/fee changes proposed?
No. The last rate increase was in 2016.
8. If your budget was level funded what would be a few major impacts to your operations?
The maintenance of existing infrastructure would be negatively impacted. Construction
would be limited as would crucial training of employees.
9. Are any revolving fund or receipts reserve changes proposed and for what reason?
No
Deane Keuch Paul Anderson
Susan Brown Superintendent
Doug Wilcock
William Porter
Board of Water Commissioners
FY 19 Narrative and Capital Requests
165 Commerce Park Rd ∙ BREWSTER, MA 02631 ∙ 508-896-5454 ∙ FAX 508-896-4517
TOWN OF BREWSTER
WATER DEPARTMENT
Services Provided
This department has mandatory monitoring and maintenance that is required for it to
operate. The spring and fall are the most difficult times to schedule construction due to
overlapping programs (hydrant flushing, seasonal turn on’s). Below is a brief description of
the Department and a list of services provided annually.
The Water Department consists of 9 field staff and 4 office. There are 135 miles of water
main with 7,421 service connections to residential and commercial structures. Domestic
and fire protection is maintained by two storage tanks (5 million gallons). The department
reads meters and bills the customers twice a year. The ongoing meter replacement program
is close to having all accounts on a radio read system. Field staff maintain existing
infrastructure and install new when time permits.
Monitoring of wells and treatment facilities
Sampling of wells and throughout the system
Flushing of all water main (done in the spring and fall)
Hydrant maintenance
Meter reading
Cross connection testing and surveys
Markouts of infrastructure
Emergency repairs of leaks
Curb to main replacements
Meter replacements
Seasonal turn ons and offs
Snow removal at water facilities and assisting Highway (seasonal)
Yard maintenance at 10 sites (seasonal)
Building maintenance (9 structures)
Responding to residents’ concerns
Training required to maintain water licensing
Replacement of 2” water mains with 8” and adding hydrants
Replacing hydrants determined inadequate by the maintenance program
Chemical deliveries and transfer of chemicals
General maintenance of pumps and treatment facilities
Emergency call outs
Page 2 of 2
Capital Requests
Purchase of Backhoe $130,000.00
The purchased Backhoe would be used for emergency repairs to existing infrastructure and the
installation of new infrastructure. The existing Backhoe is still in operation but is showing signs
of significant wear. The machine is serviced as recommended by the manufacturer but the
transmission is slowing down and the hydraulics are getting loose. The existing backhoe would
be kept as a yard machine and for use by DPW, Golf and Water as a backup. Both the new and
old machines would also be available for snow removal when needed.
Construction Funds $180,000.00
Annual appropriation for goods, materials and services to maintain and repair the water system. It
also includes water meters for new services and replacements required under State regulation. This
account is part of the Department Capital Plan and is provided for in the present water rate structure.
Master Plan $250,000.00
A Master Plan is a comprehensive study of all aspects of the Water Department. The study will
analyze existing operations and infrastructure. It will use historical data to predict the future
needs of the community and the ability of the Department to meet those needs. The study will
determine the need for future supply and identify critical capital projects. All recommendations
regarding operations and capital projects will have estimated financial impacts assigned and a
rate study will be completed as part of the study to ensure revenues are available to support
the anticipated future needs. The last study similar in scope was performed in 2006.