HomeMy Public PortalAbout10-0558 First City EnterprisesPermit No / � /
Owner's Name � ? i ; ..I..,1 Date Needed
Gen. Contractor /�i <_?
1 Subcontractor
Contact Information s1 -1 '"7,,K, __ <', "7e p
Project Address 7)( i i r_ 5;::-..,37,:i 3)--7,2;„
Scope of Work lr,1-- /J : r= i - 0
Inspector 7/,9 Date of Inspection %,: ,
Inspection E/ - Pass MI Fail— Fee
City of 'lee Island • Community Develo ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
■„%
=`1
INTERNATIONAL
CODE COUNCIL`
MEMBER
Date Requested
Inspection I''1 Pass
Inspection ✓ - Pass Fail Fee
Fa
Fee
Inspection 1'% Pass Fail 0 Fee
City of bee Island • Community Develc lent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. �,
Date Requested
i��%
INTERNATIONAL
CODE COUNCIL
MEMBER
r
Owner's Name �I),; -_ \> Date Needed i
r
Gen. Contractor J-i- k�'.5--- (1i 1 Subcontractor
Contact Information k, 0 v\A 1,1-6 - c Z I (.:)
/ _-
Project Address '% -- .�-` ir_IZ )77-/ �ri.41....t,-'
Scope of Work ! .a- -'t- 7-F-
Inspector = ,
-'/rl -7/ Date of Inspection /.Z ; -?
Inspection �.�, -i - Pass "_4Fail 0 Fee
Inspection X') -
Pass F -1 ❑ Fee
Inspection > > _ Pass
Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 11 -30 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR RESIDENTIAL BLDG
704 FIFTEENTH ST
FIRST CITY ENTERPRISES
PO BOX 1016
TYBEE ISLAND GA 31328
912- 786 -5210
FIRST CITY ENTERPRISES
PO BOX 1016
TYBEE ISLAND GA 31328
P
$ 189.00
$17,500.00
PERMIT #: 100558
TOTAL BALANCE DUE: $ 189.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORG.
APPLICATION FOR BUILDING PERMIT
Location: 70 1611' S I ize4
NAME
ADDRESS
PIN #
lb -0Ss8
TELEPHONE
Owner
D ou f
6AN, ca,..)
'70y 1 StkSr= , A)o
Architect
or Engineer
,
1,03
Building
Contractor
6,12 -t ,/
C pr is-if
: o , Di ) 0' 0 I
-rt.( t��9�2.131iC_N19. tl^' 3132Y
I-
�/ 6) — -Z 3
(Check all that apply)
Repair
Renovation
n Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
Residential
Single Family
Duplex
Multi - Family
❑ Commercial
n Footprint Changes
Discovery
Demolition
t cLpt.i I.) �1��,/113)x� Q 1ci 1c .\ j P)fc..k & ) ,(� 5�.vs.1� 1 �
6r , Pc l'd -F el-, 42A S) i-e. ft—ad,
Estimated Cost of Construction: $ /7)500_0 b
Construction Type 1 (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through Q (')J4 Yj
On -site waste and debris containers will be provided by CO N1 izA (-t 3 •
Construction debris will be disposed by COr12�G U { by means of (,iJp ,T cb)) /p.)p.k -
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: / I/ 2-J / Signature of Applicant: ' C')
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Date
1(13o110
FEES
Permit (35.00
Inspections S4.0()
Water Tap
Sewer Stub
Aid to Const.
TOTAL (81,0D
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented
by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information
pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools.
Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation
disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by
child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair
and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee
payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or
disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and
planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care
Providers and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -424-
LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child-
care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be
used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices.
To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The
Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation,
Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course
you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to
become a certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to us lead- afe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
IF YOU'RE NOT
,LEAD SAFE CERTIFIED,
_DISTURBING
'JUST SIX
SQUARE FEET.
:COULD COST YOU
-BIG TIME:
Date )d
��T F E \ 1
r j "