HomeMy Public PortalAbout12-0001 SofaCity of Tybee Island • Community Develop nt Dept.
Inspection Report
4C3 Butler Ave. • P,O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. _00,1
Owner's Name
Date Requested
Date eeded
3-2o.-12
3 - 2 1 -12.
-..._
wautfit
ratrziro
INTERNATIONAL
CODECOLINCII:
MEMBER
r_
Gen. Contractori:: (Vjr• Subcontractor
LD-7- go 2-b
Contact information
Project Address P\ ry, cc) o ,D c1
Scope of Work e L z 6._ pDc c
inspector 720
Inspection ck m c. CcOt
Date of Inspection/ /
r) ---
t R,,ss•tit --tec. ,
!---;---'
Ins ection 4- . f.' cd 2 \ e 6 • Pass gr. Fail( ee
Inspection 6 <43 .
Pass F1 Fail
e
Inspection Pass Fail Fee
COASTAL
SASH AND DOOR, INC.
DISTRIBUTORS OF:
1i VIN
Nirvdaws ..d Daoef
Madeforyou"
February 13, 2012
Mr. & Mrs. Kevin Sofa
7 Palmwood Ct.
Tybee Island, GA
Dear Mr_ Sofa:
Please be advised that the windows on the above referenced project are all Storm Plus
Impact Zone III. They will meet all local design pressures and Impact codes for this
region, please see attached test report.
If you have any questions or need any additional in
call.
nation please do not hesitate to
Toby Tift
Coastal Sash and Door, Inc.
8422 Ferguson Avenue
Savannah, GA 31406
(912) 352 -3930
206 B Sylvan Drive
St.Simmons, GA 31522
(912) 634 - 1414
3653 Regent Boulevard, Ste. 205
Jacksonville, FL 32224
(904) 641 -0346
960185 Gateway Boulevard
Amelia Island, FL 32034
(904) 261- 0488
Architectural Testing
AAMA 450 -06
TEST REPORT
Rendered to:
MARVIN WINDOWS AND DOORS
SERIES/MODEL: Clad Ultimate Double Hung StormPlus IZ3 Combination Assembly
PRODUCT TYPE: Aluminum Clad Wood Combination Assembly
Report No.:
Test Dates:
Report Date:
Expiration Date:
849 Western Avenue North
St. Paul, MN 55117
phone: 651 - 636 -3835
fax: 651 - 636 -3843
www.archtest.com
75302.03 - 201 -47
07/24/07
08/09/07
07/24/11
Architectural Testing
AAMA 450 -06 TEST REPORT
Rendered to:
MARVIN WINDOWS AND DOORS
Highway 11 West
P.O. Box 100
Warroad, Minnesota 56763 -0100
Report No.:
Test Dates:
Report Date:
Expiration Date:
75302.03- 201 -47
07/24/07
08/09/07
07/24/11
Project Summary: Architectural Testing, Inc. (ATI) was contracted by Marvin Windows and
Doors to perform testing on a Series/Model Clad Ultimate Double Hung StormPlus IZ3 3234
2W Combination Assembly. Test specimen description and results are reported herein.
Test Specification: The test specimen was evaluated in accordance with AAMA 450 -06,
Voluntary Performance Rating Method for Mulled Fenestration Assemblies, for conformance to
a Design Pressure of +2640, -3120 Pa ( +55.0, -65.0 psf)
Test Specimen Description:
Double Hung Window: H -R55* 1000 x 1956 (39 x 77) per ANSI/AAMA/NWWDA
101/I.S.2 -97 and H -LC55* 1000 x 1956 (39 x 77) per 101/LS.2/NAFS -02 and
AAMA/WDMA/CSA 101/I.S.2/A440 -05 (See All report no.: 75302.01 - 201 -47 for complete
specimen description)
Series/Model: Clad Ultimate Double Hung StouuPlus IZ3 3234 2W Combination
Assembly
Product Type: Aluminum Clad Wood Double Hung Combination Assembly
Overall Size: 1924 mm (75 -3/4 ") wide by 1940 mm (76 -3/8 ") high
Individual Unit Size (2): 949 mm (37 -3/8 ") wide by 1940 mm (76 -3/8 ") high
Upper Sash Size (2): 876 mm (34 -1/2 ") wide by 937 mm (36 -7/8 ") high
Lower Sash Size (2): 876 mm (34 -1/2 ") wide by 981 mm (38 -5/8 ") high
Screen Size (2): 965 mm (38 ") wide by 1911 mm (75 -1/4 ") high
Area: 3.7 m2 (40.2 ft2)
849 Western Avenue North
St. Paul, MN 55117
phone: 651 - 636 -3835
fax: 651 -636 -3843
www.archtest.com
Architectural Testing
Test Specimen Description: (Continued)
The following descriptions apply to all specimens.
75302.03- 201 -47
Page 2 of 4
Mullion Description: Rectangular units are mulled together by sandwiching the 25 mm
(1 ") by 114 mm (4 -1/2 ") LVL mull filler between the jambs using #8 by 32 mm (1 -1/4 ")
screws, staggered spacing on opposing sides of the mull, with 381 mm (15 ") on center as the
maximum spacing. Two 10 mm (3/8 ") beads of OSI PL -400 adhesive run the length of the
mull filler on both sides, maintaining a minimum 13 mm (1/2 ") from either edge. An
aluminum mull cap was applied to the exterior.
Installation: The assembly was installed within a wood buck and secured with structural
brackets. The structural brackets were located at the sill, jambs and head. The bracket;
were spaced at 152 mm (6 ") from the corners and 381 mm (15 ") on center maintaining a 13
mm (1/2") rough opening gap at points of attachment. The structural brackets were attaches'
to the unit with two #8 by 16 mm (5/8 ") screws and to the buck with four #6 by 38 mm (1-
1/2") screws. The mullion was anchored with two structural brackets on each side of the
mullion. The jambs were additionally secured with #8 by 64 mm (2 -1/2 ") screws through the
storm brackets; the check rail brackets had two screws and the bracket near the sill had one
screw.
Test Results: The results are tabulated as follows:
Title of Test - Test Method Results
Air Infiltration per ASTM E 283
75 Pa (1.57 psf) (25 mph) ( <0.05 L /s /m2)
<0.01 cfiulft2
300 Pa (6.24 psf) (50 mph) (0.05 L /s /m2)
0.01 cfm/ft2
Water Resistance per ASTM E 547
400 Pa (8.25 psf) No leakage
Uniform Load Deflection per ASTM E 330
(Deflections reported were taken on the mullion)
(Loads were held for 60 seconds)
2640 Pa (55.0 psf) (positive) 4.83 mm (0.19 ")
3120 Pa (65.0 psf) (negative) 11.68 mm (0.46 ")
Uniform Load Structural per ASTM E 330
(Permanent sets reported were taken on the mullion)
(Loads were held for 10 seconds)
3960 Pa (82.5 psf) (positive) 0.25 mm (0.01")
4680 Pa (97.5 psf) (negative) 0.25 mm (0.01")
Architectural Testing
75302.03- 201 -47
Page 3 of 4
Detailed drawings, data sheets, representative samples of test specimens, a copy of this report, of
other pertinent project documentation will be retained by Architectural Testing, Inc. for a period
of four years from the original test date. At the end of this retention period, such materials shall
be discarded without notice and the service life of this report will expire.
Results obtained are tested values and were secured by using the designated test methods. Nc
conclusions of any kind regarding the adequacy or inadequacy of the glass in the test specimen
can be made. This report does not constitute certification of this product nor an opinion cm
endorsement by this laboratory. It is the exclusive property of the client so named herein and
relates only to the specimen(s) tested. This report may not be reproduced, except in full, withoul
the written approval of Architectural Testing, Inc.
For ARCHITECTURAL TESTING, INC:
PySignedb: SchoonthOw
Eric J. Schoenthaler
Project Manager
EJS:es
Daniel A. Johnson
Director - Regional Operations
Attachments (pages): This report is complete only when all attachments listed are included.
Appendix -A: WDMA Submittal Forms (2)
Appendix -B: Drawings (34)
Architectural Testing
Revision Log
Rev. # Date Pages) Revision(s)
0 08/09/07 N/A
75302.03 -201 -4
Page 4 of 4
Original report issue. Report and drawings
forwarded to AMS for Hallmark
Certification.
S ORMPL US IMPACT ZONE 3
CLAD ULTIMATE DOUBLE HUNG
MARVIEM
Windows and Doo)t
Built aroundyou:
Mas. Opg. 1 -9 7/8 (556) 2 -1 7/8 (657) 2 -5 7/8 (759)
Rgh. Opg. 1 -10 3/8 (568) 2 -2 3/8 (670) 2 -6 3/8 (772)
Frame Size 1 -9 3/8 (543) 2 -1 3/8 (645) 2 -5 3/8 (746)
Glass Size 16" (406) 20" (508) 24" (610)
C.- CO 00)
MvMLO
CO CO CO
CO In N 0
CO V rO
V V V GO
-4- CI . +
d d' M CO
ti7 LO CO
CO In
V •. C)-
(0 CO
W co W
U)NC')
V. V V
t I CO
C) t[) an N
CUDH1622
+55
-65
CUDH1624
CUDH1626
CUDH1628
CUDH2022
+55
-65
CUDH2024
CUDH2026
CUDH2028
CUDH2422
CUDH2424
CUDH2426
CUDH2428
2 -7 7/8 (810)
2 -8 3/8 (822)
2 -7 3/8 (797)
26" (660)
+55
-65
CUDH2622
CUDH2624
CUDH2626
CUDIi2628
Additional information applies to the products listed above. Please refer to page 3.
2 -9 7/8 (860)
2 -10 3/8 (873)
2 -9 3/8 (848)
28" (711)
CUDH2822
CUDH2824
CUDH2826
CUDH2828"
09/2006 MOST CURRENT VERSION IS IN MARVIN ON AF DOCS Printed On Feb 13, 2012 10:08 am
3 Performance Education Handbook
City of _ ,ee Island • Community Develot. Aent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 9/2.786.4573 ext. 114 • Fax 912.786.9539
11:11‘16-
malt"
linvamla
INTERNATIONAL
CODE COUNCIL'
MEMBER
Permit No. , Date Requested /
Owner's Name Date Needed ;_. l-71
Gen. Contractor I-- I i7,711",- T4. Subcontractor
Cant-act Information '"_57--) -
Protect Address 11-. 7
Scope of Work
Inspector 1
Inspection
Date of Inspection
Pass
Fail Fee
Inspection 17Z - Pass D Fail
Inspection i 'QS - Pass
F
ee
Fee
Inspection Pass Fail Fee
City oi.__ Jee Island • Community Develeent Dept.
Inspection Report
403 Butler Ave. = P.O. Box 2749 • Tybee Island; GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786' ,9539
Permit No. 731
Owner's Name - A
Date Requested G%
Date Needed
PAWN
INTERNATIONAL
CODE COUNCIL'
MEMBER
-7 /4)
! 1_
Gen. Contractor ^' = >,i L-', Subcontractor
`• i i i � LI) c7 ' f J 0
Contact Information
} n
Project Address
Scope of Work
Inspector r,1 l
Inspection
Date of Inspection
Pass
1/ ,� ',_•,
Fee
Inspection Pass El Fail "' Fee -)
« "ic (2)r i l
p-,1-2-01)) 1 L Azi i i t, �
r �
Inspection Pass ["—i Fail El Fee
Inspection Pass ❑ Fail Fee
MARVIN -;
Built around you
Homeowner I Windows I Double Hung I Ultimate Double Hung I Features And Benefits
DOUBLE HUNG
FIND A DEALER
Zip /Postal Code
INTERNATIONAL
Page 1 of 2
SEARCH SITE
Keyword
REQUEST INFORMATION
REQUEST INFORMATION • ENEWS SIGN UP
OPTIONS SIZES PERFORMANCE AND SPECS PRODUCT DESIGNER
FEATURES AND BENEFITS
Ultimate Double Hung Window
PHOTO CALLER"
Marvin's Ultimate Double Hung combines state -of- the -art window design with a classic style of the past to offer unparalleled
value and timeless beauty Advanced engineering and the highest quality construction make our Ultimate Double Hung
windows incredibly durable. versatile and easy to use
• Engineering advancements make Ultimate Double Hung easy to open and close
• Exclusive integrated tilt lever lock allows sash to be tilted in or removed for effortless cleaning
• Choose from rectangular or round Double Hung windows shapes
Standard Features
• One lite LoET -272 with argon insulating glass
• Satin Taupe sash lock
• Bare wood interior
• All -wood brick mould casing (wood units)
• 8° sill bevel
• DP50 performance rating
Ultimate Double Hung Round Top Window
Our Ultimate Double Hung Round Top windows feature a half round or an elliptical upper sash. Choose from the following
variations.
Standard double hung window with Double hung window with a true
a half round or elliptical transom radius upper sash and frame Both
Available as a wood or clad -wood the interior and exterior have a
window radius top. Available as a wood or
clad -wood window.
Standard double hung window on
the interior with arched exterior
casing This variation is the most
economical method of achieving a
round top appearance Available as
a wood window
http: / /www.marvin.com/windows/ wood - double - hung - windows /features - and - benefits/ 2/9/2012
f--•
`t City of TYPee Island • Community Developh—nt Dept.
Inspection Report
us%
403 Butler Ave. • P.O. Box 2749 • Tybee :Island, GA 31328
INTERNATION4
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL'
I MEMBER
Permit No. (7, -(.X.X..) 1 Date Requested
Owner's Name '''(:;.)-F-A Date Needed
Gen. Contractor 17---■ 77.247 7-1 Subcontractor
---
Contact Information
Project Address 1
Scope of Work I---7,1_-_-_1 c..):),7-- T,--I-7—t--1
Inspector
Inspection 0-P- Pass s
Fee
Date of Inspection
Inspection Pass Faii D Fee
Inspection Pass r 1 Fail E Fee
-j
Inspection Pass
DATE ISSUED: 01 -3 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ENCLOSE EXISTING PORCH
7 PALMWOOD CT
OWNER NAME KEVIN SOFA
ADDRESS 7 PALMWOOD CT
CITY, ST, ZIP TYBEE ISLAND GA 31328 -9796
PHONE NUMBER
CONTRACTOR NAME FIRST CITY ENTERPRISES
ADDRESS PO BOX 1016
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
207
P
$ 353.00
PROJECT VALUATION $25,500.00
PERMIT #: 120001
TOTAL BALANCE DUE: $ 353.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Location:11 7 P11.),
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
L
MwoOd. C0Z
NAME
ADDRESS
PIN #
TELEPHONE
Owner
EleAkt i - i k)
A
I j imwoo k U�
p -6,
° 9701
Architect
or Engineer
,
' %A
Building
Contractor
f ST I‘l
£N �rprnS$
f%" o -ra
Ti j
�A).D _ l 313.2 �?
/
� L�
-511(
(Check all that apply)
❑ Repair
Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
q/C15 , CO ar� pirdr■ t MA kk A Details of Proj ect: �Iu e (d A
SUN OOiA •
Residential
►� Single Family
n Duplex
❑ Multi- Family
❑ Commercial
n Footprint Changes
n Discovery
Demolition
Estimated Cost of Construction: $ 25 5 pa 0 0
Construction Type .. (Enter appropriate number)
(1) Wood Frame (4) Masonry
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
01 rte�.J
With culvert?
Rear
# Bathrooms
c_0. -c -I-Co led
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through NA/Per d
On -site waste and debris containers will be provid d by COP Ja (4C r
Construction debris will be disposed by copirpc 0,,r by means of Wpck.. C@ jug .
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 0,
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature
Date
2 0 )c.. S0
FEES
Permit 172
Inspections _
Water Tap
Sewer Stub
Aid to Const. 1 • lb 4
TOTAL 3 3
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov/lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to use l:ad -salie work practices in EPA's Steps to Le d Saf Renovation, Repair and Painting.
f:ij4 • 12 2 h)
Date
IF YOU'RE NOT
!Ea SASE CE RTI• IE D
.DISTURBING
JUST SIX
SQUARE FEET
COULD COST YOU
.BIG TIME
Signature
Printed Name
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
Printed Name
I
Date /27// I
Office Use Only
Project Address:
Permit Number:
°A .Q.Apsprod;nc' Set - : Fors Niu
g Sri
QC1 i Site at All Ti "
at
?
ii i it
11111011 dill
.. +sr..u.riay. .n..•rwJ,eC asuch.,.e _ _n1.,utt.V.,dtaatnmu
I il 1
al
I�ecauarrs;1111111'111 i ; ` + :
. '••, � ^rte `..; �'
ee •
•
1.J
ALL CO ?5TRUC: ll`iN MUST COMPLY WITH THE
SSTO to 45.e___ ND THE, i w ONE AND TWO
FAMILY DWELLING CODE 2ac)t... EDITION
STATE OF GEORGIA AMENDMENTS
REVIEW FOR CODE COMPLIANCE
Every aflort i _^ be!':n to Identify
code ' I Diea ions, 1'0 O 6'gigha by the
reviewer bap on ' 'Yu :ai as authority
to
�f4' 7i �:� ? ,i t r 1, .. .. s apvp pis' aye Y�s�e t aside
a n �+.�Srbb� E : .r. ..J or c dinane.e he
re`Ji 9 ?':? s`d p t'i31 ; °s;�i 3i3 not be construed
fr t v7 h'y cr
itz
7 f4 41'
17/
5.06•1
QA✓
t
L. :344 2 5 khli
ANC
G,STD 10-99 TABLES 602A1,
AND IC 312.1.2 fl
WINDOWS; GLASS DOT S SHALL Sfi
APNIOVED AND lij3TALLEf7: TO BOTii
POSITIVE MO
Tz). fait
tealNA • •A•
/ tr
OG7h/rt,f,c-ir (.1(01:>-04.4,„)
74d5e5f,,7,106,Lt_t.
1,0 tdOUJS (IV f.t-4-)0.1", 3
Lc)
•
0.01.00m4
t c;) Woo
10i otiDLOS 4c4`s*
yt.Loum vivk ,e4
t.s—rtit.
44 4(2.014o -rto
til Ineulat!or.s miLlt
k:ompiy with The ezeor04
'late Enc6rgy Codt
_14.74 Editi*q
and Stets (if Georg:111
Amendlisnli
12.111,6 Ll'"O
r 1.4)
• '6.0-4i1...) r--
I
"
F t . 0 0 t - P L C
E P C - L a 5 i 0 4 i
A i l E l e c t r i c a l l i t a i l a '