Loading...
HomeMy Public PortalAbout19-9688 Authorizing the Interfund Transfer of $133,424.29 from the Storm Water DivisionSponsored by: City Manager RESOLUTION NO.19-9688 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE INTERFUND TRANSFER OF $133,424.29 FROM THE STORM WATER DIVISION WITHIN THE ENTERPRISE FUND TO FUND PAYMENT FOR APPROPRIATE LINE ITEM EXPENSES, PROVIDING FOR ADOPTION OF REPRESENTATIONS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, in order to comply with the legal requirements pertaining to budgets and budget amendments, it is necessary for the City Commission of the City of Opa-Locka to authorize the Acting City Manager to appropriately re-classify certain line item expenditures for financial reporting and accuracy; and WHEREAS, the City requires a permanent transfer of funds in the amount of $133,424.29 ($31,705.00 Stormwater Fund, Rentals and Leases) and $101,719.59 (Stormwater Fund, Working Capital Reserve) within the Stormwater Division to Stormwater Fund, Other Contracted Services; and WHEREAS, the City considers the authorization of the Inter -Fund Transfer Transactions for transfer of funds for the 2018-2019 budget year, not to exceed $133,424.29 as in the best interest of the City residents. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA: Section 1. Adoption of Representations. The above recitals are true and correct and are incorporated into this Resolution by reference. Section 2. Authorization of Fund Transfer. The City Commission hereby authorizes the transfer of funds as set forth below: From Object Code Amount Stormwater Fund, Rentals and Leases 450-538440 ($31,705.00) Stormwater Fund, Working Capital Reserve 450-538992 ($101,719.59) Resolution No. 19-9688 To Object Code Amount Stormwater Fund, Other Contracted Services 450-538340 $133,424.29 To be used for the payment to World Petroleum Corp. for oil spill and other related expense thereto. Section 3. Effective Date. This Resolution shall take effect immediately upon adoption and is subject to the approval of the Governor and his designee. PASSED and ADOPTED this 7th day of August, 2019. Matthew A. Pigtt, Mayor ATTEST: a Flores, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: orris- eeks, P.A. Moved by: Commissioner Kelley Seconded by: Commissioner Burke VOTE: 5-0 Commissioner Bass: YES Commissioner Burke: YES Commissioner Kelley: YES Vice -Mayor Davis: YES Mayor Pigatt: YES City of Opa-Locka Agenda Cover Memo Department Director: Airia Austin Department, Director ().4 Signature: Acting City Manager: Newall J. Daughtrey CM Signature: Commission 08/07/2019 Item Type: Resolution Ordinance Other Meeting Date: (EnterX in box) X Fiscal Ordinance Reading: 1st Reading 2"d Reading Impact: Yes No (Enter X in box) (Enter X in box) x Public Hearing: Yes No Yes No $120,424.00 (Enter X in box) x x (Enter Fund & Dept) Advertising Requirement: Yes No Funding Source: Account# : 001-381010 Ex: (Enter X in box) x Contract/P.O. Yes No RFP/RFQ/Bid#: Required: (Enter X in box) x Strategic Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: Plan Related (Enter X in box) x Enhance Organizational NM Bus. & Economic Dev 1N Public Safety m Quality of Education NM Qual. of Life & City Image IN Communication III (list the specific objective/strategy this item will address) Sponsor Name City Manager Department: City Manager Short Title: A resolution authorizing the city manager to execute fund transfer. Staff Summary: The Office of the inspector general denied payment to World Petroleum Corp. based on process. This payment was approved under Resolution No. 19-9657 for $120,424.00, Acc. # 81-581920 Proposed Action: Staff recommends approval. 1. Agenda 2. Resolution No. 19-9657 3. City of Opa-locka Budget Adjustment MEMO TO: Newall J. Daughtrey, Acting Interim City Mana FROM: Airia Austin, PWD & CIP Director 0/.. DATE: July 19, 2019 1,4 RE: Emergency Storm Drain Cleaning at NW 127th Street World Petroleum Corporation The request for approval of payment to World Petroleum Corporation for the Emergency Storm Drain Cleaning at NW 127th Street, which was charged to the General Fund Reserve, was denied by the State because spending out of the line item is not permitted. In response to the State, we are requesting an amendment to transfer funds from the Rentals and Leases and the Working Capital Reserve to Other Contracted Services in the Stormwater Fund. The funds for working Capital are encumbered against the contract for the VAC Truck that requires approximately $60,000.00 in September. A budget amendment is expected to happen by/before the end of the year to allow funding for bill payment, and if anything funds from other unspent line items can be reallocated. You should completely reduce your capital reserve by $101,719.59 and reduce the rental and leases by $31,705.00. This amendment will clear the current overage in the contracted services line item and provide funding to the aforementioned vendor for services provided. 'SEND OF MEMORANDUM* ,R • ,ti' • REQUESTED REQUIRED 05/29/19 05/29/19 PAGE 1 REQUISITION 19002101 DEPT/DIVISION 81 BUYER RESERVES CITY OF OPA-LOCKA SHIP TO CMGR VENDOR 20229 CITY MANAGER'S OFFICE WORLD PETROLEUM CORPORATI CITY OF OPA-LOCKA 780 FISHERMAN ST 4TH FLOOR PO BOX 291197 OPA-LOCKA, FL 33054 DAVIE FL 33329 ATTN: MR. AUSTIN/YESLY GUILLEN CONTRACT AGREEMENT FOR EMERGENCY FREIGHT STORM DRAIN CLEANING @ NW 127TH STREET Rich, This request is only intended for approval of Purchase Order. Please do not process payment yet. See YG or AA if any questions. Thank you! LN/ST COMMODITY STOCK NO QUANTITY UOM 01 1.00 0 CONTRACT DATED MAY 9, 2019 PROPOSAL DATED 04/24/2019 RES# 19-9657 UNIT PRICE 120,424.0000 TOTAL PRICE EXTENSION/ TAX/TRADE-IN 120,424.00 0.00 0.00 120,424.00 DIVISION ACCOUNT TASK ACCOUNT CHARGE AMOUNT 81 581920 120,424.00 4 Q • "'° v)_C REQUISITION TOTAL 120,424.00 PAGE TOTAL 120,424.00 * WORLD PETROLEUM CORP PO BOX 291197 DAVIE FL 33329 WorldPetroleum P: 954-327-0724 F: 954-327-0755 CORPORATION Proposal Submitted To: City of Opa Locka Phone: 786-877-4015 Date: 04/24/2019 Fax: Street: Job Name: Storm Drain Cleaning City, State, and Zip Code: Job Location: NW 127th St Attention: Mr. Owen Carney Email: ocarney@opalockatl.gov WORLD PETROLEUM CORP IS PLEASED TO SUBMIT OUR PROPOSAL FOR THE LABOR, EQUIPMENT, AND TRANSPORTATION REQUIRED TO CLEAN MULTIPLE STORM DRAINS AT THE ABOVE REFERENCED SITE. THIS WORK AS ITEMIZED BELOW: UNIT TOTAL ITEM #1: VACTOR TRUCK #1 WITH OPERATOR: @ $180.00/HR 60 HR $10,800.00 (4 HR MINIMUM) PORTAL. TO PORTAL ITEM #2: VACTOR TRUCK #2 WITH OPERATOR: @ $180.00/HR 60 HR 510,800.00 (4 HR MINIMUM) PORTAL TO PORTAL ITEM #3: TRACTOR TRAILER #1 WITH OPERATOR: @ $105.00/11R 60 HR $6,300.00 (4 HR MINIMUM) PORTAL TO PORTAL ITEM #4: TRACTOR TRAILER #2 WITH OPERATOR: @ $105.00/HR 60 HR $6,300.00 (4 HR MINIMUM) PORTAL TO PORTAL ITEM #5: CERTIFIED FIELD TECHNICIAN: @ $65.00/HR 60 HR $3,900.00 ITEM #6: DISPOSAL OF NON -HAZARDOUS WASTEWATER AT @ $0.36 PER GALLON: (WORSE CASE SCENARIO 20,000 GL) $7,200.00 ITEM #7: DISPOSAL OF NON -HAZARDOUS SLUDGE/SOLIDS AT @ $1.50 PER GALLON: (WORSE CASE SCENARIO 54,316 GL) $81,474.00 ESTIMATED TOTA $120,424.00 Business hours are Monday through Friday 7:00am-5:00pm. World Petroleum will not be responsible for removing diffusers if they apply. The customer will be responsible for locating the drains before the start of the project. The customer will be responsible for moving any vehicles that obstruct the drains. If there is a large quantity of water in the drain system, the customer will be responsible for directing World Petroleum where to dispose of the water. If personnel or equipment is no longer necessary onsite, the customer will not be billed. If the scope of work exceeds or undermines the estimated total, the bill will be adjusted and verified by the customer. World Petroleum will provide the customer with proper disposal documents upon completion. PLEASE NOTE: IF CIRCUMSTANCES BEYOND TIIE CONTROL OF WORLD PETROLEUM CORP REQUIRE DIFFERENT AND ADDITIONAL LABOR NOT INCLUDED ABOVE, THE CLIENT WILL BE CHARGED AT THE QUOTED HOURLY RATE. A SIGNED PROPOSAL (HARD COPY) AND PURCHASE ORDER (IIARD COPY) ARE REQUIRED PRIOR TO INITIATING THE WORK. IF MATERIALS ARE CHARACTERIZED TO BE "HAZARDOUS," AMOUNT DUE WILL BE ADJUSTED ACCORDINGLY. IF PAYMENT IS ENFORCED VIA A LIEN, ALL ASSOCIATED COST WILL BE THE RESPONSIBILITY OF CITY OF OPA LOCKA. We Propose hereby to fumish material, labor and complete project in accordance with above specifications. PAYMENT DUE NET 30 DAYS FROM RECEIVING INVOICE All material is guaranteed to he as specified. All work to be completed in a workmanlike manner according to standard practices. "A service charge equal to the maximum legal interest allowed by law will be charged on all accounts with balances that are past due, in the event World Petroleum Corporation has to retain an attorney to recover any sum that may be due under this agreement or order, then in such event, the customer shall reimburse World Petroleum Corporation, for all fees incurred together with all costs of litigation and other expenses incurred in connection with said collection." Please he adsised that World Petroleum Corporation invoicing will only reflect actual quantities removed and the work performed. All agreements contingent upon strikes, accidents or delays beyond our control. Owner shall carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. Acceptance of Proposal, The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified, SIGNATURE AUTHORIZATION: Date WORLD PETROLEUM Date CITY OF OPA LOCKA Sponsored by: City Manager RESOLUTION NO.19-9657 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, WAIVING THE PROCUREMENT REQUIREMENTS ON AN EMERGENCY BASIS; AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH WORLD PETROLEUM CORPORATION IN THE AMOUNT OF ONE HUNDRED TWENTY THOUSAND FOUR HUNDRED AND TWENTY- FOUR DOLLARS ($120,424.00), FOR ENVIRONMENTAL SERVICES; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Staff has discovered there is a tremendous amount of oil in the drainage system on Northwest 127t Street; and WHEREAS, as such, DERM has requested immediate action to clean up the system; and WHEREAS, Staff has identified World Petroleum Corporation as a reliable vendor to perform these environmental services; and WHEREAS, Staff recommends the City Commission waive the procurement requirements on an emergency basis, and authorize the City Manager to enter into an Agreement with World Petroleum in the amount of One Hundred Twenty Thousand Four Hundred and Twenty -Four Dollars ($120,424.00), for environmental services. NOW THEREFORE, BE IT RESOLVED THAT THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Section 1. RECITALS ADOPTED The recitals to the preamble herein are incorporated by reference. Resolution No. 19-9657 Section 2. AUTHORIZATION. The City Commission hereby waives the procurement requirements on an emergency basis, and authorizes the City Manager to enter into an Agreement with World Petroleum Corporation in the amount of One Hundred Twenty Thousand Four Hundred and Twenty -Four Dollars ($120,424.00), for environmental services. Section 3. SCRIVENER'S ERRORS. Sections of this Resolution may be renumbered or re -lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. EFFECTIVE DATE. This Resolution shall take effect immediately upon adoption, and is subject to the approval of the Governor of the State of Florida or his designee. PASSED AND ADOPTED this 8th day of May, 2019. Attest to: Joa Flores City Clerk MATTHEW A. PIGATT MAYOR Approved as to form and legal sufficiency: BROWN LAW GROUP, LLC City Attorney Resolution No. 19-9657 Moved By: COMMISSIONER KELLEY Seconded by: VICE MAYOR DAVIS Commissioner Vote: 5-0 Commissioner Kelley: YES Commissioner Bass: YES Commissioner Burke: YES Vice Mayor Davis: YES Mayor Pigatt: YES City of Opa-Locka Agenda Cover Memo Department Director: Airia Austin Department Director Signature: j. , , Acting City Manager: Newall Daughtrey CM Signature: Commission 05/08/2019 Item Type: Resolution rdinadcei ther Meeting Date: (EnterX in box) X Fiscal Impact: (Enter X in box) Yes No Ordinance Reading: (Enter X in box) in Reading 2nd Reading $120,424.00 X Public Hearing: (EnterX in box) Yes No Yes No X X Funding Source: Account# 81-581920 (Enter Fund & Dept) Ex: Advertising Requirement: (EnterX in box) Yes No X Contract/P.O. Yes No RFP/RFQ/Bid#: RFP # Waive of BID Required: (Enter X in box) X Strategic Plan Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) Related (EnterX in box) X Enhance Organizational EN ! Bus. &Economic Dev IN Public Safety m Quality of Education MI Qual. of Life & City Image ,go Communication MI Sponsor Name City Manager Department: City Manager Short Title: Request for waiver of bid for the emergency procurement, approving the hiring of World Petroleum Corporation at a sum of $120,424.00, and authorizing the City Manager to enter into an agreement. Staff Summary: The purpose of this request is to take emergency action to clean the storm drain system on NW 127th Street in order to prevent oil from entering into the canal system and addition this is a requirement from DERM. Proposed Action: Staff recommends approval of this proposal. Attachment: 1. Agenda 2. CBI Environmental Services Proposal 3. Raider Environmental Services Proposal 4. World Petroleum Corporation Proposal 5. Memo of explanation 'From tlie Office c.,,f , 1.7. U., f. ' . MEMO TO: Newall J. Daughtrey, Acting City Manager FROM: Airia Austin, CIP & PWD Director DATE: May 8, 2019 RE: Emergency Declaration in Compliance with Section 2-320 (i) Three weeks ago we found out that the Drainage System on NW 127th Street was full with a tremendous amount ofoil, and DERM is requesting immediate action to clean up the system. If we do not correct this action it will result in daily fines of $250.00 up to $10,000.00. The reason for this long delay is because we were in the process of identifying a vendor to perform this job and selecting the best proposal. Vendor Short Description Cost CBI Environmental Services Supply all labor, materials and equipment to Vac -Con clean drainage sumps and structures of all soil and debris located at NW 127th Street $163,650.00 Raider Environmental Services Cleaning, transportation and disposal of the contaminated water and sludge and grit from the storm drain system on NW 127th Street $129,200.00 World Petroleum Corp. Labor, equipment, and transportation required to clean multiple storm drains at NW 127th Street $120,424.00 As a result of that urgent situation, and in an effort to prevent harm to the City and its residents, I declared an emergency to enable the most expeditious, effective and lawful response allowable in accordance with the relevant section of the City's Code. I hereby certify that the information provided above is true and correct to the best of my knowledge. Enclosures ***END OF MEMORANDUM*** 780 TISVEVIfANSMET • 4w EGOOR • OPA-LOCKA • ELOWA • 33054 Wr: (305)953-2868 FAX: (305)953-2870 CBI CIiCrC Berry, lint;. Emir rtmentaI SerA es April 22, 2019 Project Proposal: STORM DRAINAGE BASIN CLEANING AND JETTING CLAIRO LANE & NW 127711 STREET IMPROVEMENTS Customer: Contact: Phone it: Address: City of Opa-Locka Owen Carney 1-305-953-2828 12950 Lejeune Ave Opa-Locka, FL 33054 Proposal Sent Via Email: ocarnev .opalockafl.pov Dear Mr. Carney: Cliff Berry, Inc. (CBI) has been offering comprehensive Environmental Services for over six decades by combining proven technical expertise and problem solving proficiency. We have supported our customers in developing cost effective solutions for all of their environmental requirements. Cliff Berry, Inc. (CBI) is pleased to provide you with a personalized pricing proposal to execute the following Scope of Work referenced below: Scope of Work: Cliff Berry, Inc. (CBI) will supply all labor, materials and equipment to Vac -Con clean (14) — 4 x 4 x 6 drainage sumps and structures of all soil and debris located at the above -mentioned site. In addition, CBI will jet clean approximately 2000 liner feet of connecting 24-inch diameter drainage pipe to remove any soils or debris. CBI will dispose of all contaminated soil and water generated during the duration of the project. Price to include labor, material and equipment... $8,200 per day Note: This project estimated @ 14 ten-hour days Disposal of soil: Estimated Volume 220 tons in total 22 ton minimum on transportation per load Disposal of contaminated soil Transportation of contaminated soil Transportation Demerge if required Equipment operator and backhoe Disposal of oily water: Estimated at 50.000 gallons Disposal of oily water Transportation of oily water Total (Estimated) cost of project... $85.00 per ton $15.00 per ton $60.00 per hour $2,900.00 flat rate $ 0.38 per gallon $ 550.00 per 6000 gallon load C $163,650.00 Estimate Site Location: 127° Ave and Opa-Locka Blvd. P.O. BOX 13079 Port Everglades Station, Fort Lauderdale, Florida 33316 Office: (954) 7613390 Fax.: (954) 763.8376 www.diffberryinc.com 1. Once the project has been accepted and confirmed to CBI for execution, we shall schedule this project on a mutually agreeable date with a minimum of five (5) business days' lead-time. 2. All waste is subject to Profile Approval from the certified disposal facility and will be manifested (actual quantity), transported and disposed of in accordance with all Federal, State and Local regulations. 3. Any waste accepted that is not in compliance with approved profile will be communicated with the customer within 72 hours of receipt. Pricing adjustments will be applied where applicable. 4. Our rates are based on a Monday thru Friday 0800 — 1700 workweek. If weekend work and/or second/third shift work is required and authorized, overtime rates will be charged at one and a half straight time rates and double on observed govemment holidays. 5. It is the customer's responsibility for payment of any tariffs, fees, taxes, and administrative costs which CBI may incur in the execution of this project. Any additional fee(s) shall be indicated as a separate line item on the final invoice. 6. A fuel surcharge shall be added to all invoices in accordance with the "National Average Diesel Fuel Index". 7. A signed Purchase Order, Job Authorization Form or this Proposal is acknowledging agreement with the terms and conditions of this document and is required prior to job commencement. 8. Any demurrage charges that are NOT caused by CBI's field personnel shall be billed to the customer. 9. This estimate applies only to the job described above. This pricing does not include additional materials or labor that may be required due to any unforeseen problems that may arise once the project has begun. If additional labor and equipment is required, it will be invoiced at "Time & Material" rates. 10. This proposal is an estimate based on limited known conditions. If the scope of work changes CBI reserves the right to adjust its fee schedule as required. 11. Payment is CASH IN ADVANCE unless otherwise approved in advance by CBI's credit department. 12. The above rates are based on a (4) hour minimum. 13. Transportation charges are portal to portal. 14. Pricing is valid for (30) days from the date of this proposal. Supplemental Conditions: 1. Pricing is based on estimated days and availability of equipment at the time of sche 2. Any damage to rental equipment left on site overnight will be invoiced to the custom 3. It is the responsibility of client to have all manways and access ports open that are to the above quoted system for cleaning, prior to start of work. 4. CBI's liability to protect existing structures and utilities from damage is limited negligence. Due to the inherent risk associated with the methodology of the job, with existing damage during the course of decontamination. 5. CBI will require unimpeded access to the work site area. Cliff Berry, Inc. would like to thank you for the opportunity to submit pricing for this project. If you require additional details on this scope of work, please do not hesitate to contact the undersigned. CBI is committed to preserving our environment and combined with decades of documented work experience. It is our personal commitment to you that we shall execute this work with the highest degree of professionalism and environmental stewardship. All CBI field personnel are certified with 40-Hour OSHA training and are Confined Space Entry certified. Best Regards, Patrick Petrillo Account Manager Fort Lauderdale, FL 33316 Cell: 954-594-3872 Office: 954-763-3390; Ext. 1502 Fax: 954-763-8375 duling. er. need to make entry or access to the extent of CBI's direct CBI is not liable for structures Company Representative (signature) Title Company Representative (print) Date PS: Please sign and retum this project proposal at your earliest convenience so that we may verify our master schedule and confirm to you the exact time and date of the work to be performed. P.O. Box 13079 Port Everglades Station, Fort Lauderdale, Florida 33316 Office: (954) 763.3390 Faxc (964) 763.6305 worw.ctiffberryincacom ENVIRONMENTAL SE CES Apri130t, 2019 Airia Austin City of Opa Locka 780 Fisherman Street Opa Locka, FL 33054 Dear Mr. Austin In response to your request, Raider Environmental Services of Florida, Inc. is pleased to submit a proposal for the Cleaning, Transportation and Disposal of the contaminated water and sludge and grit from the storm drain system on NW 127t street, from NW 32" Ave to Cairo Lane. Scope of Work Raider will provide a vactor truck and operator to vacuum out all of the soil and any sludge and water jet all 15 and 24 inch lines totaling approximately 2000 linear feet.. This could take up to three full weeks due to the limited quantification of solids that have entered the system and the amount of petroleum product that will have to be removed. Raider is proposing to separate the job into three sections. 1- structure S 21 to S 23 and then S-24 2- structure S 24 to S25, S 26 S 27 and S 28 and S 29 3- structure S 29 to S 31, S 30 s 32 and S33 Each section will be isolated and pumped down into a supplied frac tank to gravity separate any possible petroleum contact water. The oil water portion of the frac tank will then be transported off site to Raider facility for disposal. The remaining petroleum free water will be decanted back to the system after the system has been cleaned. Raider will provide all pumps and necessary plugs to isolate the drainage system as needed for the cleaning process. Vacuum extracted materials will be staged onsite at a pre determined location area just west of 32" ave until enough material that has been stockpiled can be transported and disposed of, once approval has been accepted at our disposal facility. This proposal is based on the information provided via a site visit. We will be responsible for profiling, vacuuming, cleaning, transporting and manifesting the soil and any sludge all in compliance with US DOT regulations. Transportation of all waste will be in accordance with all transportation regulations including those described in 49 CFR 170-179, 40 CFR 61, 40 CFR 263, 40 CFR 112.7, and 40 CFR 761. The following will be the specific responsibilities: 1. Vacuum and pressure clean out all of the soil and any sludge from the storm drains. 2. Complete all applicable paperwork required for disposal and shipment for the sludge. 3. Remove, transport and dispose of the oily sludge. 4. Coordinate acceptance and transportation to the disposal facility. The following quote includes all labor, material and disposal for oily water. Raider can not quantify the amount of soil that is contained within the existing piping, we can only ascertain by what is visible to us.at time of inspection which was all catch basin were completely full of sand and debris which leads us to the worst case scenario that the pipes are also completely full although unlikely it is the worst case scenario. Taking that scenario into play, one would estimate the entire volume 45, 316 gallons as per City of Opa Locka personnel is dirt and a conversion factor 200 gallons per cubic yard is used. There could potentially be over 225 cubic yards of debris in the system. Soil disposal rates will be billed on actual scaled tonnage from Waste Management with a total not to exceed number of 35,000.00 The actual cleaning process, mobilization of equipment, oily water disposal, materials and labor cost are not to exceed 104,200.00 We appreciate the opportunity to service your environmental needs and look forward to working with you in the future. Please do not hesitate to contact me at (305) 994-9949 if you need further assistance. Sincerely, Orlando Solis Director of Compliance & Environmental Operations Raider Environmental Services of Florida, Inc. RAIDER ENVIRONMENTAL SERVICES OF FLORIDA, INC. COST PROPOSAL CUSTOMER: City of Opa Locka SCOPE OF WORK: Vacuum, Pressure Wash, Transport and Dispose of Soil and Sludge Description Quantity Unit Price Extended Price Vactor Truck and Operator 10 hours x $280.00/hour $42,000.00 Service Truck 10 hours x 15 $100.00/hour $15,000.00 days Field Tech 10hours x 15 $50.00/hour $7,500.00 Field Tech 10 hours x 15 days $50.00/hour $7,500.00 Frac tank rental 3 weeks plus 5 mobilizations 5 mob x 30 days $500.00 per mob, 50 a day $4,000.00 Disposal of contaminated soil 60.00 per ton Not to exceed 25,000.00 Miami Dade Water Meter + usage $ 5,000.00 Confined Space 1 flat rate $1750.00 $ 1,750.00 Pump +pipe plug rental 30days $550.00/day $16,500.00 Loader + operator 3 days $1500.00 day $ 4,500.00 Estimated Total 129,200.00 Terms and Conditions I. Charges will be based on actual tons removed for disposal. 2. Work to commence at the direction of the customer. 3. Payment for this project must be made within 30 days of completion. 4. Any and all taxes will apply. The undersigned agrees to and accepts the terms shown in this Cost Proposal. This proposal shall be in effect for 60 days from this date. Airia Austin, as Authorized Agent Date For City of Opa Locka WorldPetrol CORPORATION Proposal Submitted To: City of Opa Locke WORLD PETROLEUM CORP PO BOX 291197 DAVIE FL 33329 P: 954-327-0724 F: 954-327-0755 Phone: 786-877-4015 Date: 04/24/2019 Fax: itreet: Job Name: Storm Drain Cleaning City, State, and Zip Code: Job Location: NW 127th St Attention: Mr. Owen Carney Email: ocarney@opalockafi.gov WORLD PETROLEUM CORP IS PLEASED TO SUBMTT OUR PROPOSAL FOR THE LABOR, EQUIPMENT, AND TRANSPORTATION REQUIRED TO CLEAN MULTIPLE STORM DRAINS AT THE ABOVE REFERENCED SITE. THIS WORK AS ITEMIZED BELOW: ITEM #1: ITEM #2: ITEM #3: ITEM #4: UNIT TOTAL VACTOR TRUCK #1 WITH OPERATOR: @ $180.00/HR 60 HR $10,800.00 (4 HR MINIMUM) PORTAL TO PORTAL VACTOR TRUCK #2 WITH OPERATOR: @ $180.00/HR (4 HR MINIMUM) PORTAL TO PORTAL TRACTOR TRAILER #1 WITH OPERATOR: @ $105.00/HR (4 HR MINIMUM) PORTAL TO PORTAL TRACTOR TRAILER #2 WITH OPERATOR: @ $105.00/HR (4 HR MINIMUM) PORTAL TO PORTAL ITEM #5: CERTIFIED FIELD TECHNICIAN: @ $65.00/1R ITEM #6: DISPOSAL OF NON -HAZARDOUS WASTEWATER AT @ $0.36 PER GALLON: ITEM #7: DISPOSAL OF NON -HAZARDOUS SLUDGE/SOLIDS AT @ $1.50 PER GALLON: 60 HR $10,800.00 60 HR $6,300.00 60 HR $6,300.00 60 HR $3,900.00 (WORSE CASE SCENARIO 20,000 GL) $7,200.00 (WORSE CASE SCENARIO 54,316 GL) $81,474.00 ESTIMATED TOT $120,424.00 Business hours are Monday through Friday 7:00am-5:00pm. World Petroleum will not be responsible for removing diffusers if they apply. The customer will be responsible for locating the drains before the start of the project. The customer will be responsible for moving any vehicles that obstruct the drains. If there is a large quantity of water in the drain system, the customer will be responsible for directing World Petroleum where to dispose of the water. If personnel or equipment is no longer necessary onsite, the customer will not be billed. If the scope of work exceeds or undermines the estimated total, the bill will be adjusted and verified by the customer. World Petroleum will provide the customer with proper disposal documents upon completion. PLEASE NOTE: IF CIRCUMSTANCES BEYOND THE CONTROL OF WORLD PETROLEUM CORP REQUIRE DIFFERENT AND ADDITIONAL LABOR NOT INCLUDED ABOVE, THE CLIENT WILL BE CHARGED AT THE QUOTED HOURLY RATE. A SIGNED PROPOSAL (HARD COPY) AND PURCHASE ORDER (HARD COPY) ARE REQUIRED PRIOR TO INTTIATING THE WORK. IF MATERIALS ARE CHARACTERIZED TO BE "HAZARDOUS," AMOUNT DUE WILL BE ADJUSTED ACCORDINGLY. IF PAYMENT IS ENFORCED VIA A LIEN, ALL ASSOCIATED COST WILL BE THE RESPONSIBILITY OF CITY OF OPA LOCKA. We Propose hereby to fumish material, labor and complete project in accordance with above specifications. PAYMENT DUE NET 30 DAYS FROM RECEIVING INVOICE All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. "A service charge equal to the maximum legal interest allowed by law will be charged on all accounts with balances that are past due, in the event World Petroleum Corporation has to retain an attorney to recover any sum that may be due under this agreement or order, then in such event, the customer shall reimburse World Petroleum Corporation, for all fees incurred together with all costs of litigation and other expenses incurred in connection with said collection." Please be advised that World Petroleum Corporation invoicing will only reflect actual quantities removed and the work performed. All agreements contingent upon strikes, accidents or delays beyond our controL Owner shall carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. , Acceptance of Proposal, The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. SIGNATURE AUTHORIZATION: Date WORLD PETROLEUM Date CTTY OF OPA LOCKA