Loading...
HomeMy Public PortalAbout11-0680 SchenkerCity of Tyuee Island • Community Developu.,ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114. Fax 912.786.9539 ies* INTERNATIONAL CODE COUNCIL' MEMBER Permit No. 1 - Date Requested 1i - ) C4-- 1 9 ner's lane ��? C Yl ' h k -6--. Date Needed 14o 3es Rti, . Subcontractor Gen. Contractor (29 Contact Xrtf r ation 0s k 1+12 —3g33 Project Address 3 L' n 4k 7-e r1 . Scope of Work 5 QS \ ;(J2_.) -Co r --,t'e p1C2 ( Q) Inspector , Date of Inspection .R Inspection --F-1-7,1 °� Pass Fail j Fee Inspection Pass D Fail El Fee Inspection Pass N Fail L__.! Fee inspec Pass D Fail Fee DATE ISSUED: 12 -19 -2011 WORK DESCRIPTION WORK LOCATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL GAS LINE FOR FIREPLACE 3 TENTH TER OWNER NAME PAUL SCHENKER ADDRESS PO BOX 1989 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME GARY HODGES PLUMBING ADDRESS 12 ALTMAN CIRCLE CITY STATE ZIP SAVANNAH GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 50.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 350.00 PERMIT #: 110680 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CAD CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 PLUMBING PERMIT APPLICATION Date � 1/ Location of work (street address) / a 17'› /*/4 / Co-- , //1/3-)1 C Contractor Address of Contractor Telephone number of Contractor Name of Property Owner Ty be_ e Vocq`11 ite Mailing address of Property Owner Telephone number of Property Owner Date work will be ready for inspection, if known LS' Estimated cost of construction S' (9 /06 New Work Replacement Oil %as Permit Number Electric Backflow Preventor Disposal Unit Domestic Water Connection to Main Drain Roof or Area Drainage or Vent Piping Fire Protection Sprinkler System; Number of Heads/Nozzles Grease / Oil Trap Hose Bib Hot Water Heater Icemaker Lawn Sprinkler System Plumbing Fixture Residential House Sewer Connection to Main Sewer Cleanout Sewer Stub Vacuum Breaker Water Meter Water Service Line — New Residence Water Service Line — Replacement "...Voter Softener �+ t/ Other n s'i -a1I Gt CZ S j In 0 �o r ♦: f e o ( a C v