Loading...
HomeMy Public PortalAbout11-0183 KrehDATE ISSUED: 04 -5 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPLACE WINDOWS 5 SIXTH TER GUSTAVE KREH PO BOX 2914 TYBEE ISLAND GA 31328 -2914 GUSTAVE KREH PO BOX 2914 TYBEE ISLAND GA 31328 -2914 P $ 530.00 $11,875.00 PERMIT #: 110183 TOTAL BALANCE DUE: $ 530.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: )0,0'.4,4) P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org d CITY OF TYBEE ISLAND, GEORC1iA APPLICATION FOR BUILDING PERMIT Location: AL `,` NAME ADDRESS PIN # Owner r YYh ., (9.,1(Y►. K its 4)1.041 Try hce r7(f Co-- 09l '7 Architect or Engineer OA Building Contractor . 0f ly't — 14 r (Che all that apply) Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: n Re idential Ingle Family Duplex Multi- Family ❑ Commercial 11 n Footprint Changes ❑ Discovery n Demolition palerfict I Li�i :. I' t • f . or-,s • 6ncu.1 ov Estimated Cost of Construction: $ j Q 6 0 Construction T e L —,431 yp (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: \ 1 t \\I,,�v�c�,,,5 ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of LArgte , Hty r . I understand that I must comply with zoning, flood damage control, building, fire, shore I protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 3 a, D t ( Signature of Applicant: Z , „A"! Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager 0 perrn., Signature Date FEES 101" 3Co Permit Inspections Water Tap Sewer Stub Aid to Const. _ '27 TOTAL 2 CD S�� LEAD -BASED PAINT Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform thes projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the le -saf work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, prop rty o n s must submit an application for firm certification and fee payment to EPA. The Agency has up o 0 ys after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and • Take training to learn how to perform lead-safe wokk p • Learn the lead laws that apply regarding certific do an • Keep records to demonstrate that you and your worker safe work practices on the job. To make recordkeepin developed to help contractors comply with the renovation • Read about how to comply with EPA's rule in the EPA S • Read about how to use lead -safe work practices in E Information for Homeowners Working at Home If you are a homeowner performing renovation, repa However, you have the ultimate responsibility for the and planning to do painting or repairs, please read a Care Providers, and Schools lead hazard informatio jo in rental property ould also: actices. lead -safe wor •ractices beginning have bee wined in lead -saf easi- ou may use t eeping requ' i 'ril 2010. rk • actices and that you followed lead - sample recordkeeping checklist that EPA has ents that took effect April 2010. Com.li. ce Guide to Renovate Right. afe Renovation Repair and Paintin IF YOU'RE NOT -LEAD -SAFE CERTIFIED, _DISTURBING -JUST SIX SQUARE FEET !COULD COST YOU -BIG TIME. ir, or-paint' work in your own home, EPA's RRP rule does not cover your project. safet your family or children in your care. If you are living in a pre -1978 home of EPA's Renovate Right: Important Lead Hazard Information for Families, Child amphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Signature Cl/4/t n te me Harr )r Prind 3- 3)--aoll Date �%) err: 6rec10114. Meets or exceeds C.E.C. Air Infiltration Standards �% WINDOW &DOOR MANUFACTURERS VVD wwwwdma.com ASSOCIATION n /�� ' V t A Hallmark Certified Licensee #407 -H -783 Manufacturer stipulates conformance to the applicable standards Integrity IMPACT Double Hung 1Z3 DP +551 -65 H  LC55 41.5X75.75 Tested Higher Negative Design Pressure:  65PSF Tested to ASTM E 1996 -02, 05 & 06 Missile D, Wind Zone 3 Tested to 101 /1,5.2 /NAFS -02 & AAMAIWDMAICSAI10111.S.21A440 -05 FL 10257.1 02465431 12 A45131 Al product may he coverod by one or more of the following patents: 5115596, 5125442, 7591106 Visit www.marvin.com for pending patents. Do not remove this label priorto inspection and save for future reference. � 2010 Marvin Windows and Doors � Registered trademark of Marvin Windows and Doors. Part #19981465 �%) err: 6rec10114. 5 pi LEGAL NOTICE CITY OF TYBEE ISLAND WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY GIVEN IN ACCORDANCE WITH THE ABOVE CODE THAT ALL PERSONS CEASE, DESIST FROM AND STOP WORK 441 AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, OR FURT USE OF THESE PREMISES KNOWN AS UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR EMOVING OR MUTILATING IT ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE CITY OF TYBEE ISLAND. Ki rj Ii 343q1 PHONE 7f4 • '/' O DATE INSPECTOR