Loading...
HomeMy Public PortalAbout12-0515 City of Tybee - CampgroundDATE ISSUED: 09 -24 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CITY OF TYBEE ISLAND BUILDING PERMIT SIGN AT HWY 80 & POLK ST 5 FORT AVE CITY OF TYBEE - CAMPGROUND TYBEE ISLAND GA 31328 CONTRACTOR NAME DOUG BEAN SIGNS INC ADDRESS 1600 DEAN FOREST RD CITY STATE ZIP SAVANNAH GA 31408 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $9,195.00 PERMIT #: 120515 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org /al-051 . City of Tybee Island, Georgia 912 - 472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: S her- Ave NLIE � reEE 1.64.4,.© 3,8 ❑ Single Family ❑ Duplex ❑ Multi- Family units 2 Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new square feet heated /cooled ❑ Demolition of Structure I� Other 5/4,./Ada o �Vc istiC4 DE <ti,rr,,/< cot( !�/��c./hY Details of Project: 4DD.rl04 So 5/4A/A<E, 1 4 Ode see 7?"e Sci+e.narrL WrZ ID e0 �Y Yoc1L•bcP / �,dAI ../ E'Lt ,c.+ -e- - l o "gE m acne tMi7o rj a & 7o,�C, ( j,y9s•:E re 040 Estimated Cost of Construction: $ cl /95'— enc.-5,44 aterials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: /� On -site restroom facilitie will be provided through �,ve¢s F.n O4i .�a; �.+e4 Construction debris will be disposed by PG,4,,,,..t sn /lemn.as by means of e4 I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted Fo,. ucti.n. Date: $ //z Signature of Applicant: Printed Name /Jofl -, ilems7 04: .414 2". Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Signature Da /- FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL •.7 Name Mailing Address Telephone Owner 'Zveg.A e"43 Ck,yfaeou,yp ! R./ 7A+,RKf el ya 774.8e e CGS ►A Box e7 et iYBFE .s4►,a;44fSax? c 81 Po seK •Z`7tiq teee- .s �, 4'4 31.528 , es:j,JK:91A.1? ..5.518 Cell: i4o�: 9o.a.si. le 7.0 Architect or Engineer Contractor l7ou4 $c,..,.1 6,414.5 /loon t'7E.4j Foeesr- 1ZA0 5A1/4g,,tA146A 3/fO8 Heni Tw 912.9G`/. /900 Cell: ❑ Single Family ❑ Duplex ❑ Multi- Family units 2 Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new square feet heated /cooled ❑ Demolition of Structure I� Other 5/4,./Ada o �Vc istiC4 DE <ti,rr,,/< cot( !�/��c./hY Details of Project: 4DD.rl04 So 5/4A/A<E, 1 4 Ode see 7?"e Sci+e.narrL WrZ ID e0 �Y Yoc1L•bcP / �,dAI ../ E'Lt ,c.+ -e- - l o "gE m acne tMi7o rj a & 7o,�C, ( j,y9s•:E re 040 Estimated Cost of Construction: $ cl /95'— enc.-5,44 aterials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: /� On -site restroom facilitie will be provided through �,ve¢s F.n O4i .�a; �.+e4 Construction debris will be disposed by PG,4,,,,..t sn /lemn.as by means of e4 I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted Fo,. ucti.n. Date: $ //z Signature of Applicant: Printed Name /Jofl -, ilems7 04: .414 2". Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Signature Da /- FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL •.7 ALL ROOF OR REROOF INSTALLATIONS Asphalt shingles shall comply with Section 905 of the International Residential Code shall have self -seal strips or shall be interlocking. Asphalt shingles shall have the type and number of fasteners recommended by the manufacturer. EXCEPTIONS: Asphalt shingles with self -seal strips shall have a minimum of 6 fasteners per shingle on roofs meeting any one of the following conditions: 1. The eave height is 20 feet or greater above grade, or 2. The Use Factor for the building is 1.15, or 3. The Basic Wind Speed is 100 mph or greater. December 2009 Metal Roofing — Materials for metal roofing shall be naturally corrosion resistant or provided with corrosion resistance in accordance with this table: 55% Aluminum -zinc alloy coasted steel ASTM A 792 AZ 50 5% Aluminum Alloy- coated steel ASTM A 875 GF60 Aluminum- coated steel ASTM A 463 T2 65 Galvanized steel ASTM A 653 G -90 Prepainted steel ASTM A 755 (Paint systems shall be applied over steel products with corrosion - resistant coatings complying with ASTM A 792, ASTM A 875, ASTM A 463, or ASTM A 653. For panel systems, two rows of fasteners shall be used along the eaves, hips, and ridges. The first row should be within two to three inches of the edge and the next row three to four inches from the first. Other fastening to be per the IRC, IBC, or Manufacturer's installation instructions. All screws and other fasteners to be corrosion resistant. DAMAGE PREVENTION ORDINANCE The Federal Emergency Management Association (FEMA) mandated adoption of new Flood Insurance Rate Maps (FIRMs) and a new Flood Damage Prevention Ordinance (FDPO) by September 26, 2008. It was required that the FDPO that the City of Tybee Island adopted meet or exceed the minimum standards outlined by FEMA. Some of the more significant changes are outlined below, however, be aware that this outline does not address all of the changes. AE ZONES • SURVEY REQUIREMENT — All new construction /substantial improvement projects are required to submit an as -built certification immediately after the lowest floor or flood - proofing is completed. • FINISHED FLOOR ELEVATION — All new construction /substantial improvement projects are required to be elevated at least one foot above the base flood elevation. The following are included in the requirement and must be elevated: o All heating and air conditioning equipment and components, including ductwork; o All electrical; o All plumbing fixtures; o All other service facilities. • NON - RESIDENTIAL — New construction /substantial improvement for non - residential projects may elect to floodproof the project in lieu of elevation. VE ZONES • SURVEY REQUIREMENT — All new construction /substantial improvement projects are required to submit an as -built certification after placement of the lowest horizontal structural members. • FINISHED FLOOR ELEVATION — All new construction /substantial improvement of existing structures shall be elevated so that the bottom of the lowest supporting horizontal structural member (excluding pilings or columns) is located no lower than one foot above the base flood elevation level. Substantial Improvement means any combination of repair, reconstruction, alteration, or improvement to a structure taking place during a 5 -year period, in which the cumulative cost equals or exceeds 50% of the market value before the start of construction of the improvement. October 2008 IJIIICK Dear • !L41 DATE ! Here's the pr cing inf m ion you requested based on what we cn w about your project at this time. Please respond with any questions. You may accept this proposal by completing the iUY1TNQW form below. Thankyou for this opportunity. We look forward to producing this job for you! PAGE 1 OF / Respectfully Submitted by 4175.---"-. for Doug Bean Signs, Inc. sKfv JF(s1 /O+ES(.S runt /sj'1cirk 4rl w - Doug L n Signs, Inc 1600 Dean Forest Rd. Savannah, GA 31408 912 -964 -1900 f 912-964-2900 dougbeansigns.com aeletuksierom PHONE FAX CELL EMAIL SEE Ann-10Na INFORMATION MACRO 411111 RIVERS END CAMPGROUND & RV PARK rivers end corn pgraund_com • city ofiybee.org /di/tel./Yew/N/94 ffe-ry4i#dek . Estimated production time required PROD A ART/ AL) = VOID i"'S days `` not a 'ptr�I FULL PAYMENT 50% DEPOSIT REQUIRED 13VY IT NO��r • IN ADVANCE READ I FOR ALL JOBS OVER $100. FOR ALL JOBS UNDER$I00. *°*BALANCE DUE UPON COMPLETION ri*ati I accept this proposal, please produce this project for me_ Please call me to discuss details DMake changes fve irdrated and proceed ONO proof necessary Mend inc a proof* Art. setup and/or proofs provided only with bona-tide orders. (Additional time and charges may be required) Charge the ) Deposit (]rota/ PISA (MC AMEX) DISC Exp Depos t waived/ Net 30 On by. SIGN 11E4 irk BALANCE DUE UPON COMPLETION Use my credit card to pay the balance upon completion >" "berg eennstmzn.r Authorized Signature Date Fax to 912 -964 -2900 or send to sales @dougbeansigns.com #77Ze' dMP�°'reRTe NT FINE PRINT This quotation proposal is based an the information, specifications, quantities and depictions presumed here and is subject to charge if additions. variations and/or deletions are made. This proposal is made for spedalty and specifically fabricated products andkr services and axe accepted cannot be canal without charge. and is VOID in 45 days if not accepted Llnless specifically referred to herein, this quotation/proposal does NOT INCLUDE charges for. • UNFORESEEN INSTALLATION (A1C/OR REMOVAL) COMPLICATIONS • UNFORESEEN ADMINISTRATIVE, DESIGN, ART, ENGINEERING, SURVEY AND/OR PROJECT DEVELOPMENT OR DOCUMENTATION • ELECTRICAL CONNECTION(S) TO THE SIGN(S) *ELECTRICAL AND/OR OTHER REPAIRS TO EXISTING COMPONENTS • ELECTRICAL REQUIREMENTS OTHER THAN IIOV SINGLE PHASE • CUSTOM OR PRECISE COLOR SAMPLING AND /OR MATCHING • RUSH REQUIREMENTS.and /or SPECIFIC DEADLINE(S). • ANY OTHER ITEMS OR SERVICES INCIDENTAL TO THIS PROJECT PLEASE NOTE Permission, Permitting, Inspection and related costs are estimates ONLY. Additional charges may appliK Please see explanation attached and/or call us for further details. Dianne Otto From: Woody Hemphill Sent: Friday, September 21, 2012 1:26 PM To: 'dougbean @dougbeansigns.com' Cc: Chris Shook; Diane Schleicher; Dianne Otto Subject: River's End Campground & RV Park signage update Doug, We received word today from DOT that we will not be permitted to install the signage within DOT ROW as proposed during our onsite meeting last week. We would like to proceed with the original plan to install the signage as originally specified. The sign permits have been applied for already within City Hall. See you under the oaks, Woody Hemphill, Mgr. River's End Campground & RV Park PO Box 988 Tybee Island, GA 31328 (800) 786 -1016 whemphill@cityoftybee.org www.riversendcampground.com 1 CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date SMZ. Location of work (street address) Contractor 1VI4s.PDY EL.r?cre tc.. Telephone 3.3. /5 c / New Work — Replacement Address of Contractor 'Po Sox 3 $ 3 7 S,ev,,,.InlA t4 oA 3/479.71 Property Owner CirY op T'yeep Date work will be ready for inspection, if known Estimated cost of construction 1, LI' Telephone ",z. 784, s's/ Permit Permit Number ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may result in �.connection of the electrical service until all violations and deficiencies are corrected. tr/C'Xz- Owner /Contractor ' gnature ' Date itioszAZ 7:e" Owner /Contractor Printed Name • APPROVAL Fee Building Official Date A/C Unit and Heat Pump Attic Ventilation Fan Bell Transmitter – low voltage Border /Outline Lighting Building Saw Exit Lights – life safety Heat Pump Meter Box Motor(s): hp Outlets – 110 volts circuit Parking Lot Lights Pool Lights – grounding Range – commercial Permit Permit Number ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may result in �.connection of the electrical service until all violations and deficiencies are corrected. tr/C'Xz- Owner /Contractor ' gnature ' Date itioszAZ 7:e" Owner /Contractor Printed Name • APPROVAL Fee Building Official Date Range Hood – commercial Service: amps Sign Circuit - wattage Smoke Detector – low voltage Spa or Tub – grounding Special Outlet Swimming Pool – grounding Water Heater Welder – 220 volts circuit Well Pump – grounding X -ray Other Permit Permit Number ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service- entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may result in �.connection of the electrical service until all violations and deficiencies are corrected. tr/C'Xz- Owner /Contractor ' gnature ' Date itioszAZ 7:e" Owner /Contractor Printed Name • APPROVAL Fee Building Official Date PROPOSAL BRADDY ELECTRIC SAVANNAH, GEORGIA 31414 PHONE (912)233 -1561 FAX (912)233 -7872 DATE: April 18, 2012 PROPOSAL SUBMITTED TO: Rivers End Campground P.O. Box 988 Tybee Island, Georgia 31328 Attn: Mr. Chris Shook — Campground Operations Supervisor PHONE (912) FAX (912)786 -4126 WE HEREBY SUBMIT ESTIMATE FOR ELECTRICAL WORK TO BE DONE TO: Item 1 • Build new 400amp Nema 3R 120 /208voIt single phase service on rack • Build rack with stub pole and 4x4 post with 8ft x 2ft treated lumber • Furnish and install new 400amp panel with ten 60amp 2 pole breakers to feed 10 new sites • Pull wire to 10 new sites to feed 50amp /30amp 110/208volt single phase pedestals • Longest site will be approximately 330ft from new service • Conduit will be installed by campground Wire, post, and pe • t tal , • • l ed by pground • Wire will be installed a d connected by Br: dy Electric Price Quoted: $5,985.00 •�At sign on Hwy 80 wire for and install 2 goose neck 500watt quartz fixtures on each side of sign • Lights will be positioned to shine from above sign back towards sign • Furnish 1 new photocell to control lights erg -leta sly) Price Quoted: $1,495.00 At at entr: i • pground run circuit underground from extra pedestal to sign location. Circuit will have to be run under roadway • Wire for and install 2 overhead lights and 1 light below sign • Furnish and install photocell to control lights • Wire for one 4 gang 110volt duplex receptacle with weatherproof cover Price Quoted: $1,785.00 PLEASE NOTE: ALL WORK PERFORMED ON THIS PROJECT MUST BE BETWEEN NORMAL BUSINESS HOURS MONDAY THROUGH FRIDAY. WE PROPOSE TO HEREBY FURNISH MATERIAL AND LABOR. COMPLETE AND IN ACCORDANCE WITH ABOVE SPECIFICATIONS FOR THE SUM OF: 1