Loading...
HomeMy Public PortalAbout2015-108 Resolution Receiving Amended Feasibility Report for 2016 Sioux Drive Turn Lane Improvement ProjectMember Martin introduced the following resolution and moved its adoption: CITY OF MEDINA RESOLUTION NO.2015-108 RESOLUTION RECEIVING THE AMENDED FEASIBILITY REPORT FOR THE 2016 SIOUX DRIVE TURN LANE IMPROVEMENT PROJECT AND ORDERING THE IMPROVEMENT WHEREAS, pursuant to resolution of the city council adopted September 15, 2015, a report has been prepared by the city engineer with reference to the proposed 2016 Sioux Drive Turn Lane Improvement Project, the improvements to Sioux Drive from Westfalen Trail to Trunk Highway 55 by widening portions of the roadway, reconfiguration of existing turn lanes, minor storm sewer improvements, and restriping of the intersection; and WHEREAS, the report was received by the city council on October 20, 2015 and the proposed improvement was determined to be necessary, cost-effective, and feasible as detailed in the report; and WHEREAS, the report has subsequently been amended; and WHEREAS, the amended report provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate the individual assessments for affected parcels; and WHEREAS, on November 17, 2015, the city council called for a public hearing for the improvement; and WHEREAS, ten days' mailed notice and two weeks' published notice for the hearing was given, and the hearing was held on the 15th day of December, 2015, at which all persons desiring to be heard were given an opportunity to be heard thereon; and WHEREAS, the estimated total cost of the improvement is $219,000. NOW, THEREFORE, BE IT RESOLVED, by the city council of the city of Medina, as follows: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed. Resolution No. 2015-108 December 15, 2015 3. WSB and Associates, Inc. is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Dated: December 15, 2015. Bob Mitchell, Mayor Attest: Scott . Johnson, dministrator-Clerk The motion for the adoption of the foregoing resolution was duly seconded by member Anderson and upon vote being taken thereon, the following voted in favor thereof: Anderson, Cousineau, Martin, Mitchell, Pederson And the following voted against same: None Whereupon said resolution was declared duly passed and adopted. Resolution No. 2015-108 2 December 15, 2015