HomeMy Public PortalAbout10-0233 Silver Ave Condo Assoc_1of3DATE ISSUED: 05 -6 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT RENOVATE FOR ACCESSIBILITY 13 SILVER AVE ASSOC SILVER AVE CONDO ASSOC 7640 ABERCORN ST SAVANNAH GA 31406 -2464 BOBBY CHU CONSTRUCTION CO INC 1A 6TH STREET TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 271.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $32,000.00 PERMIT #: 100233 TOTAL BALANCE DUE: $ 271.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 0/6 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT j/ L/a�ir5 f' /CJ� /O- 0133 Location:? 7 ; �Q ✓ � NAME ADDRESS iz-OGV40,6 PoigeeW- TELEPHONE (Check all that apply) Repair Renovation Minor Addition Substantial Addition Other • 11 Details of Project: Li Residential Single Family Duplex Multi- Family Commercial (I Zed / 7 .-` (�ac.e S Footprint Changes Discovery Demolition Estimated Cost of Construction: $ (Enter appropriate number) (4) Masonry (5) Steel & Masonry Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms Bathrooms Lot Area Living space (total sq. ft.) 4/,) # Off - street parking spaces _ Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front 7Q Nr With culvert? Rear /Q With Swale? Sides (L) /Q # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. ---°'-'10 %/ . , /�"'v 7 , i / - ,� �5l��1'/ Owner �C 74 /1% e 40f 1 / ,6-S--------- v`",/- // / Architect /�1'7`�e�� d // 'er /Qg 5..9 -",:..r. 2y7 6 7/7i47,2---/:- ice _5 d or Engineer D_‘`p/1) Building �� =G ZAe)a-vV i`'/ Contractor Ze.- �`% / —/ // f/e' - -W (Check all that apply) Repair Renovation Minor Addition Substantial Addition Other • 11 Details of Project: Li Residential Single Family Duplex Multi- Family Commercial (I Zed / 7 .-` (�ac.e S Footprint Changes Discovery Demolition Estimated Cost of Construction: $ (Enter appropriate number) (4) Masonry (5) Steel & Masonry Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms Bathrooms Lot Area Living space (total sq. ft.) 4/,) # Off - street parking spaces _ Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front 7Q Nr With culvert? Rear /Q With Swale? Sides (L) /Q # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: _ On -site restroom facilities will be provided through ----72-5-") On -site waste and debris containers will be provided by Construction debris will be disposed by p,J �L by means of sa..4, I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Signature of Appli Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signature Date FEES Permit Inspections (, Water Tap Sewer Stub Aid to Const. TOTAL 27 Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned Printed Name Da to Office Use Only: Project Address: Permit Number: ',0 re_ .10-- ,ia:47'e_ i;t)/e t,,-5-/(5- -7/ ieid .,8. ,077:5/;at //&J/e/--/-6- 4 /.7'k // a/e,:s G✓ �f �%' /y /).._ ..7_/z , Gte__ ‘e-)?/ e/-5----47z2S/W -74c_ i'-,cp--4'j- --/goe fe. / -x'°-fre-ee-/--- /0,ze--Z;1/- ---%?( --7474e-- 24-1 4 . ° /1,4A/ '-,0'774c2 ‘://,< 6,61 ///6-5 7/-x-e— 74-\)- /e_ / - e(' rcayt I 1 0121 APPENDIX 1 RETROFIT UST No. Location / Element Noncompliant Feature Remediation 1 _„ Accessible Route to Public ROW from Common Area Entry The brick paver access drive abuts the ground level concrete slab apron. Where they abut, there is an abrupt level change which measures 3/8" to 3/4" +. This slab edge does not comply with the abrupt level change requirement. Re -set brick pavers to provide a compliant level change at the accessible route. 2 ' Grade Level Common Area Entrance Threshold The building entrance (public /common use) doors accessing the elevator lobby have a threshold in excess of 1/2" maximum and is beveled Tess than 1:2 Threshold height is 5/8" - 3/4" as measured. [both doors] Remove and replace to provide a compliant threshold at the accessible entry door. -3 Grade Level Common Area Entrance Change in Level the building entrance (public /common use) doors accessing the elevator lobby have a change in level in all units: 5" - 6" for units C and D; 4 and 1/2" to 5" for units A and B, Provide the required level clear floor maneuvering area and level transition from the exterior to interior lobby at one of the grade level entry doors, i.e. either C and D, or A and B, similar to the Cogdell Plan (12/3/09), which is attached at Appendix 4. [May require zoning approval] 4 Grade Level Common Area Entry Doors Hardware Hardware on both of the elevator lobby doors is not compliant, usable hardware. Remove and replace knob hardware with level hardware on the door and entry that is to be made accessible. 11 aye tG0I Li No. Location / Element Noncompliant Feature Remediation 5 Second Level Accessible Route to Units D + A Change in Level Change in level for second level elevator lobby that serves units A + D is 2 and 1/2" - 3". Raise the elevation deck to provide level transition to elevator lobby. 6 Second Level Elevator Lobby Door to Units D +A Hardware Hardware on the second level elevator lobby door is not compliant, usable hardware. Remove and replace knob hardware with level hardware on the elevator lobby door. Second Level Elevato r Lobby Door to Units D +A Maneuvering Area Clearances on the pull side of the entrance door are Tess than 18 " minimum required. Reverse the swing of the door so hinges occur on the handrail side. Units D + A Primary Entry Door Threshold The primary doors accessing units D and A at the second level have thresholds that are in excess of the 3/4" allowable maximum and are not beveled 1:2. Thresholds are stepped. Threshold heights are 1 and 1/4" to 1 and 1/3" as measured. Remove and replace to provide a compliant threshold at the entry doors to units A and D. Units D + A Primary Entry Door Change in Level The primary door accessing units A and D are at the second level. Change in level for the entrances is2 "to4 ". Raise the elevation of deck to provide a level transition to units A and D. 12 uuuumeru u4 r-Ued 12/21/09 Page 13 of 21 No. Location / Element Noncompliant Feature Remediation 10 Third Level Accessible Route to Units C + B Threshold The primary doors accessing the third level elevator lobbies have thresholds in excess of the 3/4" allowable maximum and are beveled 1:2 Remove and replace to provide a compliant threshold at the elevator lobbies entrance doors. 11. Third Level Accessible Route to Units C + B Change in Level Change in level for third level elevator lobbies that serve units C and B are 2 and 3/8" - 3 and 1 /4 ". Raise the elevation of deck to provide level transition to elevator lobby. 12 Third Level Doors to Units C + B Hardware Hardware on the third level elevator lobbies is not compliant, usable hardware. Remove and replace knob hardware with lever hardware on the elevator lobbies entrance doors. 13 Third Level Doors to Units C + B Maneuvering Area Clearances on the pull side of the entrance door are Tess than 18" allowable minimum. Reverse the swing of the door so that the hinges occur on the handrail side. 14 Units C + B Primary Entry Door Threshold The primary doors accessing units C and B at the third level have thresholds that are in excess of the 3 /4" allowable maximum and are not beveled at 1:2 or less. Thresholds are also stepped. Threshold height is 1 and 1/4" - 1 and 3/4 ". Remove and replace to provide compliant thresholds at entry doors for units C and B. 15 ' Units 0 + B Primary Entry Door Change in Level The primary doors accessing units C and B at the third level have noncompliant changes in level. Change in level measured at 2" to 4 ". Raise elevation of deck to provide level transitions to units 0 and B. 13 IGIZ riui Page 14 of 21 No. Location / Element Noncompliant Feature Remediation 16 Accessible Parking Parking for units C and D is located on the west end. the area measures 11' 4" x 41' 4" long. There is an 8' 0" clear width available, however, there is not a 5' minimum width access aisle available, nor is there a marked out area for access and access aisle. Construction of the Accessible Space and Accessible Aisle on the left front of the property as shown on Tom Olson's Option C (12- 15 -09), attached as Appendix 3 and the construction of the Access Way from said Accessible Space and Aisle to the Landing as shown on Tom Olson's Option C. [May require Tybee Island Planning Commission approval and /or Tybee Island City Council approval] 18 Storage Closet Doors Units A, B, C, D The doors are 2' 6" wide and are not compliant with the requirements for walk -in closets. Remove and replace doors to provide a nominal 32" clear opening for all four doors. 19 r Units A + D Bathroom Doors The bathroom doors are 2' 4" wide and are not compliant because there is less than 32" of clearance. Remove and replace doors to provide a nominal 32" clear opening for both bathroom doors. 20 "( Units A + D Bedroom Doors The bedroom doors are 2' 6" wide and are not compliant because there is less than 32" of clearance. The bedroom doors are 2' 4" wide and are not compliant because there is less than 32" of clearance. 22 Thermostat The thermostat controls are typically at 61" to highest control. this is not compliant with the 48" maximum. Relocate the thermostat to a compliant location no more than 48" AFF to the operable part. 14 Page 15 of 21 No. Location / Element Noncompliant Feature Remediation 23 Reinforceme nt for Grab Bars Bathroom Reinforcement may not exist as required. Grab bars will be install in at least one bathroom in each unit or wall backing as required by the Act. 24 Units B + C Bathroom Doors The bathroom doors are 2' 4" wide and are not compliant because there is Tess than 32" of clearance. Remove and replace doors to provide a nominal 32" dear opening for both bathroom doors. 25 Units B + C Bedroom Doors The bedroom doors are 2' 6" wide and are not compliant because there is less than 32" of clearance. The bedroom doors are 2' 4" wide and are not compliant because there is less than 32" of clearance. 27 Thermostat The thermostat controls are typically at 61" to highest control. this is not compliant with the 48" maximum. Relocate the thermostat to a compliant location no more than 48" AFF to the operable part. 28 Reinforceme nt for Grab Bars Bathroom Reinforcement may not exist as required. Grab bars will be install in at least one bathroom in each unit or wall backing as required by the Act. 15 IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF GEORGIA SAVANNAH DIVISION SAVANNAH — CHATHAM COUNTY FAIR) HOUSING COUNCIL, INC.;) RICHARD STURGESS; and DANIEL) GEHRINGER; ) Plaintiffs, ) v. ) DILLON CHU, INC.; GREGORY) CHU; MICHAEL WILLIAM BAILEY;) ROBERT CHU, d /b /a Bob Chu) Construction; ROBERT CHU;) RANDOLPH CHU; BOBBY CHU) CONSTRUCTION CO., INC.; ) Defendants. ) CASE NO. CV409- O R D E R Plaintiffs filed this action on June 3, 2009, bringing claims under the Fair Housing Act, 42 U.S.C. §§ 3601 -3631, and related state law claims. (Doc. 1.) The Parties' have submitted a proposed Consent Decree (Doc 64) and Joint Motion for Dismissal with Prejudice (Doc. 65). The proposed Consent Decree, which the Parties request the Court approve, resolves all claims brought by Plaintiff Savannah— Chatham County Fair Housing Council ( "SCFHC ") 1 Plaintiffs and Defendants, with the exception of Defendant Bailey, have filed a Motion to Dismiss Michael William Bailey. (Doc. 67.) Defendant Bailey failed to answer Plaintiffs' Complaint. After careful consideration, the Motion is GRANTED and Defendant Bailey is DISMISSED from this case. against Defendants. The Joint Motion for Dismissal resolves Plaintiffs Sturgess's and Gehringer's claims against Defendants. The Consent Decree proposes that the alleged violations of the Fair Housing Act be addressed by Defendants retrofitting the completed construction. Defendants also agree to comply with the Fair Housing Act in the future, to educate its employees on design and construction requirements under the Fair Housing Act, and to provide public notice of their non - discrimination policy. Additionally, Defendants will pay Plaintiff SCFHC $10,800.00 as compensation for costs associated with bringing this litigation, including attorney's fees. In return, all claims asserted by Plaintiff SCFHC will be dismissed with prejudice. Parties to a lawsuit may always settle their dispute. See United States v. Armour & Co., 402 U.S. 673, 681 (1971). But where the parties wish to incorporate their settlement into a judicial decree, courts must give the agreement more careful scrutiny. United States v. City of Miami, 664 F.2d 435, 441 (5th Cir. 1981).2 Specifically, "[d]istrict courts should approve consent decrees so long 2 In Bonner v. City of Prichard, 661 F.2d 1206, 1209 (11th Cir. 1981) (en banc), the Eleventh Circuit adopted as binding precedent all decisions of the former Fifth Circuit handed down prior to October 1, 1981. 2 as they are not unconstitutional, unlawful, unreasonable, or contrary to public policy." Stovall v. City of Cocoa, 117 F.3d 1238, 1240 (11th Cir. 1997). After a careful review of the claims and defenses in this case, the Court APPROVES the proposed Consent Decree. Accordingly, Plaintiff SCFHC and Defendants are bound by the Decree's terms, and all claims asserted by Plaintiff SCFHC are DISMISSED WITH PREJUDICE. In addition, Plaintiff Sturgess, Plaintiff Gehringer, and Defendants' Joint Motion for Dismissal with Prejudice is GRANTED. The Clerk of the Court is DIRECTED to close this case .3 SO ORDERED this A. -day of February, 2010. WILLIAM T. MOORE, JR., CHIEF JUDGE UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF GEORGIA 3 The Court retains jurisdiction to enforce the terms of the Consent Decree. 3 C.HpTHAM 01,114 Li V V APR 3 n. -2014 Bobby Chu Construction Co., Inc. r- p` Grt ATOM DINe SAFETY S RVI HS April 29, 2010 7726 Johnny Mercer Boulevard Savannah, GA 31410 912 -897 -0104 Phone 912 - 898 -0717 Fax Mr. Gregori Anderson Director of Inspections Chatham County Building & Safety Re: #13 Silver Avenue Tybee Island, GA 31328 Greg Chu For Compliance with Savannah - Chatham County Fair Housing Council, Inc. Mr. Anderson, Please find revised plans attached for the above referenced property as requested. I hope these meet your approval. I am sure you are aware that these plans are not in complete compliance with the Fair Housing Act. However, it is what was agreed upon by the attorneys representing both parties and Mr. Wayne Dawson, Executive Director of Savannah- Chatham County Fair Housing Council, Inc. If you need anything further please do not hesitate to call me. Sincerely, Tom Waters Cell 912 -656 -8103 Email: twaters50 @,comcast.net PROPOSED 5 x 5' CONCRETE LANDING WITH 3' WIDE x 5' LONG ADA APPROVED RAMP AT A MAXIMUM SLOPE OF 1:12 WITH METAL RAILING EXISTING PERMEABLE PAVERS RAMP DOWN"- T ' ' 46. " ilk ... 1 C. ■ ' ■ ° ****N4 VIIIMIIIII 1 , -��►, 01p %St ,° ������rkktti 4 ,�����, ` �,OWe `, PROPOSED 8' x 18' PARKING SPACE WITH 5' x ,8' ACCESS AISLE CONSTRUCTED OF PERMEABLE PAVERS AND WITH A CONCRETE HEADER STRIP P �' ' 5, /// / / �� 1 of t 'r° ° ` ` /�� /t/ /. // /////'/t * No. e37 2 PROFESSIONAL — 'a o) _, 4 e4, I N Ec,R- PROPOSED LANDING, RAMP AND PARKING SPACE BOSWELL DESIGN SERVICES, INC. 103 NASSAU DRIVE SAVANNAH, GEORGIA 31410 (912) 897 -6932 LAH80SCBELLSOUTH.NET NOT TO SCALE ,January 7, 2010 ACCESSIBLE It A \MP 13 SDLVER AVENUE, TYBEE llSLAN©, GA EDGE OF BRICK PAVERS EXISTING BRICK PAVERS PLAN X 3` -0" Ct D 0 N lY 10 Iw ICI 0 Iw I 0 w d 0 0 0 0 0 -J CONC LANDING SLOPE 1 :50 li 5' -0" COVERED PARKING 4 INFILL EXISTING WINDOW ELEVATOR LOBBY NEW DOOR INFILL EXISTING OPENING iw 0 0 w 0 1%// ////U/. I SECTOON 1I 11 1I � II 1I I1 RELOCATE EXISTING DOOR COVERED PARKING METAL RAILING a,vx airy ar 44' ft� Tw 4 W 410` it 114' Arlik 41.,. i" 1 *• Rr.I II. I- Iiiiiimmii ti • lit it it 'till III IIIIII1IIIIII1 -IIIIIIIIIIIIIIIII, IIIIII)IIII1IIIINLIIIIII 1111111 1, 11 1111111111 111111111111111111, 111111111111111111111H I I IIII1, ev 1/0°401' -0'