HomeMy Public PortalAboutBUTLER AV_1415.pdfCity of Tybee Island Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
Permit No. f Z2-0 (1 L-3.17 Date Requested
Owner's Name 6/zi Date Needed
Gen. Contractor ()'rte �,._i; }, Subcontractor
Contact Information
Project Address /4/<,
Scope of Work , ..>L1 , •.. 2 4,';4-/-",
Inspector
Inspection
aor
f,
Marra
INTERNATIONAL
CODE COUNCIL
MEMBER
Date of Inspection
Pass
Fail Fee
e--i-
I
Inspection Pass ❑ Fail 0 Fee
Inspection Pass Fail ❑ Fee
Inspection Pass n Fail ■j Fee
DATE ISSUED: 07 -31 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADD EXTERIOR LIGHTS
1415 BUTLER
CAPTAINS WATCH, LLC
PO BOX 6143
GREENVILLE SC 29606 -6143
864- 241 -8134
O'CONNOR ELECTRIC CO
1431 DALE DR
SAVANNAH GA 31406
P
$ 50.00
PIN #4- 0007 -17 -026
$ 800.00
PERMIT #: 130482
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.citvoftybee.org
/ 3 - v LIB, -6'd7-17- v,6,
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. Box 2749, Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT
Date 3 t.,1 3 1 �QI
Location of work (street address) I l ��
Contractor 0(0y,
Address of Contractor / LJ
Property Owner
New Work
Replacement
aA/DrJ
Telephone
Date work will be ready for inspection, if knowp
Estimated cost of construction C)D
Telephone
.D c1 Z `1
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service- entrance
conductors. NEC230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Cer ' : of Occu s ancy must be issued by the City of Tybee Island prior to any occupancy.
4. The •caner• •on actor are hereby held responsible for any violations of this policy. A violation of this
p• icy may`u i isconnection of the electrical service until all violations and deficiencies are corrected.
')(.? )3
Owner Contractor Signature Date
ODD
Owner /Contractor Printed Name
•
APPROVAL Fee
Date
A/C Unit and Heat Pump
Attic Ventilation Fan
Bell Transmitter — low voltage
Border /Outline Lighting
Building Saw
Exit Lights — life safety
Heat Pump
Meter Box
Motor(s): hp
Outlets — 110 volts circuit
Parking Lot Lights
Pool Lights — grounding
Range — commercial
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service- entrance
conductors. NEC230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Cer ' : of Occu s ancy must be issued by the City of Tybee Island prior to any occupancy.
4. The •caner• •on actor are hereby held responsible for any violations of this policy. A violation of this
p• icy may`u i isconnection of the electrical service until all violations and deficiencies are corrected.
')(.? )3
Owner Contractor Signature Date
ODD
Owner /Contractor Printed Name
•
APPROVAL Fee
Date
Range Hood — commercial
Service: amps
Sign Circuit - wattage
Smoke Detector — low voltage
Spa or Tub — grounding
Special Outlet
Swimming Pool — grounding
Water Heater
Welder — 220 volts circuit
Well Pump — grounding
X -ray
Other
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service- entrance
conductors. NEC230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Cer ' : of Occu s ancy must be issued by the City of Tybee Island prior to any occupancy.
4. The •caner• •on actor are hereby held responsible for any violations of this policy. A violation of this
p• icy may`u i isconnection of the electrical service until all violations and deficiencies are corrected.
')(.? )3
Owner Contractor Signature Date
ODD
Owner /Contractor Printed Name
•
APPROVAL Fee
Date