HomeMy Public PortalAbout11-0139 SheffieldCity of Tybee Island • Planning & Zoning Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472.5032 • Fax 912.786.9539
Permit No. //— )f
Vii`
Ent%
INTERNATIONAL
CODE COUNCIL
MEMBER
Date Requested 42-,/
Owner's Name Date Needed
Gen. Contractor Subcontractor
Contact Information
Project Address /vC2
Scope of Work
Inspector
Inspection %
Date of Inspection)
Pass
Fail ❑ Fee
Inspection .�R /- Pass Fail ❑ Fee
L.
- 00' 0,J_ "-lam < ,
C
Inspection Pass Fail El Fee
Inspection Pass ❑ Fail ❑ Fee
C a N C . Soar A L L E Y No. 3
RA1.4.P. .. _. .
1•Z•5• , 6n450-
®✓ 4'i.nl' o • 5 774- 94- 5'1" E-•- 2'34..0'
a/ 6o,o5' c. Pvt. S.
-(:./ ■.'1‘ , :IT)-(%142 i
� J �. / tiN ry L I °a_'�v�a •
.' 4 / / � i h . --r:,,---4.
N. l 1 . 0 N�I I ; t. .L— co W . U 1
N f M
Lrr 1.1N4)",
4
g6 _
OWE •$roar calve• 15LocK
•- -4:4.64' 46.` -5•
;ITC 3) :57ww. ••••1477_%5•-) "
.-I
477 ° - 12'• 55.•14
t M.F.
ttJ
j
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OP LOT 12 Se 'THE NORTHEZ,1.1 HALF 0p LOT 11, VIAR -D
L 'HO, 0, Yy5 EE ISLAND.
FOR JEFF D1c1<EY , JTZ.I.
DATE:._.JA)4.UQR'( 7, X985
SCALE _ -1 '' - —5_0: _ _ _
o'' 5 0 ` 1 sza...` EO.C. FIELD
s
-,ERROR/POINT
ADJ. METHOD
BARRETT LAND SURVEYING, INC.
E.O.C. P ' 1' �
+ T
�o° TRANNSISI T
100' TAPE
.SAVANNAH, GEORGIA E.D.M.
2.
NoTE. PLAT g.EvISED ro SNo<) .vE• TIE
LINE D-ist GtZEEK 51DE. JUL'' 7, i'188
PLAT JzbvrsaD 7-o SNOW cKouND
ELEVATIQN.5.(_GtZ.E .../.1R/...13/
IC-19 L68 ZI6
DATE ISSUED: 03 -15 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
I+
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF & SHED ROOF ON OUTBLDG
1601 CHATHAM
BETH SHEFFIELD
PO BOX 2567
TYBEE ISLAND GA 31328 -2567
BETH SHEFFIELD
PO BOX 2567
TYBEE ISLAND GA 31328 -2567
P
$ 72.00
$2,365.00
PERMIT #: 110139
TOTAL BALANCE DUE: $ 72.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location:
NAME
ADDRESS
PIN #
TELEPHONE
Owner
i zkk, SLeS-itL -
1 (o i3 t. -Lbw f\., , -1
q►1 -nt- tc)10
Architect
Engineer
46--
/a6, in-Z.
Building
Contractor
S Q 1
(Check all that apply)
Repair
Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
Details of Project: a' ICS 0 y s-t ( a)tA,; \c1 ,. v e ed s
Estimated Cost of Construction: $
ons ruc •n ype
(1) Woos Frame
(2) Wood & Masonry
(3) Brick eneer
Proposed se:
Remarks:
❑ Footprint Changes
n Discovery
n Demolition
(v44:)
lt% itt P-00 P
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
t`5) Steel & Masonry
ATTACH A COPY OF /THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following in ,'rmation/based on the construction drawings and site plan:
# Units / # Bedrooms # Bathrooms
Lot Area / Living space (total sq. ft.)
# Off - street par n• spaces
Trees located : list :4 on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: ront \ Rear Sides (L) (R)
# Stori s Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by 0 u.?.�'�
ti f l�
by means of i-tpv u, t ; :vs o g-- .
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 'S l 11 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Signature
Date
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
FEES
f S
TOTAL 7 2
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented
by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information
pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools.
Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation
disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by
child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair
and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee
payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or
disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and
planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care
Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -424-
LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child-
care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be
used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices.
To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The
Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation,
Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course
you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to
become a certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
IF YOU'RE NOT
.,LEAD-SAFE CERTIFIED,
.DISTURBING
-JUST SIX
SQUARE FEET
:COULD COST YOU
-BIG TIME.
Signature Date
Printed Name
DEFT. OF
MTIJ0.41.
REINA GU
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
proj ect.
€)-Y4fi
Undersign
Printed Name
Date
`3)tt-iItl
Office Use Only:
Project Address:
Permit Number:
gccat=
0.; Th
(js
a THE C>15TER, HOUSE. - 'PROPOSED CMINRCTE-S
si-towER_ c24:01/-i
wASit
gm-S.
to'
P-E4sLovA-TED cal-rn LeJE e.ccf"
2_4shCAn Aporovect !)et of clans Must
Benign on scab Site at Ail Times"
46, _
6/ 426,4s610
Cow rit-3 SUPPORT
FOE. 4549-rt
R.E.-Qu‘ke
r
CV.% 471, Co41.0 F p,t.
t>c Nu>
cE
r-AbER-, DECK
NB LL 1)1
Fta`igL'Iti FOR CeiA5E f;;OT.:-,11tolot
very e!,,ort o lidntliv
Cde V'';n QverGgit by the
review '2 i authwity
to viointe, cerL“., aside
any applicebio ordinanc,as,The
review rArld rm shod not 'Oa construed
t-23MR1±14111\Irk 1
5a,V.inied By_
ALL CONSTRUCTION MUST COMPLY WITH THE
SSTDjo,,q AND THE IRC ONE AND TWO
FAMILY DWELLING CODE zuEDITION
AND STATE OF GEORGIA AMENDMENTS
EN' ELEvAnom
F.ND WALL
CABLE EID WALLS SHALL b!F
BUILT IN ACCORDANCE WITH
SST) 10-09 CT. 205.2.2,
PC. ?05J AM :1 307.3.1
Hkirricarie Straps
flequireg': cr) each r0r
5" 1,c49.
&■,(bm,t1,1
kr)
13T)S--T:t
3)4%43'
3c)uraJ
Foo4e r
INTERIOR PE
ht4, rthek FMAUIRENIENTS 26.144ezt
WIMUNI FOtAlN61 36 INCHES BY 36 INCHES
DE BY ;'0 INCHES THICK,
E Ji OM OF FuOTING ,AUST BE A
316 INCHn BELOW 09A0e,
03/12/2011 22:33 9043588285
To Whom It May Concern:
MILLENNIUM METALS
Millennium Metals Inc.
1 0200 Eastport .Road
•irckrontilic, FL 32218
Phcme (904) 358 ,.83c 6 Fax (904) 358•..8285
PAGE 01/01
All raw material used by Millennium Metals will meet or exceed the ASTM that is
required by Florida building code established by table 1507.5.3 and 1508.4.3 as
per the following chart:
Table 1507.5.3 11508,4.3
ROOFING COVERING TYPE
Galvanized Steel
Pre - Painted Steel
Aluminum Zinc Alloy Coated Steel
Painted Aluminum Zinc Alloy
Copper
Aluminum
MINIMUM APPLICATION RATE
/ASTM A653 G90 zinc coated
STM A755
ASTM A792
ASTM A792
16 oz per square foot
ASTM B209
If we can be of any further assistance to you please do not hesitate to call me at
877 358 7663.
Sincerely,
Tonya Cogan
Millennium Metals, Inc,
CONC. avAT
R A A•S.P. .. -. .
I•R.S .
4TK 5ET
1K'- 41' 01' a 5 77 . 4yygg4: 5�" —•- 234.41'
0/ 6o,o5M� /+�C•M.S.
Nr7ei 462
..J�a (jI0 4 II 4't CL-
_ 10 0.I a ~ - -_
I
i
ALLEY 1.10, 3
I2
C.M.F.
•
%to
lfl
irdj •
4 ou
• c,.T 1.1.4*)!
N
!n
ALZZ•31 =57 wk, .-1,17'0 5'•19" k/
‘0,a
141.3''+- N77 °- 12'•55" W
C44.F.
STATE OF GEORGIA
CHATHAM COUNTY
PLAT 0 LOT 12 2/ YH E NORTH EP_ HALF 0P LOT 111 141,412-D
'1.10 0,, TYbEE ISLAND.
FOR: JEFF D1C14EY
DATE....JAJ-I.UARY ?, 1935
SCALD
a.1 ' I QC._.
BAFIRETT LAND SURVEYING, INC.
SAVANNAH, GEORGIA'
E.O.C. FIELD
-' ERROR/POINT
ADJ. METHOD
E.O.C. PLAT
20" TRANSIT
100' TAPE
E.D.M.
more: PLAT ILEv15ED Tb 5NoJ1 .VEW TIE
1-1 N E 0'N " G R'): E K 51 D E. JULY 7, 1188
FLAT. 26v.psaD Do SNOW G2'i'
E.LEVATl171J. S. (c; 12....E ..,UJittE .8 /.1.3...T.
'/ I )-1;-,
O
2
O
0
n
H
Z
n
1E19 L68 ZT6
1
gOnvlFEB0 7 ail
GEORGIA
COASTAL RESOURCES DIVISION
MARK WILLIAMS A.G. `SPUD' WOODWARD
COMMISSIONER DIRECTOR
Mary E. (Beth) Sheffield
PO Box 2567
Tybee Island, Georgia 31328
RE: Letter of Acknowledgment, Mary E. Beth Sheffield, 1601 Chatham Avenue, City of
Tybee Island, Chatham County, Georgia
Dear Ms. Sheffield:
This Letter of Acknowledgment (LOA) is in response to your recent request to renovate and add
a covered deck to an existing structure to provide shelter for guests during your upcoming
wedding. The ceremony and reception is to take place on your property at 1601 Chatham
Avenue, Tybee Island, Georgia on April 16, 2011.
The existing concrete block "oyster house" was built prior to 1979 and is therefore not regulated
under the Shore Protection Act. Therefore the proposed renovation of the interior and
replacement of the existing roof does not require authorization from the Department. Your
proposal also includes the addition of a 10' x 25' irregular shaped covered deck to the north side
of the oyster house that will cantilever over a concrete slab and existing mowed lawn. All work
is proposed landward of the Shore Protection Line as marked January 21, 2011 and therefore does
not require a Shore Protection Act Permit.
The Department acknowledges the renovation of the oyster house as well as the construction of
the covered deck as depicted in the attached drawings and description. No construction is
authorized seaward of the Shore Protection Act Jurisdiction Line. Any construction seaward of
the Shore Protection Act Line requires a Shore Protection Act Permit.
Public access must be maintained along the beach during the event. No dune vegetation is to be
disturbed during construction. Any incidental impacts to the dunes or vegetation must be restored
to pre - project vegetated and topographic conditions, any backfilling must be beach quality and
obtained from an upland source and not from the beach. No heavy equipment or vehicles are
allowed on the beach in connection with this project. All construction must comply with
Department of Natural Resources Sea Turtle Guidelines.
ONE CONSERVATION WAY 1 BRUNSWICK, GEORGIA 31520 -8686
912.264.7218 I FAX 912.262.3143 I WWW.COASTALGADNR.ORG
Sheffield LQA
Roof on Oyster House
Page 2 of 2
This Letter of Acknowledgment is not meant to exempt the above referenced activity from future
environmental laws. This project must comply with all other Federal, State, and local statutes,
ordinances and regulations.
If you have any questions or concerns about this project feel free to contact Ann Thran at 912-
617 -6310 or by e -mail at ann.thran @gadnr.org.
Ann Thran
Coastal Permit Coordinator
Ecological Services Section
enclosures: Project Drawings & Description
cc: Diane Otto, Planning and Zoning
City of Tybee Island
, THE (>13TER., H005E, ? ROPOS CAN-L(45
R-E.N.CDVAlTh CA4,17-11.-E,J2
Rre.10\fkral.--4P-
11PciR Rt2CC
\•••1 a\
c_AN-r\ Lest eg.
o'
n
,, /
1
1-',;---
'
■-_,-- 11'
Ei FVA-1-1 O!4
"Pt_Act,1
NB ALL '0111,ENAS■c)N-V$ \ S A 1)V-P41,31, P.,. CT
UE5 SkAO\NINI
RECEIVED
JAN 1 9 2011
GA DNR / HMP
(-6 r
O 0 v-k
5-:
CcLurr- SUPPORT
Fag CAN-rtLE.vER
tF IZEL-Q u FIZZ
-TIMEX-P.- DECK
0
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OF LOT 12 `("HE 1.1012- THE17.1\1
WO. TYf EE 1SLA D .
CONC, SoAT
RAMP
1.R.5 • 51 K 5Er
- -lq''
is 4-1,91' 5 77'
0 1 4N4 ,'7� L i lie
fj _ U
ALLEY
4' v
o N
�a• V1
4 �1
0,
N ,
E —*-
C. M. 5.
WO, tiI
2 34 -.GI'
1 IN
IL!
At iI
1� f
CO M. BLOCK
QY4TBR N9E
LPT LINrz'a `
1 �
C.M.F.
DIJE STORY ooNc• BLOCK
+Wt. lr _.44.69/ 46,95'
X77 •31:57lVk.f 1.47i105'•/y"J
C
c,*
.
141,39..2- N71°- 12', 55" k1
c. M.F.
RECEIVED
j ;4 11 9
GA EMIR /HMP
FOR: JEFF D)C.J<EY J iz.,
DATE: JA4! UAR.Y 19$5
SCALE: 1" D
0
5a'
I0oi
BARRETT LAND SURVEYING, INC.
SAVANNAH, GEORGIA
E.O.C. FIELD
- cERRORIPOINT
ADJ. METHOD
E.O.C. PLAT I/ I pr-,
20" TRANSIT
100' TAPE
E.D.M.
HAL P OF LOTH, ITVA I.D
NarE; FLAT gEV15ED TD SHow NEW TIE
Llif E ON GIZPEK 51DE. JUL1' 7, i'j88
PLAT- R &lli5En ro 5NoW GRWuND
ELEVATItJ'l5 C(Gf. Et) JULIE 8/ 119-57
v
Shore Protection Act Permit Application
O.C.G.A. 12-5-230
Date: —
Mailing Address:
C.) fk(-1I-
ty(' I (-/\
Project Location:
I (," .k Q.,_L A A
Ti(),,, 1 IN 4k)
Telephone: 14 - l 1 4 -1 L (A Fax:
- ;
Name, address, and title of authorized agent for application coordination (if desired):
`S-
^-'
L.;
Names and addresses of adjoining
(I A k A.)
p, <
44a.
A A
Telephone: Li
Fax:
property owners (attach additional sheets as needed):
Yb-
PO i ttl
Co (se, s
cr.'t `1,1,4 I i
,• I ,t, • ' 1 7 -7 TL ii.../tIr:)=-4 fc ti ;
Describe the proposed activity (attach additional sheets as needed):
A -k--H\ -e (4
RECEIVED
AN 1 9 2011
GADNRIHMP
Statement: 1 have made inquiry to the appropriate authorities that the proposed project is
not over landfill or hazardous waste site and that the site is otherwise suitable for the
proposed project.
Signature of Applicant (not agent):
N.. IAN \ ••■•\
AC-
Io
r LI
-"`,1
1601 Chatham Avenue - Oyster House
Our proposal concerns the renovation of an existing 25ft by 18ft Oyster House built circa
1930 and comprising concrete block walls and concrete floor. Internally it is divided into
a main area (14ft by 25ft), a shower room (11.3ft by 4ft) and a separate washroom with
toilet (4ft x 4.5ft). The structure has water and electricity supply. A wood / coal burning
stove and chimney provides heating. It currently has a shingled roof, which is seriously in
need of repair. (Pictures attached)
The structure is located on the property approximately 40 feet away from the high water
mark. It is bordered by a maintained lawn and is landward of any dunes.
The proposal, in the first instance, includes the construction of a roof and the renovation
of the internal plumbing and electrical and solid fuel heating systems.
The immediate justification of the work is to provide bathroom and sheltering capability
for the wedding of Ms Beth Sheffield, which is planned to take place on the lawn area
adjacent to the structure on 04/16/11. With regard to the sheltering aspect (required in
case of inclement weather) we would like to extend the roof to provide additional space
in the form of an open porch area as shown in the attached plan. Apart from this external
porch all renovation work will take place within the original footprint of the structure.
RECEIVED
JAN 19 2011
GA DNR / HMP
scrap • •'►+d S
koopi • *AL 474.fteNi, 4,440t
bLJ.t10M 'win* 440%10 Ea
avpsi, ?L G 2
w1`ad ?z< 1
Q L s‘t ce ��`1,� » \O,�
rv•itii"ks 3 `mgeW
"An JAMS