Loading...
HomeMy Public PortalAbout11-0028 Zapp09/01/2011 10:37 9122321736 Y-tort- Ee 1 L t.\ L? f~ 0ts4 c..• C- t, SAV HISTORIC HIDEAWY I PAGE 01 tstu ��.� c, � R- og. b• \ b•�u, 14 1 , ,ol o , t� s s o-t• 41-e pr'044- 08/01/2011 10:37 9122321736 PROPERTY ADDRESS SAV HISTORIC HIDEAWY ESTIMATED COST OF RECONSTRUCTION / IMPROVEMENT I r!J.'' ("' PAGE 02 Total Square Footage of the Structure ITEM DEMOLITION & REMOVAL FOUNDATION, REPAIR & ADDITION slab canvential pier CARPENTRY MATERIAL (ROUGH) floor ceiling last wall stud CARPENTRY, LABOR (ROUGH) ROOFING INSULATION EXTERIOR FINISH CO l Siding Vinyl siding stucco brick other DOOR WINDOW SHUTTER LUMBER FINISH base mold shoe mold (hair rail other CARPENTER, LABOR, FINISH paneling/tseadboartl HARDWARE (FINISH) �'` "Mi1t�:��;: »',• HARDWARE (ROUGH) CABINETS (BWLT.IN) base wall cc.: i FLOOR COVERING tile " ; ►.• Y ►: vinyl cater et Good Other WALL PREPARATION sheetrork paneling +1,E')'',> '" : r .{ rile other PLUMBING (ROUGH)' does riot Include Sprmklpr system PLUMBING FIXTURES shower tub toilet vanity ELECTRICAL (SERVICE /WIRING) •• •' does not include alarm system QUANTITY dimensions ay6' JET' jv sf COST (LABOR t MATERIALS) St 090 sf _ 'f st Si SE sf st sf to ea ea If ,/_ 547 If if U50 It st If It sY sY sy Sy $f st r1l:F� if e.a ea ea ea �r- 500 Ji ODD Li InTa tic OFFICIAL USE 08/01/2011 10:37 9122321736 CABINETS (BUILT -IN) base wall �! t1 {4,j ,�.. r FLOOR COVERING tile • • • e,`;;• vinyl carpet ood) SAV HISTORIC HIDEAWY PAGE 03 If N SY. CJ 1 s�ql —j 0f Off ice Sy WALL PREPARATION Sheetrack Paneling I6 : ., tilt other PLUMBING !ROUGH) ' does not include sprinkler system *PI sf ! +i t? sf PLUMBING FIXTURES shower ea ea ea tub toilet vanity ea _ ELECTRICAL (SERVICE /WIRING) " ' S does not include alarm System ELECTRICALFIxTURES outlets lights other HvAC (UNIT & DUCT WORK INSTALLED) does not include commercial hood system WASHER /DRYER INSTAL/ ATION PAINT OR SPECIAL COATINGS mienoe exterior OVERHEAD & PROFIT TOTAL CONTRACTOR 117 erk, Q 'ILL � o {. pa, ea ea r' cp ea -fel dip a5 btr4 sf OrI'1' eo sr Mks Ql Pg4S - CONTRACTOR ADDRESS l CONTRACTORS SIGNATURE PHONE t *— 1%, ui 12 DATE , ! L I 2010 Chatham County Board of Assessors Property Record Card Page 1 of 1 Requested By: READONLY 6/28/2010 4 -0004 -14 -004 122 LEWIS AVE TYBEE ISLAND APPRAISER avmarcan LAST INSP 05/22/2007 APPR ZONE 000008 LOT 61 PALM TERRACE SAVANNAH BEA CH POWELL DRUSILLA H & WILLIAM S' 122 LEWIS AVE TYBEE ISLAND, GA 31328 CAMA ASMT 377,600 350,500 LAND 2 45,400 41,000 BLDG 1 1,500 0 OBXF 2 424,500 391,500 MORATOR SALES BOOK / PAGE INS V1 QU RSN PRICE _CODES PROPERTY USE 0006 Residential UTA 0004 Tybee Island NBHD 020222.00 T222 Tybee Horse Pen EXEMPTIONS L1 L8 L9 51 3/1/1996 178N 0031 NA I U U5 - GRANTOR POWELL WILLIAM 5, GRANTEE POWELL DRUSILLA H 8 WILLI, 10/1/1978 I Q QO 23,638 PERMITS TYPE DATE AMOUNT'. HISTORY LAND IMPR TOTAL 2010 350,500 41,000 391,500 MAV 2009 350,500 41,000 391,500 Over 2008 539,500 41,000 580,500 Cama 2007 452,500 33,500 486,000 Cama 2006 371,500 33,500 405,000 Cama COMMENTS 3/10/2006 TY06 HS10S ENTNJV 3 -10 -06 1/22/2004 ' TY04 SURVS NOTES BUILDING SECTION 84827 -1 CONSTRUCTION TYPE RCN / AYB EYE DEP TYPE PHYS SOON FUND OSSVf% TOTALDEP% RC LO U.FAOTOR MKT VAL Residential 61,612 1954 ,1985 MS 33.00 0.00 0.00 0.00 33.00 41,280 1.10 45,400 9 Soli 6 6 ' • 9 RsS. WP d W�al�ly p -- 30• -- (J // ' 34' SECTION TYPE 1 - Main AREA 1,008 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 1 - One Story 100.00% QUALITY 2.00 CONDITION 3.00 #UNITS 0 # OF BEDS / BATHS 3 / 1.00 - * 4 y COMPONENTS UNITS % QuAL R1 108 Frame, Siding, Wood - 100.00 R2 208 Composition Shingle - 100.00 R3 309 Forced Air Furnace - 100.00 R4 402 Automatic Floor Cover Allowanc - - R6 601 Plumbing Fixtures ( #) 5.00 - R6 602 Plumbing Rough -ins ( #) 1.00 - R6 621 Slab on Grade (% or SF) - 100.00 R6 641 Single 1 -Story Fireplace ( #) 1.00 - 6 ' 6 • Solid W O� 22 ' 24 ■ 10© Base Li Area ving 1008 ' 24' 8j# 26' 3/22/04 NO ACCESS TO REAR EXTRA FEATURES 113# BLDG # SYSTEM DEED DIM I DIM 2 UNITS OL UNIT PRICE RCN AYB EY8 DT ECON FUNC SP SP% RCNLD MKT VALUE 137361 84827 Solid Wall /Slab FR 6 9 54.00 F 30.13 1,627 1980 1980 5R 911 900 137362 84827 Solid Wall /Slab FR 4 6 24.00 F 44.96 1,079 1980 1980 5R 604 600 LAND 1D# USE MSC FRONT DEPTH UNITS /TYPE PRICE ZONING SIZE LOIN TOPO OTHER ADJI ADJ2 ADJ3 ADJ4 MKT VALUE 109083 MARSH VIEW 0 0 4,500.000 SF 62.00 R1B 1.00 V 30 253,900 109084 MARSH VIEW 0 0 5,700.000 SF 62.00 R1B 1.00 SZ -50 123,700 DATE ISSUED: 01 -21 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT DISCOVERY / TEAROUT ONLY 122 LEWIS AVE KENNN ZAPP 2 I O J• SAVANNAH GA 31401 912 -231 -2075 KENN ZAPP SAVANNAH GA 31401 P $ 350.00 $ 750.00 PERMIT #: 110028 TOTAL BALANCE DUE: $ 350.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org r —002. Location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT NAME ADDRESS PIN # TELEPHONE Owner Doe . tenriJ Z 21 8 wit Lt. L4/4 ii q1 A - Architect or Engineer Building Contractor (Check all that apply) ❑ Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: /4 Estimated Cost of Construction: $ ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi- Family ❑ Commercial 75-0 f print Changes Discovery Demolition Ei Construction Type (Enter appropriate number) e(-1 -)Wood Frame ) (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms Living space (total sq. ft.) With culvert? Rear # Bathrooms With swale? Sides (L) (R) # Stories ( Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 6 During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by 4, s rt rt a-„/ by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: / r 2 /- /7 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) '5% - ° NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES � Permit S Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http://www,epa.ciov/lead/Dubs/renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre - renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -424- LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child- care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Re.d about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. IF YOU'RE NOT -LEAD-SAFE CERTIFIED, .DISTURBING JUST SIX- SQUARE FEET :COULD COST YOU }BIG TIME. /-2/- // Signature Date Printed Name Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned -cc:ff 010 Adi Printed Name 2/--// Date Office Use Only: Project Address: Permit Number: LEGAL NOTICE PERMIT ITY OFT : EE ISLAND WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY GIVEN IN ACCORDANCE WITH THE ABOVE CODE THAT ALL PERSONS CEASE, DESIST FROM AND STOP WORK AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, OR FURTHER U OF THESE PREMISES KNOWN AS 172 6 UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR REMOVING OR MUTILATING IT ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE ♦ CITY OF TYBEE ISLAND.