Loading...
HomeMy Public PortalAbout11-0043 Zapp///-7-A-7.5 City of 7y-ee Island • Community Develop n t Dept. Z19 Inspection Report 403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 Fax 912.786.9539 Permit No. Owner's Name Gen. Contractor Contact Information Project Address i 1 L .0i3 is ik INTERNATIONAL CODE COUNCIL' MEMBER Date Requested f f ' Date Needed !/ Subcontractor Scope of Work 7 t_) - X317-_-01.) 4/-0 C.-r)e-, (,) ,, Jr4 Inspector au6 Date of Inspection 11 HI I ;; - Pass ' El Fee 5 r� z... F ( Cc. C.. - \ F- P l -. t( - 00 VS Inspection Pass Fail ❑ Fee Inspection Pass U Fail ❑ Fee Inspection Pass ❑ Fail Fee City of dee Island • Community Develop-,ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. ) I - a ciLi, Date equested Owner's Name Gen. Contractor /41C-, (---(JA).-4-. Subcontractor Contact Information Project Address i --Z-7-. LTENOLS Scope of Work 00-774...1—) . N.) -1..) Inspector "1/,, () -.X Date of Inspection 8 0 f 14 Inspection 04 i-4 1----, f\)-n- ( -- Pass 0 Fail 0 Fee C.) 7 ' - Date Heeded 16>.. • 1:11 k. M11111111111, INTERNATIONAL CODE COUNCIL MEMBER „0`19 - A 1-7-z 3 0 Ls_ yr, -1-7 t)72,35/144- ..„ Jr0,--47 t 6)7-c.k. Inspection Pass ID Fail Fee Inspection Pass El Fail Fee Inspection Pass II Fail D Fee itletk Nom* •11.11.16- INTERNATIONAL CODE COUNCIL' Permit No. City of bee Island • Community Develo, lent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Date Requested . ; 1 ,_- ) Owner's Name 7_, r 0 Date Needed 14 - 1 3 I Gen. Contractor C (1 c) (-IS 4K 1 Subcontractor (.1)7 Contact Information L"-'77- .3 4,). fTh PrOject Address I -2 2_ I, e) ', Scope of Work . ri(QC. — rke LAD Ot I (\ ,,,-\ cl 1 r- 4 c 3,-Ici u, --1— Inspector Date of Inspection Inspection , ‘,,,:, ' l''' ' '' ' ' j (I ' I : - ' ,Z C- i Pass El Fail 0 Fee MEMBER Inspection Pass Fail Fee Inspection Pass Fail El Fee Inspection Pass Fail Fee DATE ISSUED: 04/12/2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT REINSPECTION FEE AIRHANDLER/CONDENSER/HEAT PUMP 122 LEWIS AVE KENN ZAPP 218 W HUNTINGTON SAVANNAH GA 31401 912 - 231 -2075 MCS CONTRACTING LLC 540 E TAYLOR ST SAVANNAH GA 31401 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 110.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $3,000.00 REINSPECTION FEE — MECHANICAL ROUGH IN TOTAL BALANCE DUE: PERMIT #: 110043 $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org City of bee Island • Community Develc tent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 WSW 1 INTERNATIONAL CODE COUNCIL MEMBER Permit No. :' > Date Requested Owner's Name ,7 Date Needed Gen. Contractor 4')( / ) I. Subcontractor Contact Information ` s ` (2 - -<;;72- 66,t) Project Address ' 7• ` f LS 44 it... Scope of Work . 14•, 7 - -- ki- " A(" ;� • Inspector 7 % '/ Date of Inspection �! Inspection 3N1�" G I° 2:6 Pass El Fail -1:x-coo /11,,i‘o/ -31S/13-r---4-P1/1<---) Fee 3 Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee City of )ee Island • Community Develo !nt Dept. Inspection Report 403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. Owner's Name Zopp Gen. Contractor AA C S @ 044 Subcontractor Contact Information ,c1) r or t05(,0 C 22 2 LLi Date Requested Date Needed tj t ityk% Ewa* EL•12:7.1 INTERNATIONAL CODE COUNCIL MEMBER Project Address Scope of Work nt \r"-, c of\ clo ko p Inspector 17/ q Date of Inspection Inspection \ e r3re 0 5; Pass Fail t / - Inspectio'h Pass Fail Fee 17j- c„,)41-zs- 1 A IT) .1 1 <7., Inspection Pass Fail Fee Inspection Pass Fail Fee ��G\ g \ti�� Qh4hnn M1!.Ey���� City ck /bee Island " Community Dever rent Dept. r,Y ����,` ����`�� Inspection Report `, ����_=�� 403 Butler Ave. " P.O. Box 2749 " Tybee Island, GA 31328 ��'` `' i�� 'o L Phone 912.786.4573 ext. 114 " Fax 912.786.9539 CODECOUNCIL MEMBER Permit No. Date Requested - 1 Owner's Name -Za p f Date Needed 3 - 2 67-11 M C Gen. Contractor M CS C 0 ,n 4 " . Subcontractor Contact Information Al  I < P Io ( 1- 7 n4-4- 1 3 Project Address ' ,'. %_ L e r S Ave) . II /Scope of Work . '' T- h n C+ i t C 3 0 c.to n S .y- / PUT Inspector 2/1 Date of Inspection /! i/ FAlt Inspection 1 --- Pass 0 Fail in Fee L` p)Zuj 1 JA-1 ( :Pc (S) ki; - =1E. =a + (9.` :�� --r_A oci-t i M�� th�� 1--z cAriz i 1/ ter: 4Y1 ( cu x,c1 Inspection Pass Q' Fail Q' Fee Inspection Pass Fail El Fee Inspection Pass Q' Fail Q' Fee DATE ISSUED: 01 -31 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT AIRHANDLER/CONDENSER/HEAT PUMP 122 LEWIS AVE KENN ZAPP 218 W HUNTINGTON SAVANNAH GA 31401 912 - 231 -2075 MCS CONTRACTING LLC 540 E TAYLOR ST SAVANNAH GA 31401 P $ 60.00 $3,000.00 PERMIT #: 110043 TOTAL BALANCE DUE: $ 60.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: NAME ADDRESS PIN # TELEPHONE Owner , Z-KM 'LI t.J 1 ., "--V..,0_®.. 23 i 21) 1S Architect or Engineer Sc20 o Building Contractor M t--- SLA o la " S , �4.L.."-t C c 6 rA 1 °04 12-11 (Check all that apply) ❑ Repair ' esidential [/ Renovation Single Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial ❑ Footprint Changes ❑ Discovery n Demolition Details of Project: ez. ‘42-c.) cr.\ Estimated Cost of Construction: $ CX7kj Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry Z ^ fl -�-t (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms 3 # Bathrooms 1 Lot Area Living space (total sq. ft.) 1200 # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means oTjr -•<XC I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: ' P-5 1 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached NFIP Flood Zone Existing Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEESioo Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lea( safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA hi developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your prole( However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home ar planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Ca, Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -42, LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenan sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard informatic pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 chi care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Chi Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can crea dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovatio repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and chil care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Chi Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre - renovation disclosure form may 1 used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practice To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. Ti Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovatio Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training court you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed leas safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA hi developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read ab t how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. IF YOU'RE NOT LEAD-SAFE CERTIFIED, DISTURBING JUST SIX SQUARE FEET `COULD COST YOU .BIG TIME. Signature .r \f SLR Z Printed Name hit t( Date GEORGIA Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition, Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned Printed Name Date Office Use Only: Project Address: Permit Number: