HomeMy Public PortalAboutFPL Agmt Jan 2014I -
APPLICANT -INSTALLED FACILITIES AGREEMENT FOR UNDERGROUND
CONVERSIONS (WR # 4442441)
by an
This Agreement, made and entered into this�y Of a Florida c P� corporation or
between the TOWN OF GULF STREAM (the -Applicant"),
county with an address of 100 Sea Rd, Gulf Stream, FL 33483 and FLORIDA POWER &
LIGHT COMPANY ("FPL"), a Florida corporation organized under the laws of the State of
Florida, with an address of P.O. Box 14000, 700 Universe Boulevard, Juno Beach, FL 33408-
0429.
WITNESSETH:
WHEREAS, the Applicant has executed the appropriate underground facilities conversion
agreement ("Conversion Agreement") with FPL to convert certain overhead electric distribution
facilities (collectively the "Existing Overhead Facilities") to underground distribution facilities
(collectively the "Underground Facilities"), as described in the aforementioned Conversion
Agreement (hereinafter the "Conversion");
WHEREAS, the Applicant desires to perform itself, or through its Contractors, certain Work as
such term is described in Exhibit A associated with the Conversion;
WHEREAS, FPL is willing, subject to all the terms and conditions set forth below in this
Agreement, to allow the Applicant to perform the Work based on Applicant's assurance that such
Work will be in accordance with FPL's designs, instructions, standards and specifications, and
such Work will not adversely impact FPL or its electric customers;
NOW, THEREFORE, in recognition of the foregoing premises, and in consideration of the
covenants and promises set forth herein below, FPL and Applicant do hereby agree as follows:
1. Compliance with Tariff. Applicant shall comply with and abide by the requirements, terms,
and conditions of this Agreement, the Conversion Agreement, and FPL's electric tariff (the
"Tariff').
2. Conditions for Work to be Performed. Applicant shall, at its own cost and expense,
perform or cause to be performed, all Work, as described in Exhibit A, in accordance with
the terms and conditions of this Agreement and the standards and specifications shown in
Exhibit B. The Applicant shall provide all survey and staking to ensure that all Underground
Facilities are installed as shown in the Conversion Agreement and provide As -Built prints to
FPL within two (2) weeks of installation, signed and certified by a Florida registered
surveyor along with a FPL "Redline" document.
3. Commencement of Work. Applicant shall perform the Work, or any portion of the Work,
only upon receipt of a notice to proceed containing the approved drawings, specifications and
instructions from FPL ("Notice to Proceed"). After receipt of the Notice to oPr v. Proceed,
Page 1 of 7
Applicant shall provide written notice of intent to commence work to FPL at least five (5)
days prior to commencement of such Work. Applicant shall not perform any excavation
work without first notifying Sunshine State One Call for identification and marking of
existing underground utilities and complying with the excavation requirements set forth in
Florida Statute Chapter 556.
4. Materials. All Materials are to be supplied by FPL and shall be picked up by Applicant at
the following address at a mutually agreed upon time, typically with 5 business
days minimum notice, but no more than 15 business days notice, unless mutually agreed
upon. Alternatively, FPL will, at Applicant's expense, have the material delivered to a
mutually agreed upon location. Applicant assumes liability for any materials lost, stolen or
damaged once these materials are picked up by, or delivered to, the Applicant.
5. Contractors. Applicant may enter into a contract with a contractor for the performance of the
Work, or any portion thereof, provided that the contractor has been approved by FPL in
writing prior to execution of such contract. Applicant shall not make any substitution of any
contractor for the performance of Work unless the substitution is approved by FPL in writing.
The Applicant's contractor(s) shall perform ALL work as outlined within Exhibit A &
Exhibit B. No contract or purchase order between Applicant and its contractor(s) shall bind
or purport to bind FPL, but each contractor entering into a contract with Applicant with
respect to the Work shall name FPL as an intended third -party beneficiary and include a
provision permitting its assignment to FPL upon FPL's written request, following default by
Applicant or termination or expiration of this Agreement. Applicant shall provide FPL with
written certification from each of its contractors performing Work that all warranties,
guarantees and obligations of such contractors are equivalent or better than those granted by
such contractor to FPL for similar work and shall require that each such contractor name FPL
as an intended third party beneficiary of such warranties, guarantees and obligations with the
same rights of enforcement as Applicant. Applicant shall assign all representations,
warranties, guaranties, and obligations of all contractors at the request and direction of FPL,
and without recourse to Applicant, to FPL upon default by Applicant or termination or
expiration of this Agreement; provided, however, that, notwithstanding such assignment,
Applicant shall be entitled to enforce each such representation, warranty, guaranty, and
obligation so long as Applicant has any liability under this Agreement. Applicant hereby
assigns to FPL, effective as of the termination or expiration of this Agreement, all
representations, warranties, guaranties and obligations of all Contractors.
6. Rieht of Entry. FPL reserves the right, together with its agents or designees to enter the
7obsite as it may elect for the purpose of inspecting the Work, or constructing or installing
such collateral work as it may desire, or testing, boring or surveying, or any other purpose.
7. Inspection and Correction of Deficiencies.
7.1. All Work shall be properly inspected and tested, if appropriate, by Applicant and
shall at all times be subject to additional inspection by FPL and its designee(s).
Page 2 of 7 Tev. 10/23/06)
7.2. Neither the failure to make such inspection, nor the failure to discover defective
l workmanship, materials, or equipment, nor approval of or payment to Applicant
for such Work shall prejudice the rights of FPL thereafter to correct or reject the
same.
7.3. Applicant shall correct any deficiencies found with the Work, including but not
limited to discrepancies that are inconsistent with FPL's design, instructions,
standards or specifications within two (2) business days. If Applicant does not
adequately rectify the identified deficiencies in the required timeframe, FPL may, at
its sole discretion, perform, or have performed by its contractor the required repairs
and Applicant shall pay FPL for any costs incurred. These requirements apply
whether the discovery of deficiencies occurs while Applicant is performing its
Work or while FPL, or its contractor, is performing its portion of the work.
7.4. If any Work or part thereof is covered over contrary to the requirements of this
Agreement or the written request of FPL, it must, if required by FPL, be uncovered
for observation and inspection and covered again at Applicant's sole expense.
7.5. If any Work that FPL has not specifically requested to observe and inspect prior to
being covered has been covered, FPL may request to see such Work or part thereof
and it shall be uncovered by Applicant. If such Work or part thereof is found to be
in accordance with this Agreement, the cost of uncovering and covering again shall
be paid by FPL. If such Work or part thereof fails to meet the requirements of this
Agreement, Applicant shall pay all costs of uncovering, correcting, and covering
again.
7.6. Applicant shall pay FPL for all time spent reviewing and inspecting Applicant's
Work.
7.7. No electric customers shall be connected to the Underground Facilities prior to all
deficiencies being rectified.
8. Indemnity / Liability of Applicant.
8.1. Applicant shall protect, defend, indemnify and hold FPL free and unharmed from
and against any liabilities whatsoever resulting from or in connection with this
Agreement, the Conversion or in connection with the performance of the Work by
the Applicant, its employees, Contractors or Contractor employees, whether or not
such liabilities are due to or caused in whole or in part by negligence of FPL;
including but not limited to payment disputes between contractor and Applicant.
8.2. Applicant shall assume full responsibility for all damages and all restoration arising
in connection with the Work.
Page 3 of 7 (Rev. 1023/06)
9. Desien Work FPL shall provide all design, instruction, standards and specifications
necessary to perform the Conversion.
10. Completion of Work and Ownership. Applicant shall complete the Work by
, 20 and notify FPL when said Work is complete. Upon FPL's
final written approval of the completion of the Work ("Acceptance'), Applicant
acknowledges that all rights, title and interest, free and clear of all liens, in and to the Work
shall vest in FPL. If requested by FPL, Applicant shall provide FPL, in a form acceptable to
FPL, an affidavit of Applicant certifying payment of all indebtedness to all Contractors and a
written release of liens from Applicant and each Contractor.
11. No Liability by FPL. FPL assumes no liability due to any damage, misunderstanding of
installation drawings or specifications, or any actions due to Applicant or its Contractor.
12. Suspension for Cause:
12.1. FPL may at its sole discretion, by Notice, temporarily suspend the Work, or any
portion thereof, under this Agreement when the performance by Applicant or its
contractor is unsatisfactory by FPL to obtain the results required by this
Agreement.
12.2. The methods by which Applicant performs its Work are entirely the responsibility
of Applicant. FPL's right to suspend Work is intended solely to verify that the
Work being performed by Applicant and its Contractor conforms to the design,
instruction, standards and specifications and shall not obligate FPL to review the
efficiency, adequacy or safety of Applicant's or its Contractors methods or means
of operation or construction.
12.3. Any additional costs incurred by Applicant resulting from such suspension shall be
borne solely by Applicant.
12.4. If Applicant immediately corrects the unsatisfactory condition FPL shall authorize
resumption of the Work. Applicant's failure to immediately effect correction of
the unsatisfactory conditions shall be cause for termination of this Agreement.
13. Termination for Cause:
13.1. FPL may, upon Notice to Applicant, and without prejudice to any remedy
available to FPL under law, in equity or under this Agreement, terminate the whole
or any part of this Agreement for cause and take possession of the Work without
termination charge, penalty or obligation in the event Applicant fails to perform a
material obligation under this Agreement and fails to cure such material obligation
default within a reasonable period of time, but in no event more than ten (10)
business days, after Notice from FPL specifying the nature of such default (any
such termination referred to as a "Termination for Cause").
Page 4 of 7 (Rev. 1023/06)
13.2. In the event of Termination for Cause by FPL, Applicant shall:
a. Unless instructed otherwise in the Notice, immediately stop all Work
hereunder;
b. Issue no farther contracts except with the prior written consent of FPL;
C. Assign to FPL, to the extent requested by FPL, all rights of Applicant
under contracts outstanding;
d. Terminate, to the extent requested by FPL, outstanding contracts;
e. Fully cooperate and refrain from hindering or interfering in any manner
with any other persons or parties currently or prospectively performing
the Work; and
f. Take any other action toward termination, or toward preservation of the
Work, that FPL may direct.
13.3. Upon a Termination for Cause, all obligations of FPL hereunder shall terminate
effective immediately. Upon such Termination for Cause, FPL may either rework
or take over the terminated Work and proceed to provide such materials, supplies,
equipment and labor of both FPL and FPL contractors, as may be reasonably
necessary to complete said Work. FPL may have any partially fabricated portion
of the Work removed from Applicant's or contractor's facilities upon Notice to
Applicant. Applicant shall be liable for any increase of FPL's costs, including
rework costs, incurred by FPL as a result of FPL's termination of the contract for
cause.
13.4. In the event of Termination for Cause, FPL shall have no liability to Applicant for
costs incurred by Applicant as a result of such termination.
14. Termination Prior to Construction. Applicant may terminate this Agreement at any time
prior to the start of construction. If Applicant elects to still complete the Conversion, then
the Contribution -In -Aid -of -Construction (CIRC) amount provided in the Conversion
Agreement shall be revised accordingly. The revised Conversion Agreement must be
executed and any additional CIAC due received by FPL prior to the start of construction.
15. Assignment. This Agreement is not assignable.
16. Applicant's Payments to FPL. Any monies that are owed by Applicant to FPL under this
Agreement shall be paid to FPL within thirty (30) days of FPL producing an invoice.
17. Notice. As used herein, the term "Notice" shall mean any formal written correspondence
providing notice of action, purpose, intent or the like given under the provisions of this
Agreement. Unless otherwise provided in this Agreement, Notice shall be delivered in
Page 5 of 7 (Rev. 1023/06)
or by certified mail and shall be effective when received. General
person, by courier
correspondence is not categorized as Notice.
(Rev. 10/23/06)
Page 6 of 7
IN WITNESS WHEREOF, FPL and Applicant have executed this Agreement for the provision
of Applicant -Installed facilities to be effective as of the date first above written.
For TOWN OF GULF STREAM
By: e, Qt� —
(signature)
Name:.T0*1p K• D/l"itWuti.
(print or type)
Title: eMC
(print or type))
By:- 2?1 ato,
(signature)
_
(print or typ )
Title: -rO W n rlej, k
(print or type)
Approved as to Terms and Conditions:
(signature/title)
Approved as to Form and Legal Sufficiency:
(signature/title)
By CQa 2-
(a a e
Name: —rk0J44At lNf f!41;,-,
(print or type)
Title: 604�or.fra (/Kai w i . r"C,
604wtS
(print or type) 61
Page 7 of 7 (Rev. 1&23106)
Exhibit A
WR # 4442448
Work to be Performed:
Applicant shall:
• Install all conduit and concrete products based on the attached
specifications and in the locations as indicated on the attached
drawings.
• Install cable, transformers and switch pads and equipment make-up
including primary and secondary terminations and connections.
Exhibit B
WR # 4442448
Standards and Specifications
0
qqC ppo
5 w ON b o
5tl� g
b0 O �y H b N� M
cdH
%D U
Nen
a o o A o
to)
0 � g `�O
;=j Y
V1 00p U ` cJ 4� b P,
a
Q ,d •� A .d 03
a a ab4,
3 e g
g P�
10 b ;o Cd Cd
a
goo dt)
0 0o
�a g �' Ir m a qq o y
WW
0.N b �7 W
®' oU
4-, ,� c4 o 0
W P o a o o0 rd
o
Id
lid
H b �pC a �� .�, � rMM go
UU rd Id 0 0
'd
o I. Y 0
0 hoa ;9 1a p4) o� N0 04
. b Atli O 00 wW F4 W T❑J g a)
VGd � C7 �' `I � ti0 v U � LY HHHOOO U
.-i N
vi <f vi r 00 ON
b
0
0
o
A p
° b A
F4
aba o
q ° d *d g m
b H O
H
o N 4) b o
w
O° A .d
N M
4� 0 p, 0
b UJ
^ bU Fi O N Ci
U
N N
�clnj U
o �a�
q v H q ,n p o
° .fl p.i o
y o q W d m w p
a�qq
y A A •6 �1 ° t°]
tb
th 00 O .L v p 0 b ++
'+'' U r j, w0 `d U �vyi
T � �
-boil
� �j � � a'pG"i o Sqp .G o
cc�a� 2 y O o a�
M y 0 A O O U m 7qq U O
O A '° O O c a, m boo'Li
p P, P o
J3 2 W q N Ad O 0 O�q A y N
Cd
em 0
44 0
Eb 0 0,v b P
U5 A A m
eq
b f-1 b '4 v
U a U m a W° A o
'" Wim-+ W
STAKING and AS- BUILT SURVEY REQUIRMENTS
STAKING
It wlil be the responsibility of he Customer/contractor and/or his surveyor to initially stake the entire Io
establishing the following:
Centerline of trench
Center of manhole with off sets
It is the responsibility of the Customer/contractor and/or his surveyor to maintain the original staking or
perform any re -staking that is required.
Grade Information, reference information, benchmarks, etc., that may be required will be supplied by the
developer / owner.
AS!, customer n TSURVEY orwlll have a land surveyor, who Is registered and licensed in the State of Florida,
obtain, before back filling occurs, ail AS -BUILT field information necessary for updating and correcting
FPL construction drawings. The surveyor will Is mark, with a red pencil, on both the profile and plan
view of FPL's construction drawings, all corrections, additions, and deletions while at the Roe Representb site. ative.
drawings are to remain on the job site at all times for inspection by the FPL Company P
Construction drawings are to be updated by the surveyor, while at the job site, each time any AS -BUILT
survey information is BOOK. This FIELD BOOK isdto include he company name�ewmembersrd all Is also toUand the ILT edate, each timermation In a AS
BUILT information is obtained.
The AS -BUILT information required is as follows:
tifiable as a
nd
ne or
ht -
t oAlflwayill facilities are
This basetlinle or to baseline or ear nce line musterence line that berelated to thebareanof the job siteeandlibe capable
FPI2s construction of being baseline or transposed
eference line, tt he the informal Huls to be referen ed to this linerraings. If the construction awing includes a
2. All elevations will refer to the datum plane of "mean sea lever as defined by various bench marks of
the United States Geological Survey or Coast and Geodetic Survey. They are to be taken along the
top of the duct bank, with no offsets, and at existing grade, all at 60 foot maximum intervals.
Additional elevations and grade shots are required when there is a change of elevation and/or
direction and where tfth d banknteuctthElevations are also required on the roof of the manhole, at existing grade,
le -
3. Overall total lengths of duct are to be recorded. Measurements are to be taken from the manhole's
outside wall and directly along the length of the duct bank with no offsets.
4. When other utilities are uncovered, (water, gas, sewers, telephone, CATV, etc.) their size and type
are to be determined, their location referenced to the baseline, and their elevation noted. An
elevation will be taken n the duct bank directly above or below the other utility and at existing grade.
6 duplicate
f mof
con t300K Information prints,
marked In
by the redsurpeensIs also office.'required. This duplicate set may
be
follow ng are presented to, and approved hytwill not be
-the construction theFPL Cmpany Repreesntativeete urttii all of the
a) Signed and sealed copies of the AS -BUILT stxvey FIELD BOOK.
b) The set of FPL construction drawings marked in red by the suryeyor in the field.
c) The duplicate marked set of construction prints.
D-15.0.1 STAKING INFORMATION D-15.0.1
(EXHIBIT "A")
NORMALLY ON A PVC OR WIRE STAFF, ARE USED IF FIELD CONDITIONS ALLOW CLEAR SIGHT OF THE
NOT TO BE USED WHEN FACE STAKING. FLAGS SHALL BE A MINIMUM OF 4•" x 5" WITH A 21" WIRE.
1
THE APPROMIE PAEPRMO TYPE LAY BE USED IF FIELD MOMS AION. FAGS SHIU. CE Pe7K IETIGRS ON WWI! HAG AND PREFInTED AS FOUOAS:
PROPOSED FFL POLE, PROPOSED FPL ANCHOR, PROPOSED FPL TRANSFORMER PAD, PROPOSED Q, FPL TRENCH, D.
PROPOSED FPL ELECTRONIC CABLE MARKER, PROPOSED FPL HAND HOLE
STARESES CAL
STAKES U'. ARE
USED WHERE TO 48- ONE BY TWO'S EXTRA STABILITY IS NEEDEDOSUCHING NAS OWPPASTURES, UNPAVED RACTICES AND IDRMNG AREAS, ETC. AND ARE
HUBS',
USUALLY DRIVEN FLUSH WITH HE GROUN0.
STAKE PARKINGS
DEPENDING ON SURFACE CONDUIONS AT THE WORK LDCATION, DIFFERENT METHODS OF STAKING MAY BE u5E0. N EMH, STAKES
PAINT WILL BE
IN PAVEMENT OF
IT
BOF? HUBS WILL E MARKED AND PAINTED. WHERE DEFINITEDPOINTS OF ALIGNMENT ARE REOUREO, SUCH ASnRIGHT OR SWAYS,OR TNGFACER SiAKNG,
HUBS WILL HAVE NAILS DRIVEN INTO THEM. NAILS AND DISCS WILL BE USED ON ASPHALT, AND CONCRETE WILL BE DRILLED AND
PAINTED TO INDICATE THOSE POINTS.
REGARDLESS OF THE LOCATION'S CONDITION, OR OF HE METHOD OF STAKING USED, CERTAW MARKINGS MAY BE USED BY THE
SURVEY CREW
HE MOST COMMONLY USED OPRIATE WORKING CREW MARIONGS. ON THE STAKES. HESE MARKINGT EACH STAKED GCATION WILL BE NTHREPRESENTS.' SIDES, ON PAVED
SURFACES, THESE MARKINGS WILL BE PAINTED.
1 "AMC - INDICATES LOCATION OF THE EYE OF THE ANCHOR ROD.
2. I1 C' - INDICATES LOCATION OF HE EYE OF THE ANCHOR ROD -
3. 'FPL" -INDICATES MARKINGS ON PAVEMENT (IF EXISTING) PERPENDICULAR AND IN CLOSE PROXIMITY TO'THE POLE LOCATION.
4. POLE CENTER STAKING SYMBOLS - ANY ONE OF THE FOLLOWING DETERMINES LOCATION OF THE CENTER OF THE POLE.
A,) 'CTR POLE" OR "POLE" MARKED ON A STAKE.
g,) "j]' OR '0" WITH "POLE" IN THE CENTER, ON PAVED SURFACES OR SIDEWALK, (A NAIL & DISK WITH RIBBON
MARKED 'POLE" MAY ALSO HE USED.)
5_ 'Q TRENCH" OR 'CL FPL TRENCH" - INDICATES CENTER LINE ALONG WHICH A TRENCH IS. TO BE DUG.
6. -IX A - OR "CTR T% PAD" - INDICATES THE LOCATION OF THE CENTER OF A TRANSFORMER PAD.
7. '10' 0/5 ¢ TX PAD &TRANSFORSMER PAD ALONGGITS ENTERET S LNEEPSTAKE
ERPENDI PERPENDICULAR TO TRENCH' CENTER OF
B. 'GTR HANOHOLE" - LOCATION OF CENTER OF HANDHOLE.
g, "10' 0/S rh HANOHOLE' & "THE HANOHOLE ALONG ITS ENTERU EEFPERPENO ENCE STAKE UTAR LFROM HE CENTER OF HE
TO TRENCH.
TD. 'CTR MARKER" - LOCATION OF THE CENTER THE MARKER.
11. " TO' O/S q MARKER' & "20' 0/S % MARKER'
- OFFSET REFERENCE STAKE 10' & 20' FROM CENTER OF MARKER PERPENDICULAR TO TRENCH.
12 " " ' ADE AT MAY RE PRESENT WHERE CENTER OF PAD OR
L5- A NOTATION INDICATING NUMERICALLY HOW MUCH TO
CUT
SARY-
13. " OFF ET REFERENCE HPAINT FOR T ES
MARK
PAVEMENT
05 EXT SE NG) PERPENDICULAR AND IN CLOPROXIMITY TO
O
I4, 'JKR" - OFFSETMARKER,
IREFERENCE E ASTOM RR ON PAVEMENT
PLENT (IF EXISTING) PERPENDICULAR AND IN CLOSE PROXIMITY TO
THE SES, 4ft
F P L
OH & UO DISTRIBUTION SYSTEM STANDARDS
DPM I JES I JJM
NO. F DATE I ReA90N
ORIGINATOR: PMG DRAM BY: RAS
NO SCATS
D-15.0.2 STAKING INFORMATION D-15.0.2
. (EXHIBIT "A")
ED CRAYONS. IDES STAS. NDARD:
PLASTIC
RICBONS MAYBE USED POR IDENTIFYING STAKES, THE FOLLOWING AP.WA COLORS
COLOHAVE BEEN
COLOR Q
- WHITE
PROPOSED EXCAVATION
- PINK
TEMPORARY SURVEY MARKINGS
- RED
ELECTRIC POWER LINES. CABLES. CONDUIT AND LIGHTING CABLES
- FELLOW
GAS, OIL STEAM, PETROLEUM OR GASEOUS MATERIALS
- ORANGE
COMMUNICATION. ALARM OR SIGNAL UNES. CABLES OR CONDUIT.
- BLUE
PORTA13LE WATER
- PURPLE
RECLAIMED WATER, IRRIGATION AND SLURRY LINES
- GREEN '
SEWER AND DRAIN LINES
(EXISTINALL SSCOLOR STAKESUSED By D REO /� FLORIDA
POWR& LIGHT HIS COLOR IS ILABLEG SIPRAY PAINWILL BE TD UNAS DRNAM&5 j1504 -1TV) By M51 7100-5.
ILL IBF- USED TIPROPOSEDCOLORS.R
CRAYONS AND PLASTIC R1880NS USED FR STAKING PAL FACILITIES SHOULD APPROXIMATE HESE FACILITIES.
F P L
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORIGINATOR: PW DRAWN BY: RAS
9/96 APPROVED: &L UCEVOY NO SCALE
SUPENVSOR.N UUGRODU
PCT
SUPPORT CES _.
GATE I IREYISKIN
STAKING INFORMATION D-15.0.3
D- 15.0.3 (EXHIBIT "A")
POLE AND ANCHOR STAKING
LOCATION REPRESENTS HE LOCATION OF THE EYE OF THE ANCHOR ROD.
1. AN ANCHOR STAKE TO BE SET I'
2. PRO ERN WILL BE POPOLES THAT ARE TO BE SET 6' IN E CENTER STAKED. POLES SHOULD (ALSO DBE CENTER O STAKED WOOD POLE
N IT 15 ND NECESSARY TOIN
HAVE AN EXTREMELY ACCURATE POLE SEMG.
POLE LOCATION
CENTER STAKED
E%ISi1NG POLE UNE X
0
zsD't zsD'{ 2sD•*O 250** -Oso' x
--
®o &0o Oo 0®
FIGURE 1 POLES2O 7O ARE CENTER STAKED
I -C
3: WHERE MORE ACCURATE POLE SETTING IS REQUIRED. SUCH AS AT THE RIGHT-OF-WAY UNE OR THREE INCHES BACK
DETERMINES THE POLE MAY BE FCE STAKD. A STRONG RD.
SPECIFOED FACE LAOCAT ON. EWHERE NECESSARYTHESEHESULLED EWMARKI GS MAY BE ABBREVIATED OR EEN MO ADJACENT sTAKES. E SPELLED OUT�
F.F. OR FIELD FACE S.F. OR STREET FACE.
ERMINE
E LINE T14AT
A MINIMUM ACE OF HE SPECIFIED
OF THREE
OLE P IBIS SHOULD BE MARKED. TWO E AGAINST- THED TIES HEFPOLE DOWN AS TTHESE MUST TO ITS LATERALPOSITIONPOST ON T13EMEN THE
FIRST TWO.
C
3' MIN.
VARIES
B
CURB, A —
LINE P.RmuL DIMENSION (MAY BE D. ZERO)
FIGURE 2
OF THE POLE IS TO BE DETERMED
-A-- HEIR LOCA TIKE A AS IN -STAKE (NAIL WILL BE DRIVEN INFACE! TO EACH HUD. HOLES BE DRILLED AND WM(EDMON
^C PDLE"E'AND iiiJL NOICATEAND DISCS POLE 5E TO BE LOCATED ALONG THIS ED ON ASPHALT TO AID(AXIS. PERPENDICULAR TALIGNMENT. "c- IS O UNE
FROM 'A' TO 'W. POLE LOCATION NUMBERS ON THE STAKE MAY BE PRESENT TD AID IN IDENTIFICATION.
DATE REK4ON
STAKES
F P L
OH & UG DISTRIBUTION SYSTEM STANDARDS
ORICINATORI PUG DRAWN By.. RAS
DPM JES dDT
PYG RAS .DY pATL 8/03/96 AFPROYEO: JJ. Mtt F ' PRONO $CP1E
SUPPORT SUMCEOUGT
D-15.0.4 I STAKING INFORMATION
1
D-15.0.4
1R8yFOR4 RPAD.-HANDROLE d[.YAMIIGII IIJea'�
1. TST�ANSFOARE US PADS AND ALLY CUP DUPoNXERSGTRENCHMG OFFSET E MOST OFTEN ItlR FACE STIONED ATaAKES EAR ARE U7HESEFUL TO THE CONSTRLICNONRFORCES E
TO RE-ESTABUSH THE LOCATION OF THE FACILITIES AFTER TRENCHING. STAKE CENTER UNE OF HANDHOLE & MARKERS.
THE FOLLOVING PARTICULARLY FOR 7TRANSFORMER PAOARE PS�BUTF FACE STAKING OFFSET REFERENCE OFFSESTAKESRMAYR ECNEEOEDSTAKI AT
TIMES
Nr. FACE SFTREES AXING SOR OTHER
S
OBSTRUCTIONS PREVENT THE USE OF FACE STAKES. ADOIRUNAL STAKES SUCH AS CORNER STAKES MAY BE USED TO SUR
LOCAL CONDITIONS.
2. WHERE GRADE STAKES ARE REQUIRED. INSTALL AFTER TRENCHING AT PAD OR RANOHOLE.
JRANSFORMER PAD- HANy O _HOLE. MARK£R & MANHOLE STAKING
1_ THE FOLLOWING TABLE GIVES THE DIMENSIONS OF THE CONCRETE TRANSFORMER PADS TO AID IN ACCURATE STAKRVC.
PAD TYPE W L APPLICATION
UX -115 6'-B` 5-D' 30 LF PM W/SECT.
UX -118 6'-0' 7-0" 30 &20 W/O SECT. & 30 OF W/SECT..
UX -717 d' -D" 4'-7' ALL 10 -
UX -119 9-1D` TO'-6'PADUOUNTED AUTOTRANSFORMER
UN -18 1D' 5FEEDER SPLICE BOX
LENGTH AT40 WIDTH OF CONCRETE PADS
FACE STAKE—
FACE STAKE I �TAATTX EP O O/S
EASEMENT
to PATI
^H FPL TRENCH =N0"N
TXEPAD FRONT 7Ck 2`_
R/W
FACE STAKE
FIGURE 3 - FRONT_
EASEMENT
FPL TRENCH
1O'
T
MARKED 10' O/S
I, TX PAD
OFFSET REFERENCE STAKES-17
TAKESIT , EASEMENT UNE
-I PRC
10'
URD CONSTRUCTION
ONG
20POSE0PD
I
'PROPOSED FPL
TRANSFORMER PAD' FLAGS
OR
'CORNER TX PAD' STAKES
FIGURE 5 -FRONT L07 URO CONSTRUCTION
TRENCH STAKING FACE STAKING CURVES. WHERE
5SEPARATION
HENE05 NSSTAKES HRHESETE@1U
' APART EXCEPT ON
SUWBURNNMOULRADIUSCUVE TRE a L 1WUOF STATES (CPT&2ONONE) TO AVOID `C TTNG CNER:
DIFFERENT METHODS OF STAKRVG, SUCH AS A STAKE PER LOT, MAY BE USED IF LOCAL CONDITIONS REQUIRE THEM.
F P L
OH & UG DISTRIBUTION SYSTEM STANDARDS
DATE i REl45KM
ORIGMATOR: PMO MytN Hr. RAS
DATE: 8/09/96 APPROVED: J.T. VCEVOY NO SCALE
SOp T �ESPROOUCT
suppm
��
L a . ��j L .
k
\
��
��
L a . ��j L .
LLI
�
�
0
LL
�
\
\
�
§
\�/
Z\
3
§f7 _ .
/
®Ak
�
\
\
�