Loading...
HomeMy Public PortalAbout11-0103 Village Plaza LLCCity—Of Tybee Island - Planning & Zoning Dept. /MTN Iti mu. Inspection Report rzukranit 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERNATIONAL Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL' MEMBER Permit No. /VD 3 Date Requested A/Z., Owner's Name 1i,114.617, Pk-71 I 17. Date Needed Gen. Contractor Subcontractor Contact Information ' Project Address Scope of Work Inspector Date of Inspection / -3 Inspection Pass a Fee Inspection Pass El Fail El Fee Inspection Pass Fail Fee Inspection Pass Ei Fail Fee DATE ISSUED: 03 -3 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT ELECTRICAL - OUTLETS & LIGHTS 502 FIRST ST VILLAGE PLAZA LLC PO BOX 2812 TYBEE ISLAND GA 31328 O'CONNOR ELECTRIC CO 1431 DALE DR SAVANNAH GA 31406 P $ 50.00 $ 400.00 PERMIT #: 110103 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org riAg„ CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date 31 q- Location of work (street address) Contractor er5-- s4. i/ New Work Replacement ocavkb,- c-2 Address of Contractor Property Owner Telephone 9! 1,- B 51 7 6 Date work will be ready for inspection, if known Estimated cost of construction ')0 wY�( Telephone Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this olicy) nay res sconnection of the electrical service until all violations and deficiencies are corrected. Owner /Contractof'fgnature Owner /Contractor Printed Name • 3/x (11 Date APPROVAL Fee 4. 6-D Building Official Date • A/C Unit and Heat Pump Attic Ventilation Fan Bell Transmitter — low voltage Border /Outline Lighting Building Saw Exit Lights — life safety Heat Pump Meter Box Motor(s): hp Outlets —110 volts circuit Parking Lot Lights c/ Pool Lights — grounding Range — commercial Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this olicy) nay res sconnection of the electrical service until all violations and deficiencies are corrected. Owner /Contractof'fgnature Owner /Contractor Printed Name • 3/x (11 Date APPROVAL Fee 4. 6-D Building Official Date • Range Hood — commercial Service: amps Sign Circuit - wattage Smoke Detector — low voltage Spa or Tub — grounding Special Outlet Swimming Pool — grounding Water Heater Welder — 220 volts circuit Well Pump — grounding X -ray c/ Other AccQ :T- a -✓--k.-uP oc -ale, Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this olicy) nay res sconnection of the electrical service until all violations and deficiencies are corrected. Owner /Contractof'fgnature Owner /Contractor Printed Name • 3/x (11 Date APPROVAL Fee 4. 6-D Building Official Date •