HomeMy Public PortalAbout11-0104 HoffnerDianne Otto
From: George Reese
Sent: Monday, October 10, 2011 2:34 PM
To: Dianne Otto
Subject: RE: open permits
From: Dianne Otto
Sent: Friday, October 07, 2011 2:31 PM
To: George Reese
Subject: open permits
George,
Please let me know if you have any issues with us closing the following three open permits.
1. 11-0004: 1709 Buter Ave. / Gabrille Franklin - shallow well —will let you know tomorrow
2. 11-0263: 101 First St. / Joseph Dabit - replace sewer service —can be closed out
3. 11-0104: 1103-C Bay St. / Carolyn Hoffner - relocate water meter —can be closed out h—
Thank you,
Dianne K. Otto, CFM
City of Tybee Island
pHone 912.786.4573 ext. 136
fax 912.786.9539
DATE ISSUED: 03 -3 -2011
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
PLUMBING - RELOCATE WATER METER
1103 C BAY ST
OWNER NAME CAROLYN E HOFFNER
ADDRESS PO BOX 1850
CITY, ST, ZIP TYBEE ISLAND GA 31328 -1850
PHONE NUMBER
CONTRACTOR NAME TYBEE ISLAND PLUMBING
ADDRESS PO BOX 21
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
P
$ 50.00
PROJECT VALUATION $ 300.00
PERMIT #: 110104
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Date
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. Box 2749
Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
PLUMBING .PERMIT APPLICATION
Location of work (street address) I('12 K S .
Contractor
Address of Contractor f 5
Telephone number of Contractor 7 — 176
7
Name of Property Owner
Mailing address of Property Owner p,
l e ' o 3/ 32-6'
Telephone number of Property Owner 1 gt, o5 f4) ,t c 7-376 7 ( Cam)
/Date work will be ready for inspection, if known
/Estimated cost of construction
New Work
got)
Replacement
T,fizeL C
Oil
Gas
Permit Number
Electric
Backflow Preventor
Disposal Unit
Domestic Water Connection to Main
Drain Roof or Area
Drainage or Vent Piping
Fire Protection Sprinlder System; Number of Heads/Nozzles
Grease / Oil Trap
Hose Bib
Hot Water Heater
Icemaker
Lawn Sprinlder System
Plumbing Fixture
Residential House Sewer Connection to Main
Sewer Cleanout
Sewer Stub
Vacuum Breaker
Water Meter kvr. t, pi ,v ,0�
NeSir T "
Water Service Line Residence
Water Service Line — Replacement
Water Softener
Other