No. 09 -1127
Dale of Adoptio June 11, 2009
AUTHORIZING A PROFESSIONAL SERVICES CONTRACT FOR
ENGINEERING SERVICES WITH CNIE ASSOCIATES —
CARTERET ROAD IMPROVENIENTS PROJECT PHASE A & B
WHEREAS, the Borough of Carteret is in need of specialized engineering services in
connection with the Carteret Road Improvements Project; and
WHEREAS, the Borough's Consulting Engineers, CME Associates, possess the
requisite skill and expertise to provide said services; and
WHEREAS, CNIE Associates has submitted a proposal to provide said engineering
services at a total cost not to exceed $60,000.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
for said purpose.
NOW, THEREFORE, BE IT RESOLVED by the Mayor mid Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. That the proposal from CNIE Associates for engineering services
related to the Carteret Road Improvements Project, Phase A & B,
in a total amount of $60,000.00 billable in accordance with CME's
existing contract with the Borough is hereby approved;
2. That annexed hereto is a copy of said proposal;
3. That this action is approved as an award of a professional services
contract pursuant to N.J.S.A. 40A:11- 5(1)(a) in accordance with
the Borough's Fair and Open Process as authorized by law.
Adopted this I I' day of June, 2009
and certified as a true copy of the
original on June 11, 2009.
KATHLEEN M. BARNEY,
Nlunicipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YFS
NO
NV
A.B.
COUNCILMAN
YES
NO
i
A.B.
BELC.IND
COLON
X
DI
X- Indicate Vote AB- Absent NV -Not Vot'g
XOR- Indicates Vote to Overrule Veto
Adopted at a meeting of the Municipal Council
l
tune 11, 2009
CL
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of the
Borough of Carteret that has appeared in the Home News Tribune, a
newspaper which is printed in Freehold, New Jersey and published
in Neptune, in said County and State and of general circulation in
said county. One 1 time(s), once in each issue as follows:
September 11, 2009
Notary Public of New Jersey
LINDA A RIVERA
NOTARY PUBLIC OF NEW JERSEY
MY COMMISSION EXPIRES MAY 2, 2011
Sworn and subscribed 4efore
me this / `f v U day of ,
��,
:athleen M. Barney, MMC
Municipal Clerk
OFFICE OF
KATHLEEN Al. BARNEY, RMC /CMC
MUNICIPAL CLERK
TEL (732) 541 -3800
FAX (732) 541 -8925
61 COOKE AVENUE
CARTERET, NEW JERSEY 07008
June 11, 2009
TO: Patrick J. DeBlasio, Treasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS:
For: CME Associates, Re: Engineering Services, Re: Carteret Road Improvements
Project Phase A & B.
Name of Account: Resolution #09 -127
AMOUNT TO BE ENCUMBERED:
:00 billa4le in accordance with CME's
KATHLEEN M. BARNEY
Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that there are sufficient funds available in the current
budget to enable the Municipal Council to authorize the entering into a contract between the Borough of:Carteret
and:
U
The funds available for this coot a t are in the Budget in the account of.
- 8I 7y/ 7 asses fre azeoz- -7' .,>n q,o /- Oo- /br- . ; "7 3SO,9
739,037
in the amount of: 4 60 nv®. 00
By this certification, I have hereby encumbered the above named acco t for the amount of the contract.
ATRICK eBLASIO, Treasurer
Date: C / - D
>7 Tu'g4 of & firpf
MIDDLESEX COUNTY
�le (u 7 �ers e�
existing contract
tt
BOROUGH OF CARTERET
20 COOKE AVENUE
CARTERET, NEW JERSEY 07008
THIS AGREEMENT: made this 11 °i of June 2009
By and between: CME Associates
3141 Bordentown Ave.
Parlin, NJ 08859
And the Bo roueh of Carteret a municipal Corporation having its Principal Office at the
Borough Hall, 61 Cooke Avenue, Carteret, New Jersey.
As per Resolution Number 09 -127.
THE CONTRACTOR does hereby agree to perform the following:
PROFESSIONAL SERVICE CONTRACT FOR SPECIALIZED ENGINEERING FOR
ROAD IMPROVEMENT PHASE A & B.
NOT TO EXCEED $60,000.00
According to the terms set forth in the Resolution.
THE BOROUGH does hereby agree to pay the Contractor the sum set forth in
Resolution.
IN WITNESS WHEREOF', the parties hereto have hereunder set their hand nd seals or
caused these presents to be signed by their proper corporate officers and t eir. corporate
seals to be hereto affixed, the day and year written above.
WITNESSETH BY:
Fort the Corporation: > �>
I.
BOR OF C ARTE .ET
J Adthleen M. Barney /(
Municipal Clerk (/
BY:
14. Reiman
Mayor
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
Attn: Honorable Mayor Daniel J. Reiman
Re: Proposal for Professional Engineering Services for:
Carteret Road Program
Proposal No. 2009 -074
Dear Mayor Reiman:
In accordance with your request, please find enclosed our estimate of fees for
professional services for the above - referenced project. It is our understanding that the
Borough desires to perform roadway improvements at various locations and will Include
the following:
• Full pavement reconstruction of the existing roadways;
• Concrete curb and gutter removal and replacement along the entire length of
roadways;
• Driveway apron and handicap ramp reconstruction;
• Miscellaneous drainage repairs including installation of bicycle safe grates,
'ECO' castings, and roof leader extensions in accordance with NJDEP
stormwater regulations;
• Miscellaneous sanitary sewer repairs.
At this time, based on the roadways identified by the Borough,
construction cost estimate of the road improvement program is
$1,950,000.00. Please find enclosed our preliminary construction cost
roads included in the road program at this time are as follows:
• Whitman Street — entire length
• Patrick Street — from Whitman St. to Whitman St.
Sunset Court — from Tennyson St, to Charlotte St.
SACadere10'roposals12009 -074 Carteret Road Program 3- 31- 09.doo
C01'"TM AND KMK3PAL 04GINEERS
1460 ROUTE 9 SOUTH, HOWELL, NEW JERSEY 07731 - (732) 462.7400 - FAX: (732)
the anticipated
approximately
estimate. The
CJ
JOHN H. ALLOAIR, P.E., P.P. (1883 -2001)
DAVIDJ. SAMUEL, P.E., P.P.
JOHN J. STEFANI, P.E., LS., P.P.
......
JAY B. CORNELL, P.E., P.P.
MICHAEL J. MCCLELLAND, RE., P.P.
GREGORY R. VALESI, P.E., P.P.
u
TIMOTHY W. GILLEN, RE.. P.P.
BRUCE M. KOCH, RE., P.P.
rb ERNEST
J. PETERS, JR., RE., P.P.
SSOCLATES
April 2, 2009
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
Attn: Honorable Mayor Daniel J. Reiman
Re: Proposal for Professional Engineering Services for:
Carteret Road Program
Proposal No. 2009 -074
Dear Mayor Reiman:
In accordance with your request, please find enclosed our estimate of fees for
professional services for the above - referenced project. It is our understanding that the
Borough desires to perform roadway improvements at various locations and will Include
the following:
• Full pavement reconstruction of the existing roadways;
• Concrete curb and gutter removal and replacement along the entire length of
roadways;
• Driveway apron and handicap ramp reconstruction;
• Miscellaneous drainage repairs including installation of bicycle safe grates,
'ECO' castings, and roof leader extensions in accordance with NJDEP
stormwater regulations;
• Miscellaneous sanitary sewer repairs.
At this time, based on the roadways identified by the Borough,
construction cost estimate of the road improvement program is
$1,950,000.00. Please find enclosed our preliminary construction cost
roads included in the road program at this time are as follows:
• Whitman Street — entire length
• Patrick Street — from Whitman St. to Whitman St.
Sunset Court — from Tennyson St, to Charlotte St.
SACadere10'roposals12009 -074 Carteret Road Program 3- 31- 09.doo
C01'"TM AND KMK3PAL 04GINEERS
1460 ROUTE 9 SOUTH, HOWELL, NEW JERSEY 07731 - (732) 462.7400 - FAX: (732)
the anticipated
approximately
estimate. The
CJ
Mayor Reiman
Borough of Carteret
Re: Carteret Road Program
April 9, 2009
Page 2
Proposal No. 2009 -074
• Tennyson Street — from Harrison St, to Washington Ave.
• Charlotte Street — from Harrison St. to Sunset Ct.
• Holmes Street — from Longview Ter. to Washington Ave.
• Lexington Avenue — from Tennyson St. to Byron St.
• Longview Terrace — from Tennyson St. to Holmes St.
With this being said, we anticipate that the following tasks will be required:
A. Survey and Basemap Phase Services — CME Associates will prepare a Base Map
to be utilized during the Design Phase Services. The Base Map will include
Geographic Information System (GIS) mapping along with supplemental information
as necessary to prepare construction plans. The supplemental information will use
assumed horizontal and vertical datum and will include:
1. Top of curb and gutter grades
2. Roadway centerline grades
3. Location of existing physical features within existing pavement requiring repair
4, Areas of potential drainage Issues
Our scope of services will involve'the following tasks:
• Field traverse, and data collection;
• Field survey data reduction and computation;
• Preparation of existing conditions map Including GIS and site features.
B. Design Phase Services — This work will consist of the preparation of construction
plans, quantities, and cost estimate. The services have been divided Into tasks as
detailed below:
• Prepare, issue, and coordinate a request for proposals for closed conduit TV
inspection and cleaning for all sanitary and storm sewers within the project
limits. This Information will be reviewed by our office, and we will work
closely with the Borough to determine proper corrective solutions;
• Prepare, issue, and solicit quotes to perform pavement coring within the
project limits. This information will be reviewed by our office, and we will
work closely with the Borough to determine design of the appropriate
pavement section for each roadway;
SACarteretTroposals\2009 -074 Carteret Road Program 3.31- 09.doc
CJ
Mayor Reiman
Borough of Carteret
Re: Carteret Road Program
April 9, 2009
Page 3
Proposal No. 2009 -074
• Prepare existing and proposed vertical profiles for the roadway centerline,
curb, and gutter lines;
• Coordinate with utility companies;
• Prepare design cross sections;
• Design required storm sewer Improvements and profiles;
• Prepare construction details, location map, and traffic control plan;
• Prepare final construction quantities;
• Prepare final construction cost estimate.
C. Preparation of Bid Documents — This work will consist of the preparation of
contract documents and specifications required for public bid. Details will be
provided for the items to be included in the contract including plans for the
maintenance and protection of traffic.
D. Bid Phase Services — Work in this phase will provide the following services to
publicly bid the project in accordance with the Local Public Contracts Law:
• Provide Bid Documents to Prospective Bidders as needed;
• Answer Prospective Bidder's Request for Information;
• Provide Addenda for Clarification of Project Specifications;
• Attend Bid Opening;
• Analyze Responsible Bids and Recommend Contract Award;
• Coordinate with Borough as needed.
E. Construction Phase Services
Generally, we prefer to quote services for construction phase upon the completion of the
Bid Phase as the ultimate cost for our services will depend upon a number of factors
including the final design, the contractor to whom the contract is awarded and the
desired level of construction observation required..
We would recommend that the fee outlined below be budgeted for this purpose. Should
the final design and other contract factors preclude CME from being able to properly
administer the project within this budget, we will Inform you immediately.
SACarteretWroposats\2009 -074 Carteret Road Program 3- 31- 09.doc
W
Mayor Reiman
Borough of Carteret
Re: Carteret Road Program
April 9, 2009
Page 4
Proposal No. 2009 -074
We will provide the necessary engineering services as described above based upon the
cost breakdown as noted below:
A. Survev and Basemap Phase Services ................................ I ........
.
d
B. Design Phase Services ......................... :........................................
C . Preparation of Bid Documents ........................ ...............................
D . Bid Phase Services ......................................... ...............................
E. Construction Phase Services (Budget) ... . .... .... ................ I ...........
.
Total Estimated Fee for Services ............................... ............................... $196,000.00
Exceptions
• Any engineering services not indicated in this proposal will be Invoiced at a
mutually agreed upon price and as specifically authorized by the
Administrator and /or the Borough Governing Body,
• Fees associated with any permitting associated with the improvements
referenced within this fee estimate.
• The fees on the hourly rate schedule are subject to change by January 1 of
every year.
• The terms of this contract will remain in effect for a period of one year from
the date of this proposal.
SACarteretTroposals12009.074 Carteret Road Program 3- 31.09.doc
CJ
Mayor Reiman
Borough of Carteret
Re: Carteret Road Program
April 9, 2009
Page 5
Proposal No. 2009 -074
Should you accept our fee estimate, kindly provide a purchase order or professional
services Resolution authorizing same. 11-�
GRV / /BM:dd
cc: John DuPont, PE, PP, CME
SACarteretTroposals12009 -074 Carteret Road Program 3- 31- 09.doe
CJ
4/3/2009
CARTERET ROAD PROGRAM Page 1 of 1
PRELIMINARY CONSTRUCTION COST ESTIMATE
1
Maintenance and Protection of Traffic
1
LS
$10,000.00
$10,000.00
2
Remove existing curb or curb and gutter
19,600
LF
$1.00
$19,600.00
3
Remove existing walks and aprons
13,100
SF
$1.00
$13,100.00
4
Concrete Curb and Gutter
19,600
LF
$18.00
$352,800.00
5
Concrete sidewalks, 4" thick
1,900
SF
$5.00
$9,500.00
6
Driveway Aprons, 6" thick w/ reinforcement
11,220
SF
$6.50
$72,930.00
7
Detectable Warning Surface
900
SF
$25.00
$22,500.00
8
Roadway Excavation
11,000
CY
$15.00
$165,000.00
9
DGA Base Course, 6" thick
5,000
CY
$25.00
$125,000.00
10
HMA Base Course, Mix 1-2,5" thick
8,750
TN
$80.00
$700,000;00
11
HMA Surface Course, Mix 1 -5, 2" thick
3,350
TN
$80.00
$268,000.00
12
Drainage Allowance*
1
LS
$50,000.00
$50,000.00
13
Sanitary Allowance **
1
LS
$50,000.00
$50,000.00
RAW CONSTRUCTION
COST:
$1,858,430.00
6% CONSTRUCTION CONTINGENCIES:
$92,921.50
TOTAL:
$1,951,361.50
*Storm sewer allowanace for roof leader extension, upgrading inlet castings,
miscellaneous storm repairs to be determined upon review of closed circuit TV Inspection
"Sanitary sewer allowance for miscellaneous sanitary reapirs to be
determined upon review of closed circuit TV Inspection
SAY: $1,950,000.00
Roads Included In the above: Whitman St., Charlotte St., Sunset Ct., Tennyson St., Patrick St.,
Holmes St., Longview Tr., & Lexington Ave.
Total linear feet of roadway = 9,785 feet
Approximate Area of Roadway Reconstruction = 30,450 SY
SACarteret\esttmates0009 -074 Carteret Road Program 3 -31 -09
418QO09
2009 -074 Wamt Road program
Buda.l TOW S
.. Ral. Coo) to Grtero1100e
nn xaa
f
and B.,..p Pbaa. SeMtte
100.01
SeBp Fbtl WoA
Pertain tktl Wak 6dayv
D OOnRO W hlor Ndei
n M1RDra ak
6 a
h Basw Map
IXaM1 ..O M.rtup
Proparo Ol9bate
PE Rriex
PIMPa TOai
Dad9npm..SoM .
Moll
P., 10 J:an.;
nmare RFPr«rvbPw�E.n a w.am<amreP
Revbw 9uoka W1 N Napecnon d wvemenl dxea
ReYew Nbda0e
ReNew PoVarenl CwreP
rleav :a
CooNnaU wN I U Cayanb.
Maryre video, br aromaand ks Cof E raWa.d
Prepare Pre ouW COSTatireb
Rep M b Dwo yM1 repaedvg wtpre hgrovemenb
preDaro aoM ae .Oob
pro0b pre
4afficmnbdplana
ab q kpov.nRnt. d.
Panaary0r91oreow E R e .
PE erbw
Plus. TOMI
Bennett Matlack Project Report
Page t or R
78,000 GV TT
OB
O OR OR
BM Imp Rob DO DE GRIN
IM IOf
1%
1. Ni a0!
xl9 EW xaa Ira PIP Cott
C.M1
ConOV[Ga
tW PFba4w /n'xl
SR.'. CwaFrcb iLNtm /Mh V.
•E11
YEng
Eaae Wm Ct4E tOW lleueP MAxEWnfel ErglxtlaW
IS4 a 143
s I5a s 18l
8 1U
1 IN I I
s 100 i IM s He
a ?2 a 82 a
8 IN s 91 S a3 i R s ez S et
N
000m000000m
0mO0�01✓�o0O
®�mm�
4!8/2009
2009 -074 Carteret Road Program
SWIG Td I f 76,000
!Rate C04e M C Mre12006
}eat
.... ,awlatlan e1BN 00cumenb
J0.01
Prepare
W Vor of aped .A
age raw Qe W mna0on repOaq
Pepare asomb awaecei
Prepare 0M1Bi0n2te?xe
Prepare mnsVwAOn mat a aCnuro
Prepare seEeon C
Prepare ONSai
flake ietlolpbm
PE T n O tal
Fla.. TIaI
BW Pfase 8eMCee
690.01
f fAMaQtl2(IIMOko wbu
aa edreioaeneM lIXDH
Prepare W Olposmar+a 011tlere
Prepare iwmury d 0tl0cre Juei
AtleMOH Opentrg
Prepare bbHEm C10U>
Pepare leoa ntlM . b
Prep awW
Realm8N
are0o0molawar0
RevkwmnVacb
Prepare meoa b procee0
PM1asa TOW
Bennett Matlack Project Report
Page 2 of 2
OY Tf 08 a OR OR BM Imp RW 00 OE BRa1
1% IOf IN Ib M i0a Ele NO 1. 111 "1 CoN
CM1W
CwMfia luq P.ohaabn RvJH- i0.ha19n Cw0u,8a fYtfCTV Mmh Y.C/LO
Vu i T2 1pti
IM i 143 $ 11) $ 1 nE11 Eamp a IM S 1 Fepirt11 S EpM a[ngtm� Wn.M $ 72 iwMY S 0 2 Para MI }pylgy,a eTx Fagruaa Gp OW
f 151 1a) 02 S 1M 18 102 S 02 f TZ 2 f 02
xocea
0000mo0ooa000�rnE�o
xocea