HomeMy Public PortalAboutT S CHU TE_9A (2).pdfDATE ISSUED: 06 -13 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF
9A CHU TERRACE
THOMAS DAVIS
25 - C TELFAIR PLACE
SAVANNAH GA 31415
JIMMY JENKINS JR ROOFING INC
PO BOX 30248
SAVANNAH GA 31410
P
$ 131.00
PIN #4- 0009 -04 -004
$10,800.00
PERMIT #: 130384
TOTAL BALANCE DUE: $ 131.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Jun 12 13 10:53a
Jun. 12. 201
Property Addr
JJJ ROOFING INC.
9:21AM
/3 -038
ss: I 7 3 CkL\
9128982217 p.2
No. (Lb I r. 1
City of Tybee Island, Georgia
912 -472 -5033 or 912 - 472 -5031 -Fax 912- 786 -9639
APPLICATION FOR BUiLDiiNG PERMIT
aoo9- 64-aoil
Single Fami y
❑ Duplex
❑ Multi - Family units
❑ Commercial' units
Oetaits of Project S ry
{Check all that apply)
❑ DiscoveryfTearout
❑ r:ootprint Changes —
new square feet
hea ed /cooled
ktil `-f-.1
❑ Demolition of Structure
❑ Other
-e n s i 3 i^C- , "i ‘st4 l e r, ? L4...e. r
)i \rip
Estimated Cost 2f Construction: $ 101 41")-- v (materials + labor + profit/overhead)
if applicable, a Bach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: 1 ; Z Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings order than 50 years may be eligible to be listed on the Stele /National Register With This designation, you
may be eligible b fake advantage of various tax incentive programs while preserving the heritage of Tybee Island.
' Also see the Tybee island Land Development Cods Article 14: Historic Preservation
During construction:
On -site restroorr facilities will be provided through Dui:, t r . Construction debris will be disposed
by .: � � T 94) by means of . I understand that I must comply with zoning, flood
daanage cdnlroljuilding, fire. shore protection and wetland ordinances. FEMA regulations and all applicable codes and
regulations. 1 reE line that l must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: C.- 1 ) -13- Signature of Applicant:!
Printed Name
Note: A permit n rmally takes 7 to 10 days to process
Approvals:
Planning & Zontr g Manager
Building Official
Water/Sewer
Storm1Drainage
City Manager
Signature Date
FEES
Permit
Inspections
Gap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
•
Mailin, Address
Tele. hone
OWr r
(i 1orv,cv, 7tv,.; , 5
ct
(_,;,--r, t a. e
4D;..
3 ► l t o
Home:
Cell: L i C - L3y
Architect or
En ' ineer
[
Contractor
IIJir•r.r•.,--) r.114, e, 5
'.G t
L.:A 3D
`i b' —
3i`i I
Office: 3ss Y
- s'Z�_
Cell: 6 s5'- it,' 2_
Single Fami y
❑ Duplex
❑ Multi - Family units
❑ Commercial' units
Oetaits of Project S ry
{Check all that apply)
❑ DiscoveryfTearout
❑ r:ootprint Changes —
new square feet
hea ed /cooled
ktil `-f-.1
❑ Demolition of Structure
❑ Other
-e n s i 3 i^C- , "i ‘st4 l e r, ? L4...e. r
)i \rip
Estimated Cost 2f Construction: $ 101 41")-- v (materials + labor + profit/overhead)
if applicable, a Bach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: 1 ; Z Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings order than 50 years may be eligible to be listed on the Stele /National Register With This designation, you
may be eligible b fake advantage of various tax incentive programs while preserving the heritage of Tybee Island.
' Also see the Tybee island Land Development Cods Article 14: Historic Preservation
During construction:
On -site restroorr facilities will be provided through Dui:, t r . Construction debris will be disposed
by .: � � T 94) by means of . I understand that I must comply with zoning, flood
daanage cdnlroljuilding, fire. shore protection and wetland ordinances. FEMA regulations and all applicable codes and
regulations. 1 reE line that l must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: C.- 1 ) -13- Signature of Applicant:!
Printed Name
Note: A permit n rmally takes 7 to 10 days to process
Approvals:
Planning & Zontr g Manager
Building Official
Water/Sewer
Storm1Drainage
City Manager
Signature Date
FEES
Permit
Inspections
Gap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Jun 12 13 10:54a JJJ ROOFING INC.
Jun. 12. 2013 9:21AtM
9128982217 p.3
r�o. ii i r. t
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1976 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: invortant Lead Hazard information for Families, Child Care Providers and Schools.
Contractors m asl document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asb :stns Program (404) 363 -7026.
Protects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 `t2 of exterior surfaces AND all window replacements and partial demolitions of any size.
***********P****.****
AsbestoslEnvirormental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigrased hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior, to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
.Encapsulation or Demolition" farm in accordance with the Georgia Asbestos Rules_ The Georgia
Environmental Protection Division administers the rules. In moat cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition not fication from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures anti led Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
BMPs
While BMP de iciencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common MIN; Co - Construction Exit and Sd1 -
Sediment Barr er. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http-1 /www.gaslnrcc. orgldoc sit ield_manual_44ed. pdf.
Problems with 'the Co is not limited to the installation, but to material. The stone will be a representation of
1.5'.3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
(- 13- l2.
Sig re for. cei of Lead Paint, Asbestos, and BMP notices. Date
nted Nam
Printed
Jun 12 13 10:53a JJJ ROOFING INC.
P09 3( 248
SAVAr' NAN, GEORGIA 3141❑
912-3564526
912 -894 -2217 (Fax)
jjlroof)lccomcast.net
Fax
To:
Fa=c
1 ze_ �51d�2
-'�� �5
9128982217
p.1
Jimmy Jenkins Jr.
Roofing Inc.
From: T
Pages: '3
Phone : c '3
Re: 4 S (- LA
❑ Urg Olt 2 For Reveew ❑
Date: c, _ _ 1 3
c-.
cc:
lease Comment ❑ Please Reply ❑ Please Recycle
• Con. ments:
¶C.i (cok
Pe
1 ; ewTh ;,-,
ct _ - (.j(02
`-1" a V 1
Chatham County Board of Ass' 'sors: 2013 Property Record Card 4 -000° 04 -004 Page 1 of 2
2013 Chatham County Board of Assessors 4- 0009 -04 -004
Property Record Card
9 T S CHU TER TYBEE ISLAND
(APPRAISER jlmarine
LAST INSP 06/08/2007
APPR ZONE 000008
W PT OF 5 RESUB OF 105 TYBEE 60 X 70
JUNG MARLENE DORIS CAMA ASMT
PO BOX 658 168,000 168,000 LAND 1
SIMSBURY CT 06070 127,600 127,600 BLDG 1
117,300 17,300 OBXF 5
1312,900 312,900 Cost - MS
SALES BOOK / INS VI QU RSN PRICE
PAGE
109 Aug 214N 0559 WD 1 Q
,2000
GRANTOR:SESS /ONS SHIRLEY
GRANTEE:JUNG MARLENE D
23 Sep 1971 0340 NA I U UG
11998
GRANTOR:SPROUL ROBERT ET AL
GRANTEE: SESSIONS SHIRLEY
121 Oct 169U 0580 WD I Q
1994
GRANTOR:AKINS EUEL & DORIS
GRANTEE:SPROUL ROBERT ET AL
01 Dec
1986
GRANTOR:
GRANTEE:
230,000
120,000
I U U5 62,000
COMMENTS:
28 Jun 2005 ADD CHG PER NOTE 06/28/05
JLM
02 Nov 2004 ADD CHG PER POCARD
11/02/04 JM
11 Dec 2000 TY01 HS10 REMVD NJV 12 -11-
00
15 Aug 2000 FOR SALE 07/14/00 $239,900
28 Oct 1998 ADD CHG 10 -28 -98 DH PER
OWNER
12 Aug 1998 ADD CHG 8 -12 -98 DH PER
OWNER
13 Mar 1998 FOR SALE 3/6/98 $249,000
15 Dec 1994 *SANDRA JEAN CARROLL &
SHIRLEY SESSIONS TY95
169U580.
[Click for larger picture]
-a -IS
AChatham County
Tax Commissioner
r+ Pr_rpzrtt; la, Star -r * in
(CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 020213.00 T213 TYBEE BTL
BEACH
EXEMPTIONS
HISTORY LAND IMPR TOTAL
2012 168,000 102,000 270,000 Cama
2011 168,000 97,900 265,900 Cama
2010 354,900 102,000 456,900 Cama
2009 355,000 103,000 458,000 Over
2008 580,000 61,000 641,000 Over
2007 580,000 61,000 641,000 Over
2006 641,000 A/C
2005 246,000 82,500 328,500 Cama
2004 209,500 88,000 297,500 Cama
2003 209,500 88,500 298,000 Cama
2002 155,000 88,500 243,500 Cama
2001 160,000 81,000 241,000 Cama
2000 241,000 A/C
1999 66,500 81,000 147,500 Cama
1998 158,000 NC
1997 66,500 107,000 173,500 Cama
1996 24,150 81,030 105,180 Cama
1995 24,150 85,500 109,650 Cama
1994 24,150 64,790 88,940 Cama
1993 24,150 42,660 66,810 Over
1992 24,150 42,660 66,810 Over
EXTRA FEATURES
ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
140325 86319 AV CPT FLAT /SHED RF 0 0 456.00 A 8.43 3,844 1985 1985 IR 2,652 2,700
140326 86319 Solid Wall /Slab AV 0 0 160.00 A 25.48 4,077 1985 1985 IR 2,813 2,800
140327 86319 KNEE WALL /GLS /STPS 0 0 448.00 A 31.82 14,255 1985 1985 IR 9,836 9,800
140328 86319 Slabw /walls Under 0 0 208.00 A 12.49 2,598 1985 1985 IR 1,793 1,800
140329 86319 SLAB /STEP AV 0 0 30.00 A 11.24 337 1985 1985 IR 233 200
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
110852 SINGLE FAMILY RES 60 70 4,200.00 -SF 40.00 C1 168000
3 _-0 3 go /, o o v Qom- /a eiliI/ 44,
http: // boa. chathamcounty. org/ DesktopModules/ ChathamCountyBoardofAssessors /Prope... 06/12/2013
Chatham County Board of As ssors: 2013 Property Record Card 4- 00'"-04 -004 Page 2 of 2
2013 Chatham County Board of Assessors 4- 0009 -04 -004
Property Record Card
9 T S CHU TER TYBEE ISLAND
BUILDING SECTION !CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
86319 -1 -2013 Residential 127,556 1932 1985 MS 31.00 0.00 0.00 0.00 31.00 88,014 127,600
8' 24' 8'
2- 6 II�3WP 20
Sand Wall Forth
lattP
Mee Wall Por .b
sm
Knee
Open ab
15
12'
• 100
Ifae Lb lag Am
1248
24
CPT
Carport
■464
Flax I.ivieg Area
2 '
S UNDA
w/Walls un er
ee ▪ Wall Po h
208
5' 3'
c sS
Slab iv/Steps
15
[Click for larger picture]
10 -98 AFTER BOE VISITED AND REMEASURETHE HOUSE
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
1704
1 - Single - family Residence
1 - Stud Frame
2 - Two Story
3.00
3.00
0
/ 3.00
COMPONENTS Units % QUAL
R1 108 Frame, Siding, Wood 100.00
R2 208 Composition Shingle 100.00
R3 352 Heat Pump 100.00
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #) 13.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 622 Raised Subfloor (% or SF) 100.00
R11 904 Slab Porch (SF) with Roof 80.00
http:/ /boa. chathamcounty.org/DesktopModule s /ChathamC ounty/B oardofAssessors/Prope... 06/12/2013