HomeMy Public PortalAboutPRR 17-2500TOWN OF GULF STREAM
PALM BEACH COUNTY, FLORIDA
Delivered in person
February 10, 2017
Wayne Quin
Re: GS #2500 (Copy of Police Report on 2/9/17)
I would like a copy of the Police Report on 219117 regarding 10 Driftwood Landing in Gulf
Stream, FL.
Dear Mr. Quin:
The Town of Gulf Stream has received your public records requests dated February 10, 2017.
The Town has provided you with the Police Report you requested. We consider this request
closed.
Sincerely, "
R41d R"44,
As requested by Rita Taylor
Town Clerk, Custodian of the Records
Page I of 2
Incident Type:
Location of Incident:
Type of Premises:
Time of Call:
Time of Arrival:
Time Completed:
Officer Injured:
Date/Time Reported:
Occurred From:
Domestic:
Juvenile Involved:
Reporting Officer:
Name:
Race:
Home Address
Name
Race:
Date of Birth:
Juvenile:
Occupation:
Home Address:
Business Address
Business Name:
Gulf Stream Police Department
246 Sea Road
Gulf Stream, FL 33483
Phone: (561)278-8611 Fax: (561)276-2528
Complaint Number: 17-0288
NON CRIMINAL OFFENSE REPORT
TOWN ORDINANCE VIOLATION
10 DRIFTWOOD LANDING RD.
GULF STREAM FL 33483
CONSTRUCTION SITE
1739
1745
1822
NO
02/09/2017 17:32
NO
NO
OFC. RAMON BATISTA
WAYNE QUINN
WHITE
12 DRIFTWOOD LANDING
GULF STREAM FL 33483
LAMONT GILBERT
BLACK
10/12/1976
NO
FOREMAN
1326 NW 9 TERR.
FT. LAUDERDALE FL33311
1600 SW 13TH CT.
POMPANO BEACH FL33069
DLS PRESTRESSED INC.
Zone: 3
Processed By: OFC. R. BATISTA
Other Units Notified: OFC. C. FAHEY, OFC. M. FELTER
Officer Killed/Assaulted: NO
COMPLAINANT
Sex: MALE
Home Phone: (561) 276-0773
VIOLATOR
Sex: MALE
Employed: YES
Cell Phone: (954) 695-4789
Business Phone: (954) 933-9232
INCIDENT SUMMARY
ON 02/09/17 AT 1739 HOURS OFC. M. FELTER AND I RESPONDED TO 10 DRIFTWOOD LANDING REFERENCE A
NOISE COMPLAINT RELATED TO THE ONGOING CONSTRUCTION AT THAT ADDRESS. THE COMPLAINANT,
WAYNE QUINN, HAD REPORTED THAT THE CONSTRUCTION WORK WAS TAKING PLACE AFTER 1700 HOURS
WHICH IS A VIOLATION OF THE TOWN ORDINANCE WHICH ONLY ALLOWS WORK TO BE PERFORMED UNTIL
1700 HOURS.
UPON ARRIVALAT 1645 HOURS I MET WITH THE SITE FOREMAN, LAMONT GILBERT, AND ADVISED HIM OF
THE VIOLATION. GILBERT WAS COOPERATIVE AND EXPLAINED THAT HE AND HIS CREW WERE NOT AWARE
Page 2 of 2 Complamt Number. 1'/-U288
OF THE TIME LIMITATION PER THE TOWN ORDINANCE, BUT THAT THEY WOULD IMMEDIATELY BEGIN THE
PROCESS OF SHUTTING DOWN THE DRILLING MACHINE AND THE OTHER MACHINERY. GILBERT GAVE HIS
CREW INSTRUCTIONS TO BEGAN THAT PROCESS AND THEY DID SO IMMEDIATELY. GILBERT EXPLAINED
THAT IT WOULD TAKE APPROXIMATELY 10-15 MINUTES TO BE ABLE TO PROPERLY SHUT DOWN THE
MACHINERY WHICH INCLUDED REVERSING THE DIRECTION OF THE DRILLING TO TAKE THE DRILL OUT OF
THE HOLE IT WAS DRILLING INTO THE FOUNDATION OF THE PROPERTY. GILBERT ADDITIONALLY ADVISED
THAT HIS CREW WOULD BE HOSING DOWN THE STREET ALONG WITH THE CEMENT TRUCKS AND OTHER
VEHICLES THAT WOULD BE LEAVING THE SITE AS THEY LEFT FOR THE DAY. THE REASON FOR DOING THIS
WAS SO THAT THE ROADWAY AREA FROM THE FRONT OF THE SITE TO THE ENTRANCE/EXIT OF THE
DRIFTWOOD LANDING NEIGHBORHOOD WOULD NOT BE LEFT COVERED WITH CONSTRUCTION DEBRIS
THAT WOULD FALL OFF THE VEHICLES AS THEY DROVE AWAY. THE DRILLING WAS STOPPED IN
APPROXIMATELY 10 MINUTES AS SOON AS THE DRILL HAD BEEN REVERSED OUT OF THE HOLE IN THE
GROUND. THE CREW THEN CONTINUED WITH THE CLEANUP PROCESS DESCRIBED ABOVE. I ADVISED
GILBERT THAT IN THE FUTURE THE SHUTTING DOWN AND CLEANING PROCESS WOULD HAVE TO BEGIN
EARLY ENOUGH SO THAT ALL WORK WAS COMPLETED PRIOR TO 1700 HOURS AS PER THE TOWN
ORDINANCE. GILBERT AGREED TO COMPLY WITH THE ORDINANCE IN THE FUTURE. GILBERT SAID THAT HIS
COMPANIES WORK AT THIS SITE WAS COMPLETED TODAY SO THEY WOULD ONLY BE RETURNING ON
02/10/2017 TO REMOVE THEIR MACHINERY FROM THE SITE.
QUINN MET WITH US ON THE STREET AS GILBERT AND HIS CREW CONTINUED THE CLEANUP PROCESS. WE
EXPLAINED WHAT WAS OCCURRING AND THAT THIS MATTER WOULD BE REVIEWED ON 02/10/17 BY TOWN
HALL TO DETERMINE APPROPRIATE SANCTION(S) REFERENCE THIS VIOLATION.
OFC. C. FAHEY, WHO WAS NOT AT THE SCENE, ADVISED ME THAT HE CHECKED THE SITE ON 02/09/17 AT
1650 HOURS AND THAT AT THAT TIME IT APPEARED AS IF THE CREW WAS PREPARING TO END THEIR WORK
DAY BY 1700 HOURS. GILBERT AND HIS CREW LEFT THE SITE AT APPROXIMATELY 1825 HOURS.
+Qou Gulf Stream Police Department
® 246 Sea Road
Gulf Stream, FL 33483
Phone: (561) 278-8611 Fax: (561) 276-2528
Page 1 of 1
SUPPLEMENTAL OFFENSE REPORT
Incident/Reclassification: TOWN ORDINANCE VIOLATION
Report Status: ACTIVE Report Date/Time:
Reporting Officer: OFC. RANDALL WILSON
Zone: 3 Division:
INCIDENT SUMMARY
Complaint Number: 17-0288
02/10/2017 10:30
PATROL
ON THE ABOVE DATE AND TIME I FOLLOWED UP ON A TOWN ORDINANCE VIOLATION THAT HAD
OCCURRED THE DAY BEFORE. THE VIOLATION WAS A CREW WORKING PAST THE 5:OOPM STOP TIME FOR
ALL CONSTRUCTION WORK IN THE TOWN OF GULF STREAM. I CALLED THE PROJECT MANAGER, ROBERT
MCDONALD, WHO IS ON TOWN DOCUMENTS STATNG HE IS THE RESPONSIBLE PARTY FOR THIS
WORKSITE. MR. MCDONALD TOLD ME ON THE PHONE THAT HE IS NO LONGER THE PROJECT MANAGER
FOR THAT JOB AND THAT, BRAD NORMAN HAS TAKEN OVER THE PROJECT MANAGERS JOB FOR THE
WORKSITE AT 10 DRIFTWOOD LANDING. MR NORMAN WAS PRESENT DURING THIS PHONE CALL AND
ACKNOWLEDGED SUCH. HE AGREED TO MEET ME AT THE JOBSITE AT 1030 HRS THIS DATE SO I COULD
EXPLAIN THE VIOLATION TO HIM AND ISSUE HIM A TOWN ORDINANCE VIOLATION WARNING. HE
AGREED AND THE MEETING WENT AS SCHEDULED. THE CITATIONIWARNING WAS ISSUED. ALL FUTURE
CITATIONS WILL FOLLOW THE PREDETERMINED FINE SCHEDULE. BOTH MR MCDONALD AND MR
NORMAN WERE ADVISED TO TAKE THE CORRECTIVE MEASURES TO HAVE MR NORMAN LISTED ON
BUILDING DOCUMENTS AS THE PROJECT MANAGER NO FURTHER ACTION AT THIS TIME.