Loading...
HomeMy Public PortalAbout11-0126 The Savannah BankDATE ISSUED: 03 -9 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL BANNER FOR 30 DAYS 802 FIRST ST A THE SAVANNAH BANK NA PO BOX 188 SAVANNAH GA 31402 912 - 629 -6500 THE SAVANNAH BANK NA PO BOX 188 SAVANNAH GA 31402 P $ 15.00 $ 1.00 PERMIT #: 110126 TOTAL BALANCE DUE: $ 15.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 11-012c0 Location: boa. \t S-. NAME ADDRESS PIN #_ TELEPHONE Owner 11,1Somawv\ yAOA \SI sT• "1t7 -'(/1 - (0611 1 Architect or Engineer Building I Contractor (Check all that apply) L.J Repair Renovation Minor Addition —1 Substantial Addition Li Other Details of Project: Residential Single Family Duplex Multi- Family X Commercial Footprint Changes Discovery Demolition \()0(n \O ann ex On (0 0 6;1116(1 Estimated Cost of Construction: $ ruction Type (1) \. ood Frame (2) ood & Ma onry (3) B ; ck Vene Propos L s use: Remarks (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH OPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following in .'illation based on the construction drawings and site plan: # Units Lot Area Living space (total sq. ft.) # Off- strIet parkin spaces Trees located & lister on site plan Access: Drive ay (ft. With culvert? With swale? Setba s: Front Rear Sides (L) (R) Sto 'es Height Vertical distance measured from the average adjacent grad of the building to the extre`' e high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditio ' ig units, elevators, and similar appurtances. # Bedrooms # Bathrooms During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 3 ' t - D.O\ Signature of Applicant: IL5O-(1- 409c Note: A permit noiinally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage NFIP Flood Zone Existing Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL