Loading...
HomeMy Public PortalAbout11-0148 NavonPermit No. Owner's Name City of bee Island • Community Develc lent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 A ()V Gen. Contractor Contact Information 4AJ7- Project Address Scope of Work Inspector Inspection 11116% Emma INTERNATIONAL CODE COUNCIL / MEMBER Date Requested Date Needed / --/ Subcontractor / • —774 7 / Date of Inspection Pass El Fail Fee Inspection Pass Fail El Fee Inspection Pass El Fail Fee Inspection Pass Fail 0 Fee CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 03 -17 -2011 PERMIT #: 110148 WORK DESCRIPTION WORK LOCATION INSTALL SIGN 23 TYBRISA OWNER NAME RONEN NAVON ADDRESS PO BOX 2812 CITY, ST, ZIP TYBEE ISLAND GA 31328 -2812 PHONE NUMBER CONTRACTOR NAME DOUG BEAN SIGNS INC ADDRESS 1600 DEAN FOREST RD CITY STATE ZIP SAVANNAH GA 31408 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 105.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $4,000.00 TOTAL BALANCE DUE: $ 105.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: ! i 1 - NAME Land lc, Owner PIN # C --o 1 r 13 Architect or Fn ineer Building U Contractor C hS (Check all that apply) �( Repair ❑ Renovation O Minor Addition ❑ Substantial.Addition iSt] Other jV.1. Details of Project: y ADDRESS TELEPHONE ❑ Residential (] Single Family ❑ Duplex ❑ Multi Family ❑ Commercial � �1 u,ift±ea- Olin. Ltftt6 ACRaaway ❑ Footprint Changes �] Discovery Q Demolition Estimated Cost of Construction: S Construction Type V (Enter appropriate number) (1) Wood Frame (4) Masonry (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer, /�' at Proposed use: j,(.) l• a (Si ,t. Remarks: Other (please specify) ATTACK A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area Off-street parking spaces Trees located & listed on site plan Access: Driveway (ft) Setbacks: Front # Bedrooms _ Living space (total sq. ft) # Bathrooms With culvert? _ With Swale? Rear _ Sides (L) (R) if Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation duets. air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning floed damage control, building, fire,, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: . f/57// Signature of Applicant: PT-aea /` Note: A permit normally takes 7 to 10 days to process, /f lit- - The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New is it in compliance with City map? If not, has street name and /or number been reported to MPC? NFIP Flood Zone FEMA Certification attached State Energy Code Affidavit attached Existing _. Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES Permit inspections Water Tap Sewer Stub Aid to Const. Wet 0.. . 3e2 • TOTAL 105- APP, -09 -2006 14:39 CITY OF TWEE I SL . hermit Acknowledeetnent toslLn iti Na st , to C:egt JP_D for _kig w gar R The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (3 0) day "Project Notification for Asbestos Renovation Encapssrlatk+n or Demolition' form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Acaredi e d Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone members are provided by the brochures entitled Asbestos & Renovation and Asbestos and ,Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Ofioe use Only: Project Address: Permit Number: Date TOTAL P.O t a€ vI V_'iw roil Co 1. ONVIOLIANt6L. itO code vici: s12 ?'; _ -1' oversight by the reviewer shell e' -,.;',)nst-tuis.gi . hu£hor qty to violate, cam°,, s, ci..;i or set aaide any applicable :.rn, :,;.�. or ordinances he review and permit ashou ii net be construed as a warranty or guarantee, Rclgewed By 7014 Date_ia II All Electrical installations must comply with The Nztionai Electric Code 2.arR, Editlor and Sate of Georgia Amendment eje All crns;truction ..gust ctmply with the Inteh atlonal wilding Code_f. . ladltIon and State of ''eorgli Building Amendments 44,04104 - kad 237-X1%65A. fl -t.E F l`Gf�.cJ' I 0[!1 Q xltirl► 1 6al1 wft [ i SAGIS Viewer Printed :Mar 15, 2011 INCORPORATED Re: Date ‘,7/ 1677:a_ "t Price quote Please respond — JUST THE \frIe ORM Ano{Gn- a &atiir�.i iu"(6OiAno() �f.�'rrrGhk oca.{tw. kLE we krww i esu, vutob etc. melf. 4Cure 6(.3 vok Bean SignyInc1600 Dean F st Rd Savannah, GA. 31408