HomeMy Public PortalAbout11-0148 NavonPermit No.
Owner's Name
City of bee Island • Community Develc lent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
A ()V
Gen. Contractor
Contact Information 4AJ7-
Project Address
Scope of Work
Inspector
Inspection
11116%
Emma
INTERNATIONAL
CODE COUNCIL
/ MEMBER
Date Requested
Date Needed
/ --/
Subcontractor
/ •
—774
7 /
Date of Inspection
Pass El Fail Fee
Inspection Pass Fail El Fee
Inspection Pass El Fail Fee
Inspection Pass Fail 0 Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -17 -2011 PERMIT #: 110148
WORK DESCRIPTION
WORK LOCATION
INSTALL SIGN
23 TYBRISA
OWNER NAME RONEN NAVON
ADDRESS PO BOX 2812
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2812
PHONE NUMBER
CONTRACTOR NAME DOUG BEAN SIGNS INC
ADDRESS 1600 DEAN FOREST RD
CITY STATE ZIP SAVANNAH GA 31408
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 105.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $4,000.00
TOTAL BALANCE DUE: $ 105.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: ! i 1 -
NAME
Land lc,
Owner
PIN # C --o 1 r 13
Architect
or Fn ineer
Building
U
Contractor C hS
(Check all that apply)
�( Repair
❑ Renovation
O Minor Addition
❑ Substantial.Addition
iSt] Other jV.1.
Details of Project: y
ADDRESS
TELEPHONE
❑ Residential
(] Single Family
❑ Duplex
❑ Multi Family
❑ Commercial
� �1 u,ift±ea- Olin. Ltftt6 ACRaaway
❑ Footprint Changes
�] Discovery
Q Demolition
Estimated Cost of Construction: S
Construction Type V (Enter appropriate number)
(1) Wood Frame (4) Masonry
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer, /�' at Proposed use: j,(.) l• a (Si ,t.
Remarks:
Other (please specify)
ATTACK A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft)
Setbacks: Front
# Bedrooms _
Living space (total sq. ft)
# Bathrooms
With culvert? _ With Swale?
Rear _ Sides (L) (R)
if Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation duets. air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning floed damage control, building, fire,, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: . f/57// Signature of Applicant: PT-aea
/`
Note: A permit normally takes 7 to 10 days to process, /f lit- -
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
FEMA Certification attached
State Energy Code Affidavit attached
Existing _.
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
inspections
Water Tap
Sewer Stub
Aid to Const.
Wet 0.. . 3e2 •
TOTAL 105-
APP, -09 -2006 14:39 CITY OF TWEE I SL .
hermit Acknowledeetnent
toslLn iti Na st , to C:egt JP_D for
_kig w gar R
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (3 0) day "Project
Notification for Asbestos Renovation Encapssrlatk+n or Demolition' form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Acaredi e d Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
members are provided by the brochures entitled Asbestos & Renovation and Asbestos and
,Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Ofioe use Only:
Project Address:
Permit Number:
Date
TOTAL P.O
t a€ vI V_'iw roil Co 1. ONVIOLIANt6L. itO
code vici: s12 ?'; _ -1' oversight by the
reviewer shell e' -,.;',)nst-tuis.gi . hu£hor qty
to violate, cam°,, s, ci..;i or set aaide
any applicable :.rn, :,;.�. or ordinances he
review and permit ashou ii net be construed
as a warranty or guarantee,
Rclgewed By 7014 Date_ia
II
All Electrical installations must
comply with The Nztionai Electric
Code 2.arR, Editlor and Sate
of Georgia Amendment eje
All crns;truction ..gust ctmply with
the Inteh atlonal wilding Code_f. .
ladltIon and State of ''eorgli Building
Amendments
44,04104 -
kad
237-X1%65A.
fl -t.E F l`Gf�.cJ'
I 0[!1 Q xltirl► 1 6al1 wft [ i
SAGIS Viewer
Printed :Mar 15, 2011
INCORPORATED
Re:
Date
‘,7/ 1677:a_
"t Price quote Please respond —
JUST THE
\frIe ORM Ano{Gn- a &atiir�.i
iu"(6OiAno() �f.�'rrrGhk oca.{tw.
kLE we krww i esu, vutob etc.
melf. 4Cure 6(.3 vok
Bean SignyInc1600 Dean F st Rd Savannah, GA. 31408