Loading...
HomeMy Public PortalAboutTWELFTH ST_202.pdfMAYOR Jason Buelterman CITY COUNCIL Wanda Doyle, Mayor Pro Tem Barry Brown Rob Callahan Bill Garbett Monty Parks Paul Wolff June 6, 2014 CITY OF TYBEE ISLAND Ms. Kimberly Doyle Doyle Landscape Design & Management PO Box 1035 Tybee Island, GA 31328 SUBJECT: paver walkway permit — 202 Twelfth St., Eddie Dean Dear Kimberly, CITY MANAGER Diane Schleicher CITY CLERK Janet LeViner CITY ATTORNEY Edward M. Hughes Enclosed are records related to permit 13 -0483 which was issued last year for work at 202 Twelfth Street. The permit fee was $59 and a payment of $50 was processed on 08/01/2013. The cashier's records show a credit card was used for the $50 payment. There is a remaining balance of $9. This may be due to a keying error that occurred during the credit card transaction. Please remit $9 along with the enclosed invoice within the next 15 days. Sincerely, Dianne Otto Planning & Zoning Manager Enclosures: $9 invoice; project history 13 -0483 P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (866) 786 -4573 — FAX (866) 786 -5737 www.cityoftybee.org DATE ISSUED: 08 -1 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # • CITY OF TYBEE ISLAND BUILDING PERMIT PAVER WALKWAY 202 TWELFTH ST EDDIE DEAN 124 SHORE RD SAVANNAH GA 31419 912 - 235 -3705 DOYLE LANDSCAPE DESIGN & MGMT PO BOX 2764 TYBEE ISLAND GA 31328 P $ 59.00 PROJECT VALUATION $2,800.00 PERMIT #: 130483 TOTAL BALANCE DUE: $ 9.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org ,Q Project Management - (View) File Edit Options Functions Help I r l t? I Isl. CI Project # Property 130483 202 Next Project # I TWELFTH ST IGI Description Issued to PAVER WALKWAY [DEAN. EDDIE General 1 Segments Financial 1 Property Info 1 Information ! Comments History I Footprint i Conditions Description Pending Activity Drag a column Filter N. Bo 6 1; 0.00 Balance [ 9.00 header here to Group by that. column .- :, Receipt Date Packet Type Reference Debits Credits Balance 08/27/2013 00000 MEM Closed by: jbryant 9.00 08/01/2013 02397 PAY 130483 50.00 9.00 384110 08/01/2013 00000 0 Original Calculation 59.00 59.00 a , e_ v■ .11- 7 -e r- a a S I-k : ,e., r" l Edit This Record C] Clear 1 View 1 dotto 1 DATE ISSUED: 08 -1 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT PAVER WALKWAY 202 TWELFTH ST EDDIE DEAN 124 SHORE RD SAVANNAH GA 31419 912 - 235 -3705 DOYLE LANDSCAPE DESIGN & MGMT PO BOX 2764 TYBEE ISLAND GA 31328 P $ 59.00 PIN #4- 0006 -20 -014 $2,800.00 PERMIT #: 130483 TOTAL BALANCE DUE: $ 59.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: ./I .1, (0-13 ii4e VISi�, Work Co, ft4, Q woutecia.ys, ft-) • /e. /vt r ViOc.'f e¢ c.1 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org " G��t_vl 2pC'J j OJd, (11 S -ialbC o) l/ IQ< ��-vJff��.1r )4,o .na lb G��'B\  j G 717 GTE} Qa� d ��,�� ��' �� t I -I- a .T :1 0 loop o 0 44) Pa Q ���% -6) i City of Tybee Island, Georgia 912 - 472 -5030 • Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: /92 PIN: 4"' 0000 -- v.70 - /it- [Single Family ❑ Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: CNi Cire /-C y!/Gf s re/7n ✓� SU ✓C'. -s )// a c)Je I ;A mira:-) GQ S a ahle J eyl /Va-1, c)Ji(r e 06L %S Estimated Cost of Construction: $ gOO (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through . Construction debris will be disposed by by means of . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage im aired by this permitted construction. "--p avc.r W giI, $..aa.t s" Date: 17" Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: - Signatu Date Planning & Zoning Manager,.,,, kj_3 j.. (3 Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name, Mailing Address Telephone Owner d ' l 5 Dear-) Home: Architect or Engineer Office: Cell: Contractor / / b by e Gg/IdSCL/,Jf Office: 1 �f Cell: 4 Sd '�� 75 [Single Family ❑ Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: CNi Cire /-C y!/Gf s re/7n ✓� SU ✓C'. -s )// a c)Je I ;A mira:-) GQ S a ahle J eyl /Va-1, c)Ji(r e 06L %S Estimated Cost of Construction: $ gOO (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through . Construction debris will be disposed by by means of . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage im aired by this permitted construction. "--p avc.r W giI, $..aa.t s" Date: 17" Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: - Signatu Date Planning & Zoning Manager,.,,, kj_3 j.. (3 Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http:// www. gaswcc .org /docs /field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or woo•, .,.sts, ost s acin• TIz e; C or A. Si. ature for re •, �• t of Lead i in-t,-Asbestos, and BMP notices Date Ay% ;1!5t Printed Name