OFFICE OF THE VILLAGE MANAGER LETTER TO COUNCIL
NO. 106-2023
To: Mayor Jeffrey P. Freimark and Members of the Village Council
From. Jorge M. Gonzalez, Village Manager
Date: July 7, 2023
Subject: Milling and Paving in Phase 3b of Utility Infrastructure Improvement Project
(UIIP) to Begin Monday, July 10
The purpose of this Letter to Council (LTC) is to remind you of upcoming Milling and Paving in Phase
3b of the Utility Infrastructure Improvement Project (UIIP) scheduled to start Monday, July 10 and the
communications and methods that have been implemented to inform the residents of the gated
community of this scheduled work.
The work pending for Phase 3a, 3b, and 3c of the Utility Infrastructure Improvement Project (UIIP) is the
restoration of the roadway. The contractor is scheduled to begin this work in Phase 3b, along Bal Bay
Drive, on Monday, July 10. The work will require limited access to the road throughout the entire work
period (July 10 -14), and zero vehicular access to the road during the paving period (July 12 - 14, 8:30
a.m. - 10 p.m.). During the entire work period, cars will not be permitted to park on the side of the
road. Any vehicles left overnight, and still parked on the side of the road in the morning, will be towed
to Harbour Way West.
In order to minimize interruption to any waste services, the Village contractor Waste Connections, has
made arrangements for all collections, including waste, recycling, and bulk, to take place starting at
7:00 a.m. in this area, in order to be completed before work begins each day.
We have distributed notices to each home in the work area: first in late May, and again in late June.
We have also sent out numerous notifications via email to the residents of the gated community. The
project webpage has been kept up-to-date, with links to the attached flyer, providing detailed
information, as well as alternate parking options for any residents in the impacted area. We will have
our contracted Public Information Officer, Heather Leslie, on site Monday morning, along with
members of Village staff, to provide information and answer any questions from the public, in orderto
make the process as smooth as possible.
If you have any questions or need additional information, please feel free to contact me.
BA1- HARBOUR
- V I L L A G E
Utility Infrastructure
Improvement Project (UIIP)
ROAD CLOSURE NOTICE .. Pardon our dust while we work to build a
Esetcer 80l Harbour fior you "
>� Anticipated Work Schedule
_July 10 - July 14. Work may extend into the following Monday and Tuesday if needed.
* Lane closures
This area will be closed daily from 8:30 a.m. to 6 p.m.
Monday: Tuesday_(July 10-11): Milling the existing asphalt. Vehicles will be able to enter the work
zone after the day's work is complete. Low profile vehicles should avoid driving through the area, as
damage to the vehicles is possible, until the restoration is fully completed.
Wednesday - Friday (July i2 - 14): Resurfacing the roadway. Vehicles will not be able to enter or exit
the area at all until as late as 10 p.m. each work day, to
allow for the new
asphalt to cure properly.
Access During the Work
• NO vehicles may park along the road during 1
through7/10
the entire work period.
• All vehicles must be removed before 8:30 a.m.
s 7
until after 6 p.m.
ly
• Alternate temporary parking will be provided
°tee
in the areas marked in blue on the map.
• parking/access restrictions may be extended
until 10 p.m. if the asphalt has not cured
x
''
'
properly.
• -.t
• Vehicles found parked in the street overnight
W �
will be towed and parked in the area of
LEGEND
M
' �4
Park Or
Harbour Way West, adjacent to the
landscaped
ohwo k �"
park area.0
` Restrictions
r
Work zone;
during I
.•.
• Access will be limited during this time.
paving
Alternate
W",,S Ave
• NO deliveries in the area
par
parking i
iduring
- .
• NO parking in the street
Please mote that this schedule could change due to dad weather or other unexpected conditions.
I1l1 1-1ARB()UR
V I L L A G
Utility Infrastructure
Improvement Project (UIIP)
AVISO DE CIERRE: IMPACTOS DE ESTACIONAMIENTO
Horario de Trabajo Anticipado
10 de Julio a 14 de juIio. El trabajo puede extenderse hasty el tunes y rnartes siguientes si es necesario.
* Cierres de Carriles
Esta area estara cerrada todos los dfas desde 8:30 am a 6 pm.
Lunes a Martes (10 y 11 de Julio): Fresado del asfalto existente. Los vehfculos podran ingresar a la zona de
trabajo despues que se completa el trabajo del dfa. Los vehfculos de bajo perfil deben evitar conducir
por el area, ya que es posible que se danen los vehfculos hasta que la restauracion se hays completado.
Miercoles a Viernes (12 a 14 de julio): Repavimentacidn de la calzada. Los vehfculos no podran entrar ni
salir del area hasta las 6 p.m. cads dfa de trabajo, para permitir que el nuevo asfalto se cure
correctamente. El area podria permanecer cerrada hasta las 10 p.m. si es necesario.
>> Acceso Durante el Trabajo
• NINGUN vehfculo podra estacionar a to largo de
10 dejul'
la vfa durante el perfodo de trabajo.
■ Todos los vehfculos deben retirarse antes de las
8.30 a.m. hasta despues de [as 6 p.m.
• Se proporcionara estacionamiento temporal
alternativo en las areas marcadas en azul en el
maps.
• Las restricciones de estacionamiento/acceso
raj
pueden extenderse hasta las 10 p.m. si el asfalto
no se ha curado correctamente.
• Los vehfculos que se encuentren estacionados�-
en la calle durante la noche seran remolcados y
LEGEND
estacionados en el area de Harbor Way West,
• FaSe de
i•0 trabalo
adyacente al area del paraue ajardinado.
Restricciones
Zona do trabajo;
sln a°to]o
durenta le
■ El acceso sera limitado durante este tiempo.
pavimontaci8n
Altorno
• PROHIBIDO entregas en la zona
lugar de =.
e�tat,onamia�ta ,.
• PROHIBID❑ estacionar en la calle
�n *-
T+<. O>
�Y• Key,&
• F a'' rdr
si�'`
n
o _
KPATk UT
U' _.
Collins Ave
Este horario podria cambiar debido al mal tiempo u otras condiciones inesperados.