HomeMy Public PortalAboutELEVENTH TE_1.pdfCity of Tybee Island • Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
Malars
INTERNATIONAL
CODE COUNCIL'
MEMBER
Permit No. 49-d d 5 %(a Date Requested
Owner's Name .. RFP- 1flA1 Date Needed e ef/.14/43
Gen. Contractor 4r 5,'/1Y Ari-i Subcontractor
Contact Information
/L L L, d !lJ - 1.‘ 3 /
Project Address / EL f VfA17.-1
Scope of Work 0/4e /! t% /1 62,4 IA SL`s ?, 7 ,47 F0,4;>0
Inspector '7/'
Inspection / /A /f%C....
Date of Inspection
Pass
/ /
Fail ® Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass El Fail ❑ Fee
Inspection Pass D Fail ❑ Fee
0�
DATE ISSUED: 08 -20 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R HEAT PUMP, COND, PLATFORM
1 ELEVENTH TER
ELIZABETH SHEEHAN
PO BOX 2864
TYBEE ISLAND GA 31328 -2864
MCBRIDE MECHANICAL LLC
PO BOX 61567
SAVANNAH GA 31420
P
$ 69.00
PIN #4- 0007 -02 -032
$4,700.00
PERMIT #: 130516
TOTAL BALANCE DUE: $ 69.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
1/..-00a7- - 0 3.2
CITY OF TYBEE ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
MECHANICAL PERMIT APPLICATION
Location of work (street address) 1 \ y ' �' 21\ CP
�CLLANLC�L
Contractor
Address of contractor
t7zvF SAL/
Contact name & telephone number of contractor
L\ &? cL
LLC,
Name of property owner `--\ S " ` F± "` A K)
Mailing address of property owner ?- 6 ` 1J 6X a (� 6 71 f 3 Pee. g 13°2 R
Telephone number of property owner 1
Residential Commercial
New Work Replacement II �Q
Details of project � ?Lack U I�� `� u S SvU t N y
dow (u PtizA. et.-.3 CO /./J_Q-0,seA__ (R4v4c;;Ak
Estimated cost of construction
a7 an -eo
Permit Number
Date work will be ready for inspection, if known
2 ,3 -576,
— o , b ; 4k la 4orM -.
ATTENTION:
Inspections for Mechanical Permits are required and will be in accordance with the
International Residential Code or the International Mechanical Code and the Georgia
Amendments.
Requirements for "change- outs" will not be less than the requirements for new installations. In
addition, elevation of outside condensing units for FEMA compliance is required. Plan
accordingly. Plea - ask if you have any questions.
Owner /Contractor signature
Yi2
C
/2 /
Owner /Contractor printed name
e 2o//3
D ate cat;dv,,_)
-2a -13
A \- 5 13