Loading...
HomeMy Public PortalAboutELEVENTH TE_1.pdfCity of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 Malars INTERNATIONAL CODE COUNCIL' MEMBER Permit No. 49-d d 5 %(a Date Requested Owner's Name .. RFP- 1flA1 Date Needed e ef/.14/43 Gen. Contractor 4r 5,'/1Y Ari-i Subcontractor Contact Information /L L L, d !lJ - 1.‘ 3 / Project Address / EL f VfA17.-1 Scope of Work 0/4e /! t% /1 62,4 IA SL`s ?, 7 ,47 F0,4;>0 Inspector '7/' Inspection / /A /f%C.... Date of Inspection Pass / / Fail ® Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail ❑ Fee Inspection Pass D Fail ❑ Fee 0� DATE ISSUED: 08 -20 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT R &R HEAT PUMP, COND, PLATFORM 1 ELEVENTH TER ELIZABETH SHEEHAN PO BOX 2864 TYBEE ISLAND GA 31328 -2864 MCBRIDE MECHANICAL LLC PO BOX 61567 SAVANNAH GA 31420 P $ 69.00 PIN #4- 0007 -02 -032 $4,700.00 PERMIT #: 130516 TOTAL BALANCE DUE: $ 69.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 1/..-00a7- - 0 3.2 CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 MECHANICAL PERMIT APPLICATION Location of work (street address) 1 \ y ' �' 21\ CP �CLLANLC�L Contractor Address of contractor t7zvF SAL/ Contact name & telephone number of contractor L\ &? cL LLC, Name of property owner `--\ S " ` F± "` A K) Mailing address of property owner ?- 6 ` 1J 6X a (� 6 71 f 3 Pee. g 13°2 R Telephone number of property owner 1 Residential Commercial New Work Replacement II �Q Details of project � ?Lack U I�� `� u S SvU t N y dow (u PtizA. et.-.3 CO /./J_Q-0,seA__ (R4v4c;;Ak Estimated cost of construction a7 an -eo Permit Number Date work will be ready for inspection, if known 2 ,3 -576, — o , b ; 4k la 4orM -. ATTENTION: Inspections for Mechanical Permits are required and will be in accordance with the International Residential Code or the International Mechanical Code and the Georgia Amendments. Requirements for "change- outs" will not be less than the requirements for new installations. In addition, elevation of outside condensing units for FEMA compliance is required. Plan accordingly. Plea - ask if you have any questions. Owner /Contractor signature Yi2 C /2 / Owner /Contractor printed name e 2o//3 D ate cat;dv,,_) -2a -13 A \- 5 13